ML19301A042
| ML19301A042 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 09/12/1980 |
| From: | Reid R Office of Nuclear Reactor Regulation |
| To: | Allan J, Swanson D, Vassallo D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), Office of Nuclear Reactor Regulation, NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD) |
| Shared Package | |
| ML19301A041 | List:
|
| References | |
| FOIA-86-234 NUDOCS 8009260036 | |
| Download: ML19301A042 (7) | |
Text
[
\\.[
UNITED STATES 2 M*
d
. y,4;,.- rg g NUCl AR REGULATORY coa.....
acy,t E
.r m,smsT e n, =, e,2::ses
,() *i...z.t.4f September 12, ic30 C
Docket No. 50-289 MEWS.ANDUM FOR:
Dan Swanson, Office of Executive Legal 'Di're'cMr- - ---
~
~
U. Allan, Deputy Director, Office of Inspection & Enforcement,
-?
Region I
~'
2 '.c.-
D. Vassallo, Chief, Licensee Qualifications Branch, Division
~
g :. _
of Human Factors Safety
==. -
P. Coliins, Chie~ Operator Licensing-Branch, 1=T_.-
Division of Human Factors Safety
_. [_-
T. Murphy, Chief, Radiological Assessment Branch, Division of Systems Integration FROM:
Robert i'. Reid, Chief, Operating Reactors Branch #4, Division i
of Licensing
SUBJECT:
TMI-1 RESTART PROCEED 1NG:
IWIAGEMENT ISSUE-RESPONSIBILITIES V -- -
A'<D SCHEDULES Ther'e' have been numerous memorandum, meetings and verbal corrnitments regarding the responsibility for response in the TMI management area.
This mercrandum is to confirm the agreements as to the responsibilities and the revised schedules, and to provide additional guidance for preparation of input for the Supplemental Safety Evaluation Report (SSER).
Tne respcnsibilities for management issues are listed in Enclosure 1.
The lead
' respendent is responsible for obtaining and coordinating all input in the defined area unless otherwise delegated.
The first draft of testimony should
~~~
be subnitted to OELD [ ATTN: Dan Swanson w/ce;to HSilver, NRR] by September lo, 1980.J~ Testimony should be submitted in Question and Answer (OA) format as
~
discussed previously with the exception of SHOLLY 14 which will be a brief QA response referencing the forthcoming SSER.
55ER input should be submitted to the ORPM Harley Silver by October 3,1980.
The format of the SSER will be similar to that of Section 6 of the THI-l Restart Evaluation issued in June (h'UREG-06BC). provides additional guidance for input to the SSER with Enclosure 3 prc'vided as a for at sample.
n'd 92 600 %
F goo
9 D5wanson, JAlien, DVassallo. PCollins, TMurph,y Please inform the ORFM Harley Silver (492-S427) or Sheryl Wookey (492-7435) if discrepancies are noted in the enclosures, or when circumstances arise which could potentially cause a major slippage in the schedule described above.
/~'))
j/
' E/f vke Robert W. Reid, Chief
~
Operating Reactors Branch f4 Divisien of, Licensing En:iosures:
1.
Responsibilities for Management Issues 2.
Section 6 Format - SSER 3.
Sample 55ER Format cc w/ enclosures:
DEisenhut, NRR RPurple, NRR JRee, NRR TNovak, NRR HSilver, NRR SWookey, NRR JTourtellotte, OELD LCrocker, NRR FA11enspach, NRR E3renner, Reg. I RXeimig, Reg. I CNeely, Reg. 1
- JNehemies, NRR
'CMaverkamp, TMI Site
~' -- -'
TFasano, TMI Site W5hafer, IE DZiemann, NRR JRiesland IE C3erlinger, NRR JPetersan NRR Hornstein EBlackwood PCollins 55nyder 5Hanauer
4 n
C O
6 O
e a se "et
- m u
Uu EUg C
.O bm G
3Q b
m h*= c 3
Q e c C L o
U M
C Q g3 L
m r$
=
m.C C.a -
C3 h
C b
U C
-Q
=
c U -
L.
=L 3;
"3 O
- CO m
c w
L N-C O
L y
c
. fa' 8t3 3
e u
3:
E - *J "c
sa vi
=.
O e
4== % =J L
CJ e
Q d""
=
C*i =
C 3
h b
E Q
m C.
a CL3 t.*
in M
W "3
b-C 3
==
C Q
m C
Cb
+4 I
Q
.c ro 2:
E
>=
"3 A
=
O
"""3 m
C e
DQ C w
s L"n wi C
=J C-Q E
C c
3 C:; 4 C
=
""5 e
ar-O c
o
.J C
>O
G Z
.c v
m E
- = C
- =8 Jef M
e o
E e=m a--
=
C 1U G
~
C.
h
'2" C'
U,,
<. m
=J Cf C
=
C P-Q
=
O c
w ca 4,J M
V m
U w
m
- J D
^
O Ch h
Q
.m '.
