Forwards IE Bulletin 77-10, Assurance of Safety & Safeguards During Emergency - Locking Sys. Action Required
ML19308B149
Person / Time
Site: Oconee, Mcguire, McGuire  Duke Energy icon.png
Issue date: 12/28/1977
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
References
NUDOCS 7912130803
Download: ML19308B149 (2)


Text

.O

~

SP E8C

&q(o UNITED STATES

/'

NUCLEAR REGULATORY COMMISSIO..

,[ [ /

,,e

,p y

[

p S~. ( ; q REGloN lt

_, A ' [ ^ *~ ~ ~ p,~ "

= *- \\ W ' /

g 230 PEACHTREE STREET. N W. OUlTE 1217

%.)h,$.

DEC 2 81977

[

c, ATLANT A. GEoRCI A 30303 C /'

j7 v-In Reply Refer To:

RII:JPO 50-369, 50-370 i

50-269, 50-270 50-287 Duke Power Company Attn:

Mr. William O. Parker, Jr.

Vice President, Steam Production P. O. Box 2178 422 South Church Street Charlotte, North Carolina 28242 Gentlemen:

Enclosed is IE Bulletin No. 77-08 which requires action by you with regard to your power reactor facility (ies) having an operating license or a construction permit.

Should you have any questions regarding this Bulletin or the actions required, please contact this office.

Sincerely, ames P. O Reilly Director

Enclosures:

i 1.

IE Bulletin No. 77-08 2.

List of IE Bulletins Issued in 1977 cc w/ encl:

J. C. Rogers, Proj ect Manager McGuire Nuclear Station P. O. Box 2178 l

Charlotte, North Carolina 28242 M. D. McIntosh, Plant Manager McGuire Nuclear Station-i P. O. Box 488 Cornelius, North Carolina

.28031 N912130fC3 J

DEL 2 g 977 Duke Power Company cc's continued J. E. Smith, Station Manager Oconee Nuclear Station P. O. Box 1175 Seneca, South Carolina 29678

/

UNITED STATES NUCLEAR REGUMTORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMEhi WASHINGTON, D. C.

20555 December 28, 1977

)

IE Bulletin 77-08 I

ASSURANCE OF SAFETY AND SAFEGUARDS DURING AN EMERGENCY - LOCKING SYSTE"3 Description of Circumstances:

Under energency conditions, prompt ingress into certain safety-related areas must be assured to enable saf e shutdown of a nuclear power plant, and unimpeded egress from all parts of the facility must be assured in the interest of life safety. The circumstances described below indicate that prompt ingress and unimpeded egress under emergency conditions may not be assured at all nuclear power plants.

At one nuclear power plant, upon loss of offsite power resulting in a scram of the reactor, all electrically locked doors to vital areas failed for lack of auxiliary power.

(Although, the electrical circuit blue prints indicated that the electrical locking system was connected to the vital bus to provide uninterrupted auxiliary power, the control console for the locking system had act been so connected.) This failure delayed ingress by ope sas personnel into several safety-related areas because they had to await arrival of a guard with the one immediately available key. Other security keys were at the facility but were either secured or held by a person who was unaware of what the keys would unlock.

Concurrent with the above situation, three employees were isolated without an adequate emergency escape route available to them. The two accessible doors on that level had been secured, one by a failed elec-trical locking device and the other by a lock which could be opened only by the grand-master key which they did not possess.

Further, the second door was blocked from the opposite side.

The only other escape route which could be considered was an unenclosed stairwell leading to other levels, but it was blocked by hot water flowing from the turbine floor above. The employees telephoned for assistance and were released by a guard who came through the cable spreading room and opened the failed door from within.

1 of 4

?

SELGD i

~

IE Bulletin No. 77-08 December 28, 1977 During an NRC inspection at another nuclear power plant it was observed that two exterior energency exit doors were chained and padlocked from within. Although the padlocks were of the " breakable" shackle type, substantial force would be required to break them and unimpeded egress in an emergency was not assured.

At a third nuclear plant, a technician conducting tests accidently caused a scram, turbine trip, and loss of station power.

Some electrical locking devices securing safety-related areas were supplied only from non-vital buses which were stripped of their loads in the process of transferring to secondary power sources. The electrical locking devices failed and delayed the ingress of additional plant personnel to assist in the shutdown of the plant.

Finally, information available to the NRC indicates that licensees at many other nuclear power plants utilize or plan to utilize electrical locking devices for vital areas, protected areas, and non-security ar ea s. Some of the plants do not have auxiliary power for a portion of or all of the electrical locking systems, and these systems could fail in such a way that prompt ingress or unimpeded egress would not be assured.

Discussion of Applicable Requirements:

Appendix E of 10 CFR Part 50 provides that (a) the capability for piant evacuation, and (b) the capability for facility reentry in order to mitigate the consequences of an accident or, if appropriate, to continue operrtions, must be assured.

