| From: | Jay Collins Office of Nuclear Reactor Regulation |
| To: | Harold Denton, Grier B, Stello V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE), Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19301A041 | List:
|
| References | |
| CON-NRC-TMI-80-093, CON-NRC-TMI-80-93, FOIA-86-234 NUDOCS 8006090829 | |
| Download: ML19301A040 (3) | |
Text
4.....g g l(,
<=_?_
w 8 6 [6 [/J44 p ar e,,%
uem o strics c
Nuctun wt-cutA r CRY COMMts%3ON
.. $.,.. g,f,;
nsw:cion. o. c. m:s y..,..
[
May 20, 1980 i,,,.
NRC/TMI-80-033
~
Harold R. Denton, Ofrector, Office of Nuclear MEPC UNDUM TOR:
Reactor Regulation Victor Stello, Jr., Director, Office of
~~
Inspection and Enforcement
~
Boyce H. Grier, Director, Region I Office of Inspection and Enforcement FRCd:
Johi. T. Collins, Deputy Program Director, TMI Progro.c. N fice
SUBJECT:
1 E/NRR SUFFORT FOR TMI-l Rb7/." t'ANAGEMENT REVIEW
REFERENCE:
R. H. Vollmer memorandum for B. ii. Grier, and J. T. Collins, dated February 22, 1980; IE Support f or THI-l Restart Management Review.
The referenced memorandum (ccpy attached) solicited IE input for the forthcoming TM1-1 Restart SER, concerning the quality of the management cf TMI, Unit 1, and the licensee's ability to operate Unit 1 safely.
This input was to be responsive to items 3, 8 and 9 of Comission Order CLI-80-5, deted March 6.1980 (also attached).
This matter has since been the subject of n.umerous discussions between the TMI-l Senior Resident Reactor Inspector, the TMI-l Restart Program Project Manager.
- .yself and others, during which varicus options; for handling the TMI-l manages.ent issues were considered.
The purpose of this memorandum is to identify those necessary actions which I feel should be taken to fully aedress the THI-l management issues related to the above and other Ccmission Order items.
These actions include conducting special reviews, inspections and management appraisals by IE and/or NR,R staff in order to prepare SER input or hearing testimony as described below.
Recomended Reco cended Related Action ResDonsibility Order Ited 1.
!cnduct joint Region I/iiRR J. M. Allan, RI, 1, 2, 7 anagement review (similar L. P. Crocker, HRR 4
- o NTOL review performed for
.ialem 2).
Submit inspection raport to ASLB by o/1/80 hDdh09afa9 F
~.
Valtiple Addr.essee 2
May 20,1980 Recmrended Rece:nnended Related Action _
Resocnsibility Order I*.em(s)
(cent)
~
2.
Cenduct Region I HP eppraisai G. H. Smith, RI 4, 5 inspection.
Submit report to ASLS by 9/1/80.
3.
Conduct Performance Appraisal H. D. Thornburg, IE 1,2,7 Branch inspection.
Submit report to ASLB by 9/1/80.
4.
Conduct followup inspection of J. H. Allan, RI 10 TMI Unit 1 concerning corrective sqg
/
ections taken in response to IE Investigation Report Number 50-220/79-10.
Submit report to ASLB by 9/1/80.
_/
Frepare hearing testimony of Team Leaders for 3
3.
cesignated NRC inspectors Actions 1-4 above.
regarding the quality of the J. T. Collins, TMI manege!.,cnt of TMI Unit 1 and A. F. Faseno, TMI the corporate canagement....
D. R. Haverkamp, TMI Submit written testimony to M. M. Shanbaky, TMI ELD by 9/1/80.
L. W. Gage, RI G. Napuda, RI S.
Determine if conclusions can be S. E. Bryan, IE S
drawn, and conduct comparison of pas TMI Units 1 and 2 nonccmpliance history (from their 0/L date until i
12/31/78) with industry-wide statistics.
Submit SER input to H. Silver by 6/15/80.
7.
Determine if conclusiens can be C. H. Berlinger, RRR 9
. crawn, and conduct comparison of past TMI Units 1 and 2 LERs with industry-wide statistics.
i Submit SER input to H. Silver by 6/15/80.
Multiple Addressee 3
May 20,1980 '-
The TMI-l restart hearing is currently estimated to begin about mid-September, based on SER completion in mid-June.
Pleese advise me of your approval of these er alternative actions, including your designated repensible individuals.
Final approved plans should also be transmitted to H. Silver, Tril-1 Restart Program Project P.anager.
hM'k ui
/ John T Collins Deputy Program Director iMI Progrem Office e
Enclosures:
As stated cc:
B. Snyder g ' ker _
L.
Croc G. Saith H. Thornburg A. Fasanc D. Haverkamp M. Shanbaky I..
Gage G. Napuda
- 5. Bryan C. Berlinger H. Silver J. Tourte11otte i
O O