LER-1978-007, /03L-0:on 780208,suction Valve 3LPSW-123 Observed Closed During 3B Pump Startup.Valve Closure Cause Unknown. Probably Caused by Erroneous Closing During Repairs on on Pervious Day.Valve Opened & Pump Checked for Damages |
| Event date: |
|
|---|
| Report date: |
|
|---|
| 2871978007R03 - NRC Website |
|
text
- - -
MAC Po24 384 u. 5. NUCLEAR RECULATORY CCMMi551oM f1 A1 LICENSEE EVENT REPORT EXHIBIT A CONTROL 5 Lock: l l
l l
l l
l@
(PLEASE PRINT OR TYPE ALL REQUIRED INFORM 4TIONI
- - l a t i l I si c i n I v i el' 3 l@16o f ol -l o I o f olo I o I - 10 l o 5@a l
4 11 11 I il 11@l I
l@
7 8.
uCENSEE CCOt i.
uCENSE Now.ER ucgust ry,g.o 53 Ga r se con'T
~
I, o l ' 1 Uu'*,% L2.j@lo I s b I olo i 2 I a I 7 GI o i 2 f o i s I 7 I 8 Gl o I-31t 13 I 7 I 8 l@
=
=
coC..r vo...
iv r o.r.
i.
1
..,c.,o.r.
avENT oescaimom Ano esce AeLs ccNsECUENCES h 1o121 1 Durine startup of 3B LPSW pump operator noticed that the suction valve,
[
lo is t l 3LPSW-123 was closed.
He ceased startup immediately.
The pump was restarted, EI after the valve was onened and found to be undamaged. The valve closure l
lo t s t I removed one train of the LPSW system from service but the other train was y
is is 1 I available to handle any accident situations.
No adverse effect on public LoJ.rJ l henith and safety was caused by this incident.
g 10 t d l l I
=
GCE CO E Sb C G COM8CNENT COO 4 fue C'E Su E
IW ID l@ W@ l X l@ [ Zl Zl Z l ZlZ l Z l@ lZ l@ [Z_J @
laisi i.
i, is is i.
i.
- o 3EQuthTi.L QCCUMagNCE
.tPCMT AEVISICM.
SV emf TfAp
CCCE Tvet go.
@,"LIRt.O lu7 l 81
[--J l0 f01 7l l/l lo l 3 l l Ll
[]
y
,5g u
a a
a u
n u
n u
a EN *c2EJ cEa?ET
'"w*Eo' sT cues 22 'E'E#5*,Ea".ide.
'"sL",'.?s7 uf=*u",'.*EE=*en I _j@l,.2.j@
1 Z I@
l ZI@
J O! 0!0 !
l X
.Lj@
l NI@
lZ l@
l71ojoIol@
(
u causs cesenimcN Anoccansenve acncNs @
titatl The ictual cause of the valve closure is unknown.
Evidently someone erron- ;
t i 1.U l ecusiv closed the valve during reoairs in the area on the day before.
- Since,
,,,2, I the exact cause is unknown, the applicable corrective action was the opening, l.i1.LJ l of the valve and checking the pump for any damage.
l i t.1 I I
7 e s ao STATV
%PCwtM QTi.tM57Afu5 Di RY CISCOvt4Y Ot3CRirTICM i i S I [I.j@ l 1 I o IO l@l NA l' [Aj@l operator observation l-r s a, g,y is is
=
as
.e so 8.u.....u-.lz.J @ L2J@l
- - 1
.. @ l
<oCA,,..C,..m..@
NA l
NA l
' ',me 'a
.,e.i
...C.i.,, @
m.,
ITTTl 1010 ! 01@lz_J@l NA l
' ' m o.L'i. Ji3 ossenierica@
wuw e.
l'TTil l 0 l o ! ol@t NA l
7 0 8 it i2
'ryfe**"xs'Cn',"tIo'""@
go d, W@l
~ NA _
l i.