Electrical locks not provided with auxiliary power cannot be maintained in an operable conditicn (10 CFR 73.55(g)(1)), and electrical locks which fail in the open mode are not providing the required locking (73. 55(d) (7)).

It should be noted that the NRC is currently reviesing amended Security Plans submittsd in response to the requirements of 10 CFR 73.55.

That review will encompass prompt emergency ingress and unimpeded egress through security related doors in conjunction with positive access controls at facilities having an operating license 2 of 4 e

9 me t e e e =

IE Bulletin No. i 38 December 28, 1977 The National Fire Protection Association Standard NFPA 101 is a generally accepted national standard known as the " Life Safety Code."

NFPA 101 is the basis of certain regulations of the Occupational Safety and Health Administration (29 CFR 1910) and the fire regulations and life safety codes of a significant number of States.

This standard addresses in detail the number, locations, widths, and routes to emergency exits.

it further details safety requirements for stairwell escape routes, describes route and exit markings, and specifically instructs against the installation of a lock or other fastening on an emergency exit that would prevent escape from the inside of the building.

Action to be Taken by Licensee and Permit Holders:

1.

Survey your facility and facility plans to determine whether the following situations exist:

Prompt emergency ingress into electrically locked safety-a.

related areas by essential personnel is assured in any postulated occurrence through the combined use of features (1), (2), and (3) below or the equivalent.

(1) Provide reliable and uninterruptable auxiliary power to the entire electrical locking system, including its controls; and (2) Provide the electrical locking devices, which are required to fail in the secure mode for security purposes, with secure mechanical means and associated procedures to override the devices upon loss of both primary and auxiliary power (e.g., key locks with keys held by appropriate personnel who knou when and how to use them);

and (3) Provide periodic tests of all locking systems and mechanical overrides to confirm their operability and their capability to switch to auxiliary power.

b.

Unimpeded emergency egress is assured from all parts of your facilities, the security hardware and systems are designed and installed so as to not degrade life safety, and such hardware and systems are in conformance with applicable (State /

Local) fire regulations and life safety codes.

3 of 4 e

e i

l

.~

Nam e

w IE Bulletin 77-08 December 28, 1977 2.

Review existing emergency plans and procedures to assure that prompt emergency ingress and unimpeded emergency egress are fully and effectively addressed for any postulated occurrence.

3.

Assure that prompt emergency ingress and unimpeded egress tl. rough security doors at facilities with an operating license are thoroughly described in submittals pursuant to 10 CFR 73.55.

4.

In the event that surveys or reviews required by action items 1 and 2 establish that the facility does not meet the requirements noted in these items, holders of an operating license shall provide a written report to the appropriate NRC Regional Office within 45 calendar days of receipt of this Bulletin.

The required report will clearly describe all identified problem areas together with proposed corrective actions. Holders of construction permits will respond in like manner within 60 calendar days of receipt of this Bulletin.

If your facility is in full conformance with the requirements noted, no response to this Bulletin is required.

Approved by GAO, B180225(R0072); clearances expires 7-31-80.

Approval was given under a blanket clearance specifically for identified generic problems.

4 of 4 O

IE Bulletin No. 77-08 December 28, 1977 LISTING OF IE BULLETINS ISSUED IN 1977 BULLETIN Subject Date Issued Issued To No.

i 77-07 Containment Electrical 12/19/77 All Power Reactor Penetration Assemblies at Facilities with a Nuclear Power Plants Under Construction Const.uction Permit 77-06 Potential Problems with 11/22/77 All Power Reactor Containment Electrical Facilities with Penetration Assemblies an Operating License (OL)77-05A Supplement 77-05A to 11/14/77 All Power Reactor IE Bulletin No. 77 Facilities with Electrical Connector an Operating Assemblies License (OL) or Construction Permit (CP) 77-05 Electrical Connector 11/8/77 All Power Reactor Assemblies Facilities with an Operating License (OL) or Construction Permit (CP) 77-04 Calculational Error 11/4/77 All PWR Power Affecting the Design Reactor Facilities Performance of a System with an Operating for Controlling pH of License (OL) or Containment Sump Water Construction Following a LOCA Permit (CP) 1 of 2 l

IE,ulletin No. 77-08 December 28, 1977 r

LISTING OF IE BULLETINS ISSUED IN 1977 BULLETIN Subject Date Issued Issued To l

No.

k 77-03 On-Line Testing of 9/12/77 All W Power the W Solid State Reactor Facilities Protection System with an Operating License (OL) or Construction Permit (CP) 77-02 Potential Failure 9/12/77 All Holders of Mechanism in Certain Operating Licenses W AR Relays with (OL) or Construction Latch Attachments Permits (CP) 77-01 Pneumatic Time 4/29/77 All Holders of Delay Relay Set Operating Licenses Point Drift (OL) or Construction Permit (CP) 2 of 2 O

gum =4uun m

.e