ML19308C642
| ML19308C642 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 12/05/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML19308C643 | List: |
| References | |
| NUDOCS 8002010040 | |
| Download: ML19308C642 (2) | |
See also: IR 05000324/1979038
Text
Y
-
I/C
[
UNITED STATES
8
NUCLEAR REGULATORY COMMISSION
88 1
y,
a
REGION 11
o
101 MARIETTA ST
N.W., SUITE 3100
ATLANTA, GEORGIA 30303
.....-
DEC 0 51979
In Reply Refer To:
RII:LM
50-325/79-40
50-324/79-38
Carolina Power and Light Company
ATTN:
Mr. J. A. Jones, Senior Executive Vice President
and Chief Operating Officer
411 Fayetteville Street
Raleigh, NC 27602
Gentlemen:
This refers to the inspection conducted by L. Modenos of this office on
November 15-16, 1979, of activities authorized by NRC Operating License Nos.
DPR-71 and DPR-62 for the Brunswick Nuclear Plant facility, and to the discussion
'
of our findings held with F. To11ison at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
~
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room.
If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
~
,'
e
C. E. Murp y,
ief
Reactor Construction and Engineering
Support Branch
Enclosure:
See Page 2
e o02 olo 040
g
.
L
etr
.
DEC 0 5 E79
Carolina Power and Light Company
-2-
Enclosure:
Inspection Report Nos. 50-325/79-da
and 50-324/79-38
cc w/ encl:
A. C. Tollison, Jr.
Plant Manager
Box 458
Southport, NC 28461