Forwards IE Insp Rept 50-327/79-70 on 791128-1201 & 03-07 & Notice of Violation
ML19305B110
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 01/09/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19305B105 List:
References
NUDOCS 8003190182
Download: ML19305B110 (2)


See also: IR 05000327/1979070

Text

{{#Wiki_filter:f. - , %[% } , i s % UNITED STATES 9 8 h NUCLEAR REGULATORY COMMISSION $ eE REGION il , [[ 101 MARIETTA ST., N.W.. SUITE 3100 o, ATLANTA, GEORGIA 30303 In Reply Refer To: RII: GAB 50-327/79-70 Tennessee Valley Authority ATTN: H. G. Parris Manager of Power 500A Chestnut Street Tower II Chattanooga, TN 37401 Gentlemen: This refers to the inspection conducted by G. A. Belisle s.. this office on November 28 through December 1, 1979 and December 3-7, 1979 of activities authorized by NRC Construction Permit No. CPPR-72 for the Sequoyah Nuclear Plant facility, and to the discussion of our findings held with W. F. Popp at the conclusion of the inspection. Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspectors. During the inspection, it was found that certain activities under your license appear to be in noncomplia. ice with NRC requirements. This item and references to pertinent requirements are listed in the Notice of Violation enclosed here- with as Appendix A. This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations. Section 2.201 requires you to submit to this office, within 20 days of your receipt of this notice, a written statement or explanation in reply including: (1) corrective steps which have been taken by you and the results achieved; (2) corrective steps which will be taken to avoid further noncom- pliance; and (3) the date when full compliance will be achieved. In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days t.o this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate pait of the document. If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room. < 800s20 0 gg _

_ _ _ _ _ _ _ _ _ _ _ / . Tennessee Valley Authority -2- JAN O 91980 o Should you have any questions concerning this letter, we will be glad to discuss them with you. Sincerely, I (0ny fy R. C. Lewis, Acting Chief Reactor Operations and Nuclear Support Branch Enclosures: 1. Appendix A, Notice of Violation 2. Inspection Report No. 50-327/79-70 cc w/ enc 1: G. G. Stack, Project Manager P. O. Box 2000 Daisy, TN 37319 J. M. Ballentine Plant Superintendent P. O. Box 2000 Daisy, TN 37319 D. L. Lambert, Project Engineer 400 Chestnut Street Tower II Chattanooga, TN 37401 J. F. Cox 400 Commerce Street W10C131 C-K Knoxville, TN 37902 E. G. Beasley Tennessee Valley Authority 309 Grant's Building Knoxville, TN 37902 . }}