- e,i,",,,,,,,, @
,,,, @l uae usa enLv LN NA 2 o I llllfIlIilIll s.
is es e,
so K. R. Wilson
,ycus, (700 373-8W Newso*Paaranen c
goo 1090 M 6
-- -- - + ~ ~'
7 m
s tj DUKE POWER COMPANY OCONEl'. UNIT 3 Report Number:
R0-287/78-7 Report Date: March 13, 1978 Occurrence Date:
February 8,1978 Facility:- Oconee Unit 3, Seneca, South Carolina Identification of Occurrence:
3LPSW' 123 Found Closed Conditions Prior to Occurrence:
100% Full Power Description of Occurrence:
On February 8,197'8, at 0940, the 3B Low Pressure Service Water (LPSW) pump was started.
When the operator noticed that the pump suction valve, 3LPSW-123, was closed, the pump was stopped.
Investigation by operating personnel determined that the valve had been closed since approximately 1600 on-February 7, 1978. Therefore, the pump had been ef fectively out-of-service for about 17 hours1.967593e-4 days <br />0.00472 hours <br />2.810847e-5 weeks <br />6.4685e-6 months <br />. The pump suction str.ainer had been serviced the pre-vious day at about the time of the valve closure, but the valve had not been required to be. closed by the procedure.
The valve was opened and the pump was verified as being undamaged by the incident.
Apparent Cause of Occurrence:
The exact cause of the valve closure is unknown. There are two. controls, for the valve, one in the control room and one in the area of the pump.
Discussions were held with_ perso'nnel in both areas, but none had any rec-ollection as to how the val've was closed or with regard as t,o who closed it.
Analysis of Occurrence:
The closure of 3LPSW' 123 rendered one train of the LPSW system inoperable.
However,'the control room could have opened the valve at any time if the train was needed. Technical Specification 3.3.5 allows one train to be inoperable for a period of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for test or maintenance, since one train is sufficient to provide necessary cooling in an accident situation.
One train was operable although the second train was inoperable for ar cause other than test or maintenance.
Pu,blic health and safety were.not endangered by this incident.
Corrective Action
The valve was opened after evaluation of the occurrence.
The pump was vented, restarted, and tested to assure that it had not sustaLned damage.
~
s
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000270/LER-1978-001-01, /01T-0:on 780113,both Level Instruments on Core Flood Tank 2A Found Out of Calibr.Cause Unknown.Both Channels of Level Instrumentation Calibr & Returned to Svc | /01T-0:on 780113,both Level Instruments on Core Flood Tank 2A Found Out of Calibr.Cause Unknown.Both Channels of Level Instrumentation Calibr & Returned to Svc | | | 05000287/LER-1978-001-03, /03L-0:on 780105,Valve FDW-108 Failed to Close After Sample Removal.Similar Valve Failures Occured Previously.Probably Caused by Inability to Withstand environ.FDW-1-6,108 Replaced W/Appropriately Designed Valve | /03L-0:on 780105,Valve FDW-108 Failed to Close After Sample Removal.Similar Valve Failures Occured Previously.Probably Caused by Inability to Withstand environ.FDW-1-6,108 Replaced W/Appropriately Designed Valve | | | 05000287/LER-1978-001, Forwards LER 78-001/03L-0 | Forwards LER 78-001/03L-0 | | | 05000270/LER-1978-001, Forwards LER 78-001/01T-0 | Forwards LER 78-001/01T-0 | | | 05000269/LER-1978-001-03, /03L-01:on 780103,valve 3LP-14 Failed to Cycle Manually.Caused by Unaligned Engaging Collar Slipping While Trying to Cycle.Collar Realigned,Setscrew & Handwheel Tightened | /03L-01:on 780103,valve 3LP-14 Failed to Cycle Manually.Caused by Unaligned Engaging Collar Slipping While Trying to Cycle.Collar Realigned,Setscrew & Handwheel Tightened | | | 05000269/LER-1978-002-03, /03L-01:on 780118,reactor Protection Sys Channel D Flow Indication Found High.Caused by Transmitter Failure Due to Blown Gasket.Gasket Replaced & Leak Stopped.Transmitter Will Be Replaced Unless It Can Be Recalibr | /03L-01:on 780118,reactor Protection Sys Channel D Flow Indication Found High.Caused by Transmitter Failure Due to Blown Gasket.Gasket Replaced & Leak Stopped.Transmitter Will Be Replaced Unless It Can Be Recalibr | | | 05000270/LER-1978-003, Forwards LER 78-003/03L-0 | Forwards LER 78-003/03L-0 | | | 05000269/LER-1978-003-03, /03L-0:on 780222,Keowee Hydro Unit 2 Failed to Start.Caused by Inoperable Field Flashing Breaker.Breaker & Control Sys Insp Revealed No Abnormalities.Breaker Failed on Three Other Occasions.Cause for Breaker Failure Not Know | /03L-0:on 780222,Keowee Hydro Unit 2 Failed to Start.Caused by Inoperable Field Flashing Breaker.Breaker & Control Sys Insp Revealed No Abnormalities.Breaker Failed on Three Other Occasions.Cause for Breaker Failure Not Known | | | 05000270/LER-1978-003-03, /03L-0:on 780301,during Performance Test,Control Rod Group 5 Experienced Momentary Loss of Power.Cause Undetermined.Mod to Increase Rod Control Power Source Reliability Planned for All Units | /03L-0:on 780301,during Performance Test,Control Rod Group 5 Experienced Momentary Loss of Power.Cause Undetermined.Mod to Increase Rod Control Power Source Reliability Planned for All Units | | | 05000269/LER-1978-004-01, /01T-0:on 780301,1B Circuit Breaker Closed During Shift to High Speed.Caused by Improperly Adjusted Instantaneous Trip Setpoint.Breaker Reset & Setpoint Adjusted | /01T-0:on 780301,1B Circuit Breaker Closed During Shift to High Speed.Caused by Improperly Adjusted Instantaneous Trip Setpoint.Breaker Reset & Setpoint Adjusted | | | 05000287/LER-1978-004, Forwards LER 78-004/03L-0 | Forwards LER 78-004/03L-0 | | | 05000270/LER-1978-004, Forwards LER 78-004/01T-0 | Forwards LER 78-004/01T-0 | | | 05000287/LER-1978-004-03, /03L-0:on 780203,valve BS-3 Failed to Open During Operability Test.Caused by Torque Switch Electrical Failure. Switch Replaced & Valve Operability Verified | /03L-0:on 780203,valve BS-3 Failed to Open During Operability Test.Caused by Torque Switch Electrical Failure. Switch Replaced & Valve Operability Verified | | | 05000270/LER-1978-004-01, /01T-0:on 780323,review of Power & Heat Indicatios Revealed That on 4 Occasions Instrumentation Found Out of Calibr.Caused by Error Exceeding Assumed Max Valve Before Completion of Recalibr | /01T-0:on 780323,review of Power & Heat Indicatios Revealed That on 4 Occasions Instrumentation Found Out of Calibr.Caused by Error Exceeding Assumed Max Valve Before Completion of Recalibr | | | 05000287/LER-1978-005-03, /03L-0:on 780207,valve BS-2 Failed in Intermediate Position During Operability Test.Caused by Valve Stem Failure & Partly by