Q 6
m U
U O
C C.
Z CJ %
b--
o E
C b=
CJ m
=
m E
r; C
- O E-rg L
yt C
C A - O.C, e 60 O
e O
- a.8 C
e y
b L
e - c vy
,=
I 2
L.
O CC#
C Q
L
+J w 4J U
C va
'*=
>C v=
e a
U U
.LJ aC '
=J C
CCU cC c
N 6==
CJ - C L,
.~ C %eJ O
c C. C CJ C'
O O
e Lt e==. =
==
.= m a =.".".,
O w
r e :::: C rll: D J
c e C. e w "O
9 C.
OC-L ;lll:
m Z
== e: 68 L
C-C2
- c O
i e1 s =,
C.
u ua e
c.
C :. L m
2 c C. C:
6 w
- c-- C. C =
C e
w C. C.
C C
- C C
E=A
=
- ==
Z h 4 l==C Q
=
m Wt C
C3 >--
~
~<%
r=
w C
J A
C
- C
- =
C*
m
-.J
=
M131 o.. C.
..L..=..
cJ=N
.m C::
n
. o.. y L3
.J
=
g.C >;; LJ <
L.J LJ W W ~ hJ Z g
a 6
w
.-= = m C = ;.:
c eg C
=
b W
- ==
O m
O M
CQ O
M N
C
=
=3 C
M g
C L.)
C')
C, w
g a
C3 *
.3
.O C
c(.
.C.
O
- J y
g C
C..
C..
C:
M =J y
a c
2 c:::
Q U m
=
c"):"
6T Lt C
eQ c
C.*
C
- r3 m a.=
==
g E.,..b.c ~
=
~
m
= 3 C
b2 h
b C
CH C.
C C
U s
U e
e PC u=a nc L C
C W
c::
L L ::f C:: {
"J up C
C U
C y cW C==,
3 3
C C
Cn 10 L
k k
U O
m "C
Uc::
C lll V
Z c C c
CU u
e
. ~-
,J e 4 lll l=J LJ
'~)
C,b 6J.3 m
C 4 C
.,,J..U C
>,' l Ci C
O&
C
-. N va J
e
..E {.u.
c- -
c.
J Ln.
c, e
h J
_o i
2 m
C a
.= =
m C
=
C".
~
O p--
~J c
o' c
C
=
y
-l W.
d P-O v*
55 tit liiput Updat e June 1980 SER (Nintr.G-0600) Section 6 - SSElt input to ilRR Project Manager by October 3,1900 Doai3_ Deder Item p/f6/00),
lead Hesinindent ing,iut ri:om Coinnen ts 1
1 L. Crocker, liitit IE: PAD Refer to 5 holly 14(a) tiTOL Type inspection 2
L. Crocker, NRR IE:l'AB (Riinte, ance Refer to Sholly 14(h),(c)-Coordinate Arca) with the Response to Contention lillA-5 flIOL lype inspection 3
Itaverkar.v,Ill inspection Reports &
Sunmary as relates to the imnagement Iss PAD, itTOL, lip, QC
. includes Senior Resident's coments 4
J. Nehemias, flRR lip inspection Refc'r to Sholly 14(c) 5 D. tiecly, RI IIP Inspection G
L. Crocker, ilRR 7
L. Crockcr, NRR IE: PAD Refer to Sholly 14(d)
NT0L Type Inspection 8
J. Riesland, IE 4/6/80 Draft i
9 C. Berlinger, HRR 6/26/80 Draf t '
10 J. Allan, RI Dronner/Kelmig Awaiting Info. From Licensee Submittal Scheduled 9/17/00 11 L. Crocker
- NIOL Type Inspection RefartoSholly14(a)
I Addressed in Section 7 12 J. Petersen i
i i
e e
e
SSER - SECTION 5 FORMAT A.
Introductory P_aracrach (H. Silver)
- Review of Cerrnission Order
- State ent that SSER prcvides evaluatien based en assessment of conferrance to available new & upgraced criteria & standards
- Statenent that original Section 6 (!CREG-0680) is m:dified, clarified or expanded based upcn review of additional infor ation and site visits (as described below).
- Cross reference of revised Section 5 to 3/5/B0 Order Items
- 5.
