Responds to NRC Re Violation Noted in IE Insp Rept 50-327/79-70.Corrective Actions:Jumpers in Panel R17 & R14 Installed to Protect Temp Loop Equipment During Mod Work.Addl Training Given to Instrument Mechanics
ML19305B109
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 02/04/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19305B105 List:
References
NUDOCS 8003190179
Download: ML19305B109 (2)


Text

r:,

..:( J w

TENNESSEE VALLEY AUTHORITY Q

q-D CH ATTANOOGA. TENNESSEE 37401

[]

w n

400 Chestnut Street Tower II

-Q s

7 February 4, 1980

.I t.r

?

Mr. James P. O'Reilly, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region II - Suite 3100 101 Marietta Street Atlanta, Georgia 30303

Dear Mr. O'Reilly:

SEQUOYAH NUCLEAR PLANT UNIT 1 - NRC-01E REGION 11 LETTER RII: GAB 50-327/79 INSPECTION REPORT - RESPONSE TO INFRACTION The subject letter dated January 8,1980, cited TVA with one infraction in accordance with 10 CFR 2.201.

Enclosed is our response.

If you have any questions concerning this matter, please get in touch with D. L. Lambert at FTS 854-2581.

Very truly yours, TENNESSEE VALLEY AUTHORITY

. M. Mills, Manager Nuclear Regulation and Safety Enclosure cc:

Mr. Victor Stello, Jr., Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 800S190 l An Equal Opportunity Employer i Q

a s

.9 4

ENCLOSURE SEQUOYAh NUCLEAR PLANT UNIT 1 RESPONSE TO INFRACTION 327/79-70-01 Infraction A.

As required by 10 CFR 50, Appendix B, Criterion V, activities affecting.

quality shall be accomplished in accordance with documented instructions.

The licensee's accepted QA program, FSAR, Section 17.lA.5, states that activities affecting quality are prescribed by documented' instructions in the form of drawings, specifications, and procedures. Administrative Instruction A.I.9, Temporary Alterations, which provides instructions for implementing this requirement, states that alterations will be properly documented and approved.

Contrary to the above, on December 5, 1979, temporary alterations in the form of jumpers were found in panel R17, on terminal board 17B, and in panel R14, on terminal board 14B.

These jumpers met none of the approval and documentation requirements of Administrative Instruction Al-9.

Corrective Steps Which Have Been Taken and Results Achieved Jumpers in panels R17 and R14 were installed to protect temperature loop equipment during modification work. They were installed without following the administrative temporary alteration requirements of AI-9.

The jumpers have now been removed.

The installation of these unauthorized jumpers would not have been a problem since they have redundancy and would have been quickly noted during heatup by no change in temperature.

Corrective Steps Taken to Avoid Further Noncompliance All instrument mechanics are given initial QA training which includes instruction in temporary alterations.

As a result of this unauthorized jumper installation, additional training of instrument mechanics was given and completed on January 14, 1980.

This training included a description of the occurrence and a reiteration of temporary alteration o

requirements.

Date Full Compliance Achieved

. We are now in compliance with the requirements of AI-9.