ML19308D169

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-302/72-03 on 720815-17 & 29-31. Noncompliance Noted
ML19308D169
Person / Time
Site: Crystal River 
Issue date: 10/11/1972
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Henderson J
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19308D170 List:
References
NUDOCS 8002270641
Download: ML19308D169 (1)


See also: IR 05000302/1972003

Text

a

n

q

-

.

h

[,i //,-[p D. ,,

UNITED STATES

'

,

s

ATOMIC ENERGY COMMISSION

V r. w p.,

om-ruxxxmxxxzr

AEoion n - suirE ets

-

-

e,

230 A E AC HT A EE ST R E ET, NCRT H *EST

Ts a

mumn

UJfig 4%

AT L A NT A, GEORGI A 30303

DIRECTORATE OF REGULATORY OPERATIONS

.

October ll, 1972

J. B. Henderson, Chief, Reactor Construction Branch

Directorate of Regulatory Operations, Headquarters

FLORIDA POWER CORPORATION (CRYSTAL RIVER 3), LICENSE NO. CPPR-51, DOCKET

NO. 50-302

The attached report of a routine announced inspection on August 15-17 and

29-31, 1972, is forwarded for information. Two items of noncompliance

relating to quality assurance were identified.

As a result of the principal inspector's telecon to FPC on September 26,

1972, commitments were made that should resolve the problems that have been

experienced with the effective implementation of the QA program at this

facility.

If the problems associated with the documentation of the decay

heat pump motors are not resolved prior to the next inspection, enforcement

action vill be taken.

A follovup inspection of the licensee's velding program vill be made within

the next month. This inspection vill be directed toward determining the

extent of the weaknesses observed during this inspection and to determine

if enforcement action is warranted.

.&

C. E. M p

,

ting Chief

RO:II:CEM

Reactor Test and Startup Branch

Enclosure:

RO Rpt. No. 50-302/72-3

(Warnick)

cc w/ enc 1:

RS, AD For Safety and Security Stds. (3)

L Asst. Director For Boil. Water Reactors (2)

L Asst. Director For Press. Water Recctors (2)

L Asst. Director For Operating Reactors (3)

L Asst. Director For Site Safety (2)

!

-

.

RO Office of Operations Evaluation

RO Asst. Dir. for Procedures

O

RO Asst. Dir. for Inspection & Enforcement

, , _ . . . .

' '" - *

\\

/

RO Files

DR Central Files

8002 270[p

.

-

_

_