Forwards Final SALP Report 50-219/89-99 for Feb 1989 - Mar 1990.Minor Change Made to Rept Based on Licensee 900803 Response
ML19302E276
Person / Time
Site: Oyster Creek
Issue date: 09/14/1990
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Fitzpatrick E
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML19302E277 List:
References
NUDOCS 9010010308
Download: ML19302E276 (4)


See also: IR 05000219/1989099

Text

...

,

.

..

,

,

..

SEP 14100]

Docket No. 50-219

GPU Nuclear Corporation

ATTN: Mr. Eugene Fitzpatrick

Vice President and Director

Oyster Creek Nuclear Generating Station

P.O. Box 388

Forked River, New Jersey 08731

Gentlemen:

Subject: Systematic Assessment of Licensee Performance (SALP) Final

Report No. 50-219/89-99 (February 1,1989 - March 15,1990)

The enclosed report transmits the final results of the Oyster Creek Plant SALP

Board Meeting conducted on April 23, 1990. We discussed the findings with you

in a public meeting on July 2,1990. The presentations given in that meeting

are included in Inspection Report 50-219/90-11 dated August 15, 1990. We made

a minor change to the report based on your response dated August 3, 1990.

No response to this letter is necessary.

The final SALP report will be placed

in the NRC Public Document Room.

We appreciate your cooperation.

Si cerely$tencd By:

Oranc1

,

Thomts T. Martin .

Thomas T. Martin

Regional Administrator

Enclosure:

Final SALP Report No. 60-219/89-99

,

na,,

v . d t. . ?

>

0FFICIAL RECORD COPY

OYC SALP - 0001.0.0

g

08/20/90

-

9010010308 900914

-

-

PDR

ADOCK 05000219

-

Q

PDC

.

.

. .

SEP 1( W

.

-

'~

GPU Nuclear Corporation

2

cc:

M. Laggart, BWR Licensing Manager

Licensing Manager, Oyster Creek

Chairman Carr

Commissioner Rogers

Commissioner Curtiss

Commissioner Remick

K. Abraham, RI (19 copies)

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Jersey

bec:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

T. Martin, RA

R. Bellamy, DRSS

W. Rult.nd, DRP

M. Conner, DRP

S. Young, SRI, TMI

K. Abraham, PA0

J. Caldwell, NRR

A. Dromerick, Project Manager, NRR

J. Lieberman, OE

D. Holody, ES

SALP Meeting Attendees

RI:DRP

RI:DRP

RI:DRP

RI:DRS

RI:DRA

RIA

Roland

Wenzinger

Hohl

Hodges

Kane

Martin

08/27/90

08/27/90

09/04/90

09/04/90

09/04/90

09//'//90

SEE PREVIOUS CCNCURRENCE PAGE

OFFICIAL RECORD COPY

OYC SALP - 0002.0.0

08/20/90

IE

40

  • *.

,

,

,

a

'*

GPU Nuclear Corporation

2

cc:

M. Laggart, BWR Licensing Manager

Licensing Manager, Oyster Creek

Chairman Carr

o

-Gemmiu4onen--Robertt

w

~-

Commissioner Rogers

c/I

Commissioner Curtiss

tr

P'fi

Commissioner Remick

C

i

K. Abraham, RI (19 copies)

de

Public Document Room (PDR)

er

Local Public Document Room (LPDR)

3

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Jersey

bec:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

T. Martin, RA

R. Bellamy, DRSS

W. Ruland, DRP

M. Conner, DRP

S. Young, SRI, TMI

K. Abraham, PA0

J. Caldwell, NRR

A. Dromerick, Project Manager, NRR

J. Lieberman, OE

D. Holody, ES

SALP Meeting Attendees

yb

7

RI:DRE

RI:DRP

RI:DRP

DRS

@)dA

RI:RA

Rg1

Wen rygey

Hodges

V

Martin

8F////90

UA)/9

Sp//[/90

0/g/90

0$/4/90

08/ /90

0FFICIAL RECORD TOPY

OYC SALP - 0002.0.0

03/24/90

.

,

.

,*

SALP BOARD ERRATTA SHEET

We have reviewed your response listing apparent factual errors and incon-

sistencies. We concluded that only one change in the report was necessary.

In the Maintenance / Surveillance section, based on your third noted

inconsistency, the following change was made:

Page

Lines

Comments

18

10-13

Based on the licensee's response, page 7, a sentence

was deleted.

This sentence referred to the emergency

service water system pump in-service testing.

The

licensee stated that in-service testing of the service

water pumps was performed monthly. The original

sentence stated that the inservice test was run only

quarterly even though numerous problems have been

observed with the pumps over the years. We deleted

the sentence since IST is performed monthly and the

uverall idea of the paragraph is supported by other

examples.

In each of the three other examples, the additional information you provided

did not affect the basic issue and did not warrant correcting.

In the Plant Operations section, we concluded that no revision was required.

First, no implication was intended regarding the lack of an automatic transfer.

The statement was intended to emphasize the operator's correct response to the

event. Second, we cannot speculate what would have happened had the AIT not

arrived.