Panacement and Technical Cacability (L. Crocker - J. Allan -
D. Haverhamp)
- Update to include: - NTOL like inspection findings. L. Crocker
- Revised Organication Structure,4.. Crocker
- 3/6/80 Order Items 1, 2 d.6, 11, L. Crocker
- 3/5/80 Order Items 3, Have rP. amp
- 3/6/80 Order Item 10, J. Allan C.
Safetv Revie and 02erational Advice (L. Crocker)
- Update to include: 3/5/80 Order Item 7 D.
,Tra_f ninc of Ooeretine Staff (P. Collins)
- Review (revise) to assure consistency with testimony E.
Co,e_ra tional OA
- Review (revise) to assure consistency with CA inspection team findings (G. Papu
- Update to include Q-List evaluation (J. Gilray)
F.
Facility Procedures (D. Ziemann)
- ypecte ta include additional audit findings G.
Health Physics (). Nehemias)
- Update to include:
HP Inspection Findings & 3/6/30 Order Item 4
,Radicactive Masce System (D. Neely)
E.
- Add new secticn (prior to plant raintenance Section CS-E') in rescense to 3/5/30 Order Item 5 Cercarison of Licensce's Perf orranc e With Industrv De'-.a
- Add Nevt Section: - Infraction Statistics '/6/80 Order Item 8 (J. Riesland)
- LER's 3/6/80 Order Item 9 (C. Berlinger)
G Cross Raference to the 3/5/50 Order Items will be included in the introduction.
.trefore, it vill not be necessary to specify in the narrative on each secticn
.-nat iters a.re being addressed.
. Er. closure. 2 3/5/B0 Order Item Acclicable Sub-Secciens of Secticn 5 1, 2, 3, 6,10, il Panag=. ment & Technical Capability' 4
Health Physics 5
Radicactive k'atte System 7
Safety Reviev & Operatienal Advise 8, 9 C:.mpariscn to industry 12 Refer to Section 7 of SER O
e e'
e 4*
k e.
e
Ey.;yJLE OF 55ER INPUT
,Er.tl osure 12,0 ftOU:7 er cate.ATicas 13.1 Creanizatienel St-c:ture of A:elicar.t since issuance ef the safety Evaluati:n Report, revised inferr,atien has been received free. the appilcant re;a-ding the st.atien staff ceganisatiet. For cce-plateness and atturary, the se:cnd paragra;h in.this section in the Saf ety Evah-tien Report s hould be replaceC d.th *.he p.aragra.ph below. Our conclusions regar:t-ing
- he crpanhational structure and qualifications of persennel rer. tin unchanged.
The station staff, unter the direction cf the Statien Se:erintencent/ Senior Unit Superintencent, is responsible f or the eperation of teth uni'.s which arie located a t the s ite.
The station staff censists of a.:;-exie4tely 146 full-tire ecployee,s f un:tioning it. four s.ain gree:s: an c;erating and technical group fc? tach unit (abeut 34 pee;1e in each groe:) -espensible f or plar. cperations and techni:41 supo:rt in the areas =f nuclea* engineerirq, instrueer.t and control ergineering, se:nanicti en;ir.eerin; and electrical enginetring; a rain.er. ante greep (about 60 cersons) rescensitic for eicetri:al, rechanical and instment s.tintenen:e at +.3e statien; and a radiatien prctection s cup (abcut 15 ;e rsens) resser.sible f er statior, radiation pr te: tion an: chemist y progrart.
12.f i neesir s a l Se: rity In the Saf ety Ivaluati:n Rep:,, we stated that the a:Plican'. hac sensittet a physical securhy plan applicatie tc Units 1 an: 2, entitlef, *Tnree Mile islang In:estrial Security Pregrac.," as revised inrougr. Kevisica 9 Cated July 1),1975, en: f cung i* ac:eptat13.
Tes applicant has since se ritte: a new chysical se:urity plan su;erseding ine at:ve an: eli setse:went revisiens fer Unit 2 only, entitlec, "Three Mile !sland Hw:le s-Statien, Unit 2 (IM1-2) InitME Physical Se:urity Pian," cated 7anwary 24, 157E, anc Sevision i to that plan fate: JJnua*y 27, 197E.
Ve con:1uce th.at this clan certains the neces sa y eierser.ts of se:urity, is cor_ptr-a.:le to and censistent with inree Mle Islenf Unit 1, and in:1ucts the f e.tteres anc pro:ecures currently rescre: ty 10 CFF. Part 72.*E5, and is tneref ore c::e.tadia. itis piar. is e~esigr. ate: an inteHe plan since i. will de further revisec ne la'er than Auges: 24, !!7E te cer.f e m with all the requirer >.nts ci
- o :FF. Part 73.51.
Ta ken frem NUTsEG-0107 Su:olerer.: 2 TFJ-2 SEF,
....+
e