g APPENDIX A NOTICE OF VIOLATION Florida Power Corporation License No. DPR-72 Crystal River 3 Based on the NRC inspection October 29 - November 2, 1979, certain of your activities were apparently not conducted in full compliance with NRC require-ments as indicated below. These items have been categorized as described in correspondence to you dated December 31, 1974.
As required by Technical Specification 6.8.1.a, written administrative procedures shall be established, implemented, and maintained covering the area of equipment control, as recommended in Appendix "A" of Regulatory Guide 1.33, November, 1972. Section 6.1.9 of Compliance Procedure CP-115, "In-Plant Equipment Clearance and Switching Orders," stipulates that, the required operating position of all valves in an engineered safeguards system, within the boundaries of the clearance, shall be independently verified prior to releasing the clearance on the boundary valves.
Contrary to the above, In-Plant Equipment Clearance Number 10-48 was released on October 22, 1979 without having performed an independent verification of the required operating positions of all valves, in the Nuclear Services Closed Cycle Cooling Water System, within the boundaries of the clearance.
This is an Infraction.