ML19305B648
| ML19305B648 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 01/29/1980 |
| From: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML19305B649 | List: |
| References | |
| NUDOCS 8003200030 | |
| Download: ML19305B648 (2) | |
See also: IR 05000445/1979031
Text
_
/g C_.
- ~~
UNITED STATES
- ps acoq'o,
NUCLEAR REGULATORY COMMISSION
[
R EGloN IV
,
c
<
o
611 RYAN PLAZA DRIVE, SUITE 1000
%'
- j
ARLINGTON, TEXAS 76012
o
a
4
0
4....
4
January 29, 1980
In Reply Refer To:
RIV
Docket No. 50-445/Rpt. 79-31
50-446/Rpt. 79-29
-
Texas Utilities Generating Company
ATTN:
Mr. R. J. Gary, Executive Vice
President and General Manager
2001 Bryan Tower
Dallas, Texas
75201
Gentlemen:
This refers to the inspection conducted by Messrs. L. D. Gilbert and R. C. Stewart
of our staff during the periods December 18-20, 1979, and January 15-16, 1980, of
activities authorized by NRC Construction Permits No. CPPR-126 and 127 for the
Comanche Peak facility, Units No.1 and 2, and to the discussion of our findings
with Mr. R. G. Tolson and other renbers of your staff at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with Appendix B to 10 CFR 50 of the NRC Regulations,
" Quality Assurance Criteria for Nuclear Power Plants." The item of noncompliance
and references to the pertinent requirements are identified in the enclosed Notice
of Violation.
This notice is sent to you pursuant to the provisions of Section 2.201 of the
NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section
2.201 requires you to submit to this office, within 30 days of your receipt of this
notice, a written statement or explanation in reply including: (1) corrective steps
which will be taken by you, and the results achieved;- (2) corrective steps which
will be taken to avoid further noncompliance; and (3) the date when full compliance
will be' achieved.
80032 00 ego
.
Texas Utilities Generating
Company
-2-
January 29, 1980
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If the
report contains any information that you believe to be proprietary, it is
necessary that you submit a written application to this office, within 20 days
of the date of this letter, requesting that such information be withheld from
public disclosure.
The application must include a full statement of the reasons
why it is claimed that the information is proprietary.
The application should
be prepared so that any proprietary information identified is contained in an
enclosure to the application, since the application without the enclosure will
also be plat d in the Public Document Room.
If we'do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
,
.
W. C. Seid
, Chief
Reactor Con truction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
IE Inspection Report No. 50-445/79-31
50-446/79-29
cc: w/ enclosures
Texas Utilities Generating Company
ATTN:
Mr. H. C. Schmidt, Project Manager
2001 Bryan Tower
Dallas, Texas
75201
.,
a
l
F