ML19305E525
| ML19305E525 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 04/10/1980 |
| From: | Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Strand N WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML19305E526 | List: |
| References | |
| NUDOCS 8005200021 | |
| Download: ML19305E525 (2) | |
See also: IR 05000508/1980002
Text
i
a nc ,
NC
o
o
UNITED STATES
6005200021
8 -
'a
NUCLEAR REGULATORY COMMISSION
$ ,'
- [$
REGION V
o,
1990 N. CALIFORNIA BOULEVARD
d'
SUITE 202, WALNUT CREEK PLAZA
se.,e
- NALNUT CREEK, CALIFORNIA 94596
.
APR le 1980
Docket Nos. 50-508
50-509
Washington Public Power Supply System
P. O. Box 468
Richland, Washington 99352
Attention: Mr. N. O. Strand
Managing Director
Gentlemen:
Subject:
NRC Inspection - WNP 3 and 5
This refers to the inspection conducted by Messrs. D. F. Kirsch and
W. J. Wagner of this office during the period of March 6 - 9 and
March 18 - 19,1980, of activities authorized by NRC Construction Permit
Hos. CPPR-154 and CPDR-155, and to the discussion c# our findings held
with Mr. W. J. Talbott and other members of your staff at the conclusion
of the inspection.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, inter-
views with personnel, and observations by the inspector.
No items of noncompliance with NRC requirements were identified within
the scope of this inspection.
In accordance with Section 2.890 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public Docu-
ment Room.
If this report contains any information that you believe to
be proprietary, it is necessary that you submit a written application to
this office, within 20 days of the date of this letter, requesting that
such infUrmtim be withheld from public disclosure.
The application
must include a full statement of the reasons why it is claimed that the
'
information is proprietary. The application should be p~repared so that
. _ . _
-2-
APR 101960
'
,
.
any proprietary information identified is contained in an enclosure to
j
the application, since the application without the enclosure will also
be placed in the Public Document Room.
If we do not hear from you in
this regard within'the specified period, the report will be placed in
,
the Public Document Room.
I
'
Should you have any questions concerning this matter, we will be glad
to discuss them with you.
Sincerely,
j
G. S. Spencer, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection Report
Nos. 50-508/80-02
50-509/80-02
cc w/o enclosure:
M. E. Witherspoon, Division Manager
-Quality Assurance, WPPSS
cc w/ enclosure:
W. J. Talbott, Division Manager, WPPSS
!
1
A
. _ _ _ . _ _ . .