IE Insp Repts 50-445/79-31 & 50-446/79-29 on 791218-20 & 800115-18.Noncompliance Noted:Failure to Follow Welding Procedures
ML19305B660
Person / Time
Site: Comanche Peak  
Issue date: 01/28/1980
From: Crossman W, Gilbert L, Stewart R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19305B649 List:
References
50-416-79-29, 50-445-79-31, NUDOCS 8003200045
Download: ML19305B660 (1)


See also: IR 05000445/1979031

Text

_ _ _ _ .

._

_______-- - __ _ ___

___

(")

'

.

"

l

1

U. S. NUCLEAR REGULATORY COMMISSION

0FFICE OF INSPECTION AND ENFORCEMENT

REGION IV

Report No. 50-445/79-31; 50-446/79-29

Docket No. 50-445; 50-446

Category A2

Licensee: Texas Utilities Generating Company

2001 Bryan Tower

Dallas, Texas

75201

Facility Name:

Comanche Peak, Units 1 and 2

Inspection at:

Comanche Peak Site, Glen Rose, Texas

Inspection conducted:

ecember 18-20, 1979, and January 15-18, 1980

2

/

iag/e

.L

.

_

-M

Inspectors:

/

R". C. StewarE;%edctor Inspector, frojects Section

(Date '

(paragraphs 1, 2, 4, 5, 6 & 7)

hW

//.1s/Bu

L. D. Gilbert, Reactor Inspector, Engineering Support

Date /

Section (paragraph 3) (January 15-18, 1980, only)

//28!8d

Approved:

w _- -_ _

W. A. Crossman, Chief, Projects Section

Date

//OkW

R. E. Hall, Chief , EngineeYing Support @ction

Date

-

o

.

8003200

.

I

Inspection Summary:

i

Inspection on December 18-20, 1979, and January 15-18, 1980 (Report No.

50-445/79-31; 50-446/79-29)

Areas Inspc-*ed:

Routine, unannounced inspection of construction activities

including site tour; observation of work and review of records for Unit I

safety-related welding of Reactor Coolant Pressure Boundary piping; observation

of work and review of records and procedures related to protection of installed

safety-related components; and the review of records relative to protection of

the Unit 1 reactor vessel internals.

The inspection involved sixty-six inspector-

hours by two NRC inspectors.

Results: Of the five areas inspected, no items of noncompliance were found in

4

four areas. One apparent item of noncompliance was found in one area (infraction -

failure to follow welding procedures

paragraph 3.a).

i

i

i

.

./

e

2

_ _

.

DETAILS

1.

Persons Contacted

Principal Licensee Personnel

  • J. George, TUSI, Project General Manager
  • R. Tolson, TUGCO, Site QA Supervisor
  • J. Merritt, TUSI, Engineer and Construction Manager
  • D. Deviney, TUGCO, Operations QA Supervisor

J. Hawkins, B&R/G&H, QC Supervisor

R. Fleck, TUSI/G&H, Operations

Other Personnel

D. Doyle, B&R, QC Inspector

D. Lindhurst, B&R, Pipe Foreman

J. Cockfield, B&R, Millwright QC Inspector

H. Johnston, B&R, QC Electrical Inspector

R. Cormears, B&R, QA Surveillance Supervisor

The IE inspectors also interviewed other '.icensee and contractor personnel

including members of engineering and QA/QC staffs.

  • Denotes those attending the exit interview.

2.

Site Tour

'

The IE inspectors toured the Units 1 and 2 Reactor Buildings and Auxiliary

Building to observe construction activities in progress and to inspect

housekeeping.

.

No items of noncompliance or deviations were identified.

3.

Reactor Coolant Pressure Boundary Piping

a.

Observation of Work

The IE inspector, in the process of observing the fit-up and alignment

i

of a socket weld, identified as FW-13 on Drawing BRP-SI-1-RB-025,

Revision 1, noted that the type 308 weld material being used for tack

I

welding was not of the type specified in the Welding Procedure Specifi-

cation (WPS) 88023, Revision 8, Interim Change Notice 1.

The WPS

specifies that type 316 weld material shall be used for welding type

316 base material to type 304 base material.

In the case of weld FW-13,

the valve is type 316 and the pipe is type 304.

3

-

-

.

. . . . .

.. -

. -

-

.

At the time of the inspection, no other Class 1 welds were being

<

fit-up or welded in the area for observation by the IE inspector.

