ML19305B895
| ML19305B895 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 01/28/1980 |
| From: | Hancock J FLORIDA POWER CORP. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19305B893 | List: |
| References | |
| CS-80-33, NUDOCS 8003200570 | |
| Download: ML19305B895 (1) | |
Text
- _ - _ _ -.
,b
, font;.
- g e..yp;.3n v
gg
- g Ib, ii UCim.C REGGN
- :
ri E
% t. NT/.. G O' %! A
'c Q-f Gf c
ey geh
.] J/d' 30 All-H !
Florida 28 January 1980 Power 3-o-3-a-2 coneaan,o=
CS-80-33 Mr. J. P. O'Reilly, Director Docket No. 50-302 Office of Inspection & Enforcement Licensee No. DPR-72 U.S. Nuclear Regulatory Commission Ref.
RII:DRQ 101 Marietta St., Suite 3100 50-302/79-46 Atlanta, CA 30303
Dear Mr. O'Reilly:
We offer the following response to the apparent Item of Noncompliance in the referenced inspection report.
NOTICE OF VIOLATION As required by Technical Specification 6.8.1.a, written administrative procedures shall be eslablished, implemented, and maintained covering the area of equipment control, as recommended in Appendix "A" of Regula-tory Guide 1.33, November 1972.
Section 6.1.9 of Compliance Procedure CP-115, "In-plant Equipment Clearance and Switching Orders", stipulates that, the required operating position of all valves in an engineered safe-guards system, within the boundaries of the clearance, shal.1 be independ-ently verified prior to releasing the clearance on the boundary valves.
Contrary to the above, In-plant Equipment Clearance Number 10-48 was re-leased on October 22, 1979 without having performed an independent veri-fication of the required operating positions of all valves, in the Nuclear
]
Services Closed Cycle Cooling Water System, within the boundaries of the clearance.
,o Response: The responsible individual involved with this item has been cautioned as to the requirements of CP-115, in regard to independent veri-fication prior to releasing the clearance. This violation has been reviewed with all shift supervisors and assistant shift supervisors as a means to pr event recurrence. We feel full compliance has been achieved.
Should there be further questions, please contact us.
Very truly yours, FIJ POWER RPORATION j!
/)I*)}fS/4, & f 3)A.Mancock'
~
Nuclear Plant Manager Director, Nuclear Operatio s 0 0 $@
t o N'I General Office 3201 Thirty fourth Street South e P O Box 14042, St. Petersburg. Rorda 33733 813-8M5151 OmomL ODW