te,ee LICENSEE EVENT REPORT COf* TROL BLOCK. !
l l
l l
l l
(PLEAsE PRINT oR TYPE ALL REoVIRED INFoRMATtoN) 6 0II N! J 0 ! ClD fI l0 l0 l ln ln ln ln ln f. lq lq l Ll} l] l1l} l l
l l
7
+ 6 LICENSEE CCOE 14 15 uCENSE Nur'6EE a5 26 uCENSE TYPE M bi 4 7 Sd CcN T (CI' s[aN d l0IG l0 IO l0 I2 Il IC hl0l1 l2lclQln hl012I215 !8 IO l@
b SO 61 COCK ET NLvBER 6d 69 EVENT DATE 74 75 AEPORT C ATE 80 EVENT OESCRIPTION Ar.O PROB ACLE CONSECUENCES h 012 l
On Januarv 25. on Januarv 20 and acain en February 11 1080. radim ct-I lo#3i l ive water was discovered leakina from severelv citted aluminum pipina of I
o la i I the condensate t rans fer system.
The oicine was beina uncovered for in-l 1015] I spection. Water and soil samples were collected and analyzed.
All pot-
'l io'6 I
entiallv contaminated soil was collected and placed in 55 qallon drums i
l c 171 l lined with plastic bacs.
Th e event is considered an unmonitored release l
of radicactive water and reportable under T.S. 6.9.2.b.4.
i
, c., a, :
9,
E0
!"I * '
- AUSE
CAUSE
COYP VALVE 000E CCCE SLe:COE CO***0NENT CCOE Se8000E SveCODE
!Oic!
I W I F l@ l El@ l D l@ lP ll lP lE IX IX l@ l G l@ l Z l @
6 h
w 11 1;
1:
15 19 20 SEOuf NTI AL CCC.A A ENCE REvCRT
- s :-
EVE N' Y E 4 "
A EPORT NO, CODE TYPE NO.
@Rd I 81 01 l-l 101014l l/l 10131 L'_l I-l 101
- 2 23 24 26 27 28 29 30 31 32 ACT
- CN 5JTUAE E55ECT SHUTOCWN AMACHMENT N#PD4 PRIME COMP.
COMPON EN T SL6 MITT E D FORV u'6.
SUPPLI E A M AN U F ACTU A E R TAWEN ACT:C '.
ON#LANT VETMCO MOUAS 4.
Bl@l Cj@
l Z l@
l Z l@
l 010 l 0 l l
l Yl@
l N l@
l Zl@
l 2 l 9 l 8 l 9 l@
u
.s u
26 3
40 4'
42 43 u
e CAUSE CESC Ai8TICN AND CORRECTIVE ACTIONS o i The cause of this occurrence is attributed to excessive oitting caused I
i li i
bv calvanic corrosion.
The leaks were temocrarilv recaired.
Test bor-l i
,7 l
ings to a depth of 30 feet were obtained to evaluate the extent of soil 3,3 l
contamination.
All aluminum pipino will be reolaced this outaae. A l
I sacrificial anode with remote means of readino cround amos will be added.
J i
80 7
8 9 F ACILt*Y METH 00 07 STATUS
%#0wEA OTHEPSTATUS DISCOVERY DISCOVtRY DESCRIPTION 1 ls lH l@ l0 l0 l0 l@
NA
~
l l C l@l Special maintenance inspection 7
a 9 to 12 11 44 45 46 80 ACTIVITY CONTENT mELEASED OF RELE ASE AMOUNT OF ACTIVITY LOC ATION OF PELE ASE l L l @ lM l@lTo be determined l
l Adiacent to condensate transfer lines l
1 6
7 8 9 to 11 44 45 80 PERSONNEL EXPOSURES NuveEA TYPE C ESCRIPTION '
1 l7 0 l0 l0 l@l0l@l NA l
7 8 9 11
'2 13 80 PE AOCV.E L INJU A:ES N av E E 5' OESCRIPTiON NA l
l0l0l0l@l 1
u 7
8 9 11 12 80 LOSS C5 On O AMAGE TO 5 ACILITY Q Tvet
- E SC ni'T iO *.
v l Z l@l NA 1
9 7
8 9 10 EO PJR.eCFY N R C USE ON LY OE SC A'"lO*. C t'5UE:hl lYl Media Accou m ( 2 /14 17 / Ani l
llIIIIIIIIII l$
., I r, 66 69 FL.C e 9 t ';
Donald A.
Ross UCC 8 9
(
,,,.E G E P R E D A R E R PHONE.
8 0(lls ( 4
T ( I ' P P ~
- f Jersey Central Power & Light Company 9
4" h Madison Avenue at Punch Bowl Road Momstown, New Jersey 07960 (201) 455-8200 OYSTER CREEK NUCLEAR GENERATING STATION Forked River, New Jersey 08731 Licensee Event Report Recortable Occurrence No. 50-219/80-4/3L s
Report Date Fe b rua ry 25, 1980 Occurrence Date January 25