Faulty Torgue Switch.Stem & Switch Replaced.Stems Made by Walworth | /03L-0:on 780207,valve BS-2 Failed in Intermediate Position During Operability Test.Caused by Valve Stem Failure & Partly by Faulty Torgue Switch.Stem & Switch Replaced.Stems Made by Walworth | | | 05000287/LER-1978-005, Forwards LER 78-005/03L-0 | Forwards LER 78-005/03L-0 | | | 05000269/LER-1978-006, Forwards RO-269/78-06 & LER 78-006/03L-0 | Forwards RO-269/78-06 & LER 78-006/03L-0 | | | 05000287/LER-1978-006, Forwards LER 78-006/03L-0 | Forwards LER 78-006/03L-0 | | | 05000270/LER-1978-006, Forwards Corrected LER 78-006/03L-01 | Forwards Corrected LER 78-006/03L-01 | | | 05000270/LER-1978-006-03, /03L-01:on 780407,reactor Coolant Leak Rate Exceeded 1 Gallon Per Minute, Due to Spray Control Block Valve 2RC-3 Packing & Pressurizer Heater Bundle Leaks.Caused by Blown Packing & Flange Seal Failure | /03L-01:on 780407,reactor Coolant Leak Rate Exceeded 1 Gallon Per Minute, Due to Spray Control Block Valve 2RC-3 Packing & Pressurizer Heater Bundle Leaks.Caused by Blown Packing & Flange Seal Failure | | | 05000269/LER-1978-006-03, /03L-0:on 780305,Keowee Hydro Unit 2 Failed to Start.Caused by Inoperable Field Flashing Breaker.Breaker Failed on Three Previous Occasions (ROs 269/77-29,269/78- 01 & 269/78-03).Cause Unknown & Under Investigation | /03L-0:on 780305,Keowee Hydro Unit 2 Failed to Start.Caused by Inoperable Field Flashing Breaker.Breaker Failed on Three Previous Occasions (ROs 269/77-29,269/78- 01 & 269/78-03).Cause Unknown & Under Investigation | | | 05000287/LER-1978-006-03, /03L-0:on 780210,Control Rod 3,Group 4,dropped Into Core During Breaker Test,Causing Power Runback to 55%. Caused by Stator Short Due to Excessive Moisture Entering Through Nonleakproof O-ring Seal.Stator Replaced | /03L-0:on 780210,Control Rod 3,Group 4,dropped Into Core During Breaker Test,Causing Power Runback to 55%. Caused by Stator Short Due to Excessive Moisture Entering Through Nonleakproof O-ring Seal.Stator Replaced | | | 05000287/LER-1978-007, Forwards LER 78-007/03L-0 | Forwards LER 78-007/03L-0 | | | 05000287/LER-1978-007-03, /03L-0:on 780208,suction Valve 3LPSW-123 Observed Closed During 3B Pump Startup.Valve Closure Cause Unknown. Probably Caused by Erroneous Closing During Repairs on on Pervious Day.Valve Opened & Pump Checked for Damages | /03L-0:on 780208,suction Valve 3LPSW-123 Observed Closed During 3B Pump Startup.Valve Closure Cause Unknown. Probably Caused by Erroneous Closing During Repairs on on Pervious Day.Valve Opened & Pump Checked for Damages | | | 05000270/LER-1978-007-01, /01T-0:on 780427,reactor Bldg Purge Filters Exceeded Tech Spec 4.14 Surveillance Requirements.Caused by Failure to Verify Filter Operability.Fuel Movement Suspended Until Filters Tested & Procedures Reviewed | /01T-0:on 780427,reactor Bldg Purge Filters Exceeded Tech Spec 4.14 Surveillance Requirements.Caused by Failure to Verify Filter Operability.Fuel Movement Suspended Until Filters Tested & Procedures Reviewed | | | 05000269/LER-1978-007, Forwards LER 78-007/03L-0 & 78-009/03L-0 | Forwards LER 78-007/03L-0 & 78-009/03L-0 | | | 05000270/LER-1978-007, Forwards LER 78-007/01T-0 | Forwards LER 78-007/01T-0 | | | 05000269/LER-1978-007-03, /03L-0:on 780314,Unit 2 Failed to Start.Caused by Field