Forwards IE Insp Repts 50-321/80-04 & 50-366/80-04 on 791212-800104 & Notice of Violation
ML19305D484
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 02/14/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19305D474 List:
References
NUDOCS 8004150142
Download: ML19305D484 (2)


See also: IR 05000321/1980004

Text

_-

_ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

,..

.

.

p(/

  1. pn nog'o,

UNITED STATES

8

%

NUCLEAR REGULATORY COMMISSION

$

E

REGION 11

g[

o,

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

FEB 14 E O

In Reply Refer To:

RII:RFRIII

50-321/80-4

50-366/80-4

Georgia Power Company

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

'

Gentlemen:

,

This refers to the inspection conducted by R. F. Rogers of this office on

December 12,

1979 through January 4,

1980 of activities authorized by NRC

Operating License No. DPR-57 and License No. NPF-5 for the Hatch facility, and

to the discussion of our findings held with M. Manry at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions. Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved.

,

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

,

the information is proprietary, and should be prepared so that proprietary infor-

!

mation identified in the application is contained in a separate part of the

document.

If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

1

..

8004150 jg

.

.

.

,

FEB 141980

Georgia Power Company

-2-

Should you have any questions concerning this letter, we will be glad to discuss

them teith you.

Sincerely,

,

(

,

t

$N~

,

R. C. Lewis, Acting Chief

Reactor Operations and Nuclear

+

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-321/80-4

,

and 50-366/80-4

cc w/ enc 1:

M. Manry, Plant Manager

P. O. Box 442

Baxley, GA 31513

,

!

C. E. Belflower

Site QA Supervisor

2

P. O. Box 442

Baxley, GA 31513

W. A. Widner

Vice President and General Manager

'

Nuclear Generation