Failure to follow the WPS with respect to type of weld mater al

appears-to bs in noncompliance with the requirements of 10 CFR

Part 50, Appendix B, Criterion V.

b.

Review of Records

'

The IE inspector selectively reviewed documentation of receiving

'

inspections, welding material test reports, welder qualifications,

nondestructive tests, and QC inspection personnel certifications

for compliance with the ASME B&PV Code requirements for the following

s

welds:

' Drawing

Welds

BRP-RC-1-520-1-2

W-1 and W-32

t

BRP-SI-1-RB-056

W-11 and W-12

BRP-SI-1-RB-06-7

W-61

BRP-SI-1-RB-10-0

W-1

BRF-RC-1-RB-26-1

W-1

,

No items of noncompliance or deviations were identified.

4.

Reactor' Vessel ~ Internals - Review of Quality Records

During this inspection, the IE inspector conducted a review of the B&R

record files relative to storage and maintenance of the reactor vessel

internals.

Documents included in the review were the B&R Procedure

,

I

- QI-MCP-10.1, Revision 0, " Mechanical Equipment Storage Maintenance,"

l

dated May 19, 1979; TUSI Procedure QI-QP-11.3.12; and Construction

Procedure MCP-10, "Scorage and Maintenance of Mechanical and Electrical

<

Equipment," Revision 4, dated June 14, 1979. QA/QC inspection records

t

reviewed included the period September 2, 1977, through December 4, 1979.

.

It was observed by the IE inspector that inspection and maintenance

1

requirements were conducted in accordance with the manufacturer'.-

reconsnendations and the licensee procedures.

'

No items of noncompliance or deviations were identified.

t

4

l

!

!

.

"-

r,,

9m-

%,

-

- - -

w

e

,.i.__.,,..-.-.

,w,.,.-

, - - -=, . , . .

-w--n>q

y_y,_,---,,.-mw.%.,

.,s

,.--,,-s-,.g.

.,-,w--

,

-.v--M_.,

.y-9.-e

_

_ _ _ _

. .

-

5.

Safety-Related Components - Observation of Work and Work Activities

During this inspection, the IE inspector conducted a walk-thru and

inspection of the Unit 1 Containment Building and Auxiliary Building

"

to observe installation and prctection of safety-related components.

In addition to a general observation, the IE inspector selected four

motor control valves installed in the primary coolant system for specific

observation and records review.

Valves slected were: 12" GM 88SEH 0007A;

10" GM78FHN 0008A; 10" GM88FHN 0002B; and 10" GM78FHN 0007.

Observations

were made of each of the installed valves with a comparative review of

the requirements prescribed by B&R Construction Procedure, " Storage and

Storage Maintenance of Mechanical and Electrical Equipment," MCP-10,

Revision 4, dated June 14, 1979, and TUSI Procedure QI-QP-ll.3.31, dated

January 5,1980.

It was observed by the IE inspector that both mechanical

and electrical protection is being maintained in accordance with the pres-

cribed procedures.

-

No items of noncompliance or deviations were identified.

6.

Safety-Related Components - Review of Quality Records

During this inspection, the IE inspector conducted a review of the licens-

4

j

ee s records of inspection activities relative to the protection of safety-

related components after installation.

Inspection records were reviewed in

conjunction with requirements prescribed by B&R Procedure, " Mechanical

Equipment Storage and Maintenance," QI-MCP-10.1, Revision 0, dated May 19,

i

1979, and TUSI Procedure QI-QP-ll.3.31, dated January 5,1980. Records

'

selected for review included inspection records of components observed by

the IE inspector as having been installed in the Unit 1 Containment Building,

i.e., motor control valves No. GM88SEH 0007A, GM78FHN 0008A, GM88FHN 0002B,

and GM78FHN 0007.

The records reflect inspection activities were conducted

in accordance with procedural requirements.

<

No items of noncompliance or deviations were identified.

7.

. Exit Interview

The IE inspectors met with licensee representatives (denoted in paragraph

1) and R. G. Taylor (NRC Resident Reactor Inspector) on January 18, 1980,

and summarized the purpose, scope and findings of the inspection.

The

]

licensee representative acknowledged the statement and the item of concern

included in the details of paragraph 3.a.

1

,

'e

!

s

5

t

.- - - .

,

-. .

-

, - - .

- - -

-

.

- l