Flashing Breaker Failure.Breaker Failed Four Times Previously.Cause of Breaker Failure Not Determined. Monitoring & Investigation Will Continue | /03L-0:on 780314,Unit 2 Failed to Start.Caused by Field Flashing Breaker Failure.Breaker Failed Four Times Previously.Cause of Breaker Failure Not Determined. Monitoring & Investigation Will Continue | | | 05000270/LER-1978-008-03, /03L-6:on 780428,valve 2LPSW-251 Remained Throttled After PT/1/A/0251/01 (Low Pressure Svc Water Pump Performance Test).Caused by Defective Procedures.Valve Returned to Normal & Procedures Revised | /03L-6:on 780428,valve 2LPSW-251 Remained Throttled After PT/1/A/0251/01 (Low Pressure Svc Water Pump Performance Test).Caused by Defective Procedures.Valve Returned to Normal & Procedures Revised | | | 05000269/LER-1978-008-03, /03L-0:on 780315,valve 1FDW-108 Failed to Close. Failure Has Occurred Previously.Caused by Apparent Inability to Withstand Environ.Valves FDW-106 & 108 Will Be Replaced W/Valves of Appropriate Design | /03L-0:on 780315,valve 1FDW-108 Failed to Close. Failure Has Occurred Previously.Caused by Apparent Inability to Withstand Environ.Valves FDW-106 & 108 Will Be Replaced W/Valves of Appropriate Design | | | 05000270/LER-1978-008, Forwards LER 78-008/03L-6 | Forwards LER 78-008/03L-6 | | | 05000287/LER-1978-008-03, /03L-0:on 780305,power Range Detector Found Spiking.Reactor Protection Sys Channel a Bypassed,Preventing Spurious Trips.Cause Not Determined.Investigation to Resume Next Refueling or Next Spiking | /03L-0:on 780305,power Range Detector Found Spiking.Reactor Protection Sys Channel a Bypassed,Preventing Spurious Trips.Cause Not Determined.Investigation to Resume Next Refueling or Next Spiking | | | 05000287/LER-1978-008, Forwards LER 78-008/03L-0 | Forwards LER 78-008/03L-0 | | | 05000269/LER-1978-009-03, /03L-0:on 780322,Unit 2 Failed to Start.Caused by Field Flashing Breaker Failure.Breaker Failed on Five Previous Occasions.No Cause for Breaker Failure Found. Monitoring & Investigation Will Continue | /03L-0:on 780322,Unit 2 Failed to Start.Caused by Field Flashing Breaker Failure.Breaker Failed on Five Previous Occasions.No Cause for Breaker Failure Found. Monitoring & Investigation Will Continue | | | 05000287/LER-1978-009-03, /03L-0:on 780320,valve HP-24 Failed to Open When Manually Actuated During Performance Test.Caused Probably by Dirt on Operator Contacts.Contacts Cleaned & Valve Operated Properly | /03L-0:on 780320,valve HP-24 Failed to Open When Manually Actuated During Performance Test.Caused Probably by Dirt on Operator Contacts.Contacts Cleaned & Valve Operated Properly | | | 05000270/LER-1978-009, Forwards LER 78-009/03L-0 | Forwards LER 78-009/03L-0 | | | 05000287/LER-1978-009, Forwards LER 78-009/03L-0 | Forwards LER 78-009/03L-0 | | | 05000270/LER-1978-009-03, /03L-0:on 780627,Control Rod 6,Group 4,found to Have Short in Control Rod Drive Line Stator,Which Would Preclude Normal Power Movement.Caused by moisture-induced Corrosion.Shorted Stator Repaired 780701 | /03L-0:on 780627,Control Rod 6,Group 4,found to Have Short in Control Rod Drive Line Stator,Which Would Preclude Normal Power Movement.Caused by moisture-induced Corrosion.Shorted Stator Repaired 780701 | | | 05000269/LER-1978-010-01, /01T-0:on 780324,Unit 2 Not Verified Operable within Tech Specs Limit.Caused by Failure to Properly Issue & Follow Procedures Which Resulted in Exceeding Tech Spec Limits.Personnel Reinstructed & Procedures Rewritten | /01T-0:on 780324,Unit 2 Not Verified Operable within Tech Specs Limit.Caused by Failure to Properly Issue & Follow Procedures Which Resulted in Exceeding Tech Spec Limits.Personnel Reinstructed & Procedures Rewritten | | | 05000269/LER-1978-010, Forwards LER 78-010/01T-0 | Forwards LER 78-010/01T-0 | | | 05000287/LER-1978-010-03, /03L-0:on 780322,no Flow Found Through B LPIS Cooler During Performance Test.Caused by Broken Valve Position Indicator.Valve Opened & Indicator Repaired | /03L-0:on 780322,no Flow Found Through B LPIS Cooler During Performance Test.Caused by Broken Valve Position Indicator.Valve Opened & Indicator Repaired | | | 05000287/LER-1978-012, Forwards LER 78-012/01T-0 | Forwards LER 78-012/01T-0 | | | 05000287/LER-1978-012-01, /01T-0:on 780804,weld Filler Wires Found Mixed W/Shipment of Mn-Mo-Ni Filler Wires.Nsss Vendor Supplied W/Wire Containing Atypical Matl Composition.Unit Operation Continues W/Restrictive pressure-temp Limits | /01T-0:on 780804,weld Filler Wires Found Mixed W/Shipment of Mn-Mo-Ni Filler Wires.Nsss Vendor Supplied W/Wire Containing Atypical Matl Composition.Unit Operation Continues W/Restrictive pressure-temp Limits | | | 05000269/LER-1978-013-01, /01T-0:on 780421,primary-to-secondary Leak Indicated.Caused by Leaking Tubes Due to Weld Crack.Five Tubes Plugged.Investigations by Util & B&W Continuing | /01T-0:on 780421,primary-to-secondary Leak Indicated.Caused by Leaking Tubes Due to Weld Crack.Five Tubes Plugged.Investigations by Util & B&W Continuing | | | 05000269/LER-1978-015-03, /03L-0:on 780604,breakers PCB-17 & PCB-18 Tripped W/O Apparent Cause & Took Startup Transformer CT1 Out of Svc.No Cause or Corrective Action Determined.Breakers & Circuits Checked & No Abnormalities Found | /03L-0:on 780604,breakers PCB-17 & PCB-18 Tripped W/O Apparent Cause & Took Startup Transformer CT1 Out of Svc.No Cause or Corrective Action Determined.Breakers & Circuits Checked & No Abnormalities Found | | | 05000269/LER-1978-015, Forwards LER 78-015/03L-0 | Forwards LER 78-015/03L-0 | | | 05000269/LER-1978-020, Forwards LER 78-020/03L-0 | Forwards LER 78-020/03L-0 | | | 05000269/LER-1978-020-03, /03L-0:on 780829,during Steady State Operation, Valve LPSW-21 (Reactor Bldg Cooling Unit 1B Cooling Water Discharge Valve)Failed to Operate Properly.Caused by Misalignment of Gearing Between Valve & Operator | /03L-0:on 780829,during Steady State Operation, Valve LPSW-21 (Reactor Bldg Cooling Unit 1B Cooling Water Discharge Valve)Failed to Operate Properly.Caused by Misalignment of Gearing Between Valve & Operator | | | 05000269/LER-1978-021, Forwards LER 78-021/01T-0 | Forwards LER 78-021/01T-0 | | | 05000269/LER-1978-021-01, /01T-0:on 780914,during Review of Calibr Data Following Annual Surveillance Testing,Transmitters PT-4 & PT-6 Were Nonconservatively Out of Calibr.Caused by Excessive Temp & Humidity within Penetration Room | /01T-0:on 780914,during Review of Calibr Data Following Annual Surveillance Testing,Transmitters PT-4 & PT-6 Were Nonconservatively Out of Calibr.Caused by Excessive Temp & Humidity within Penetration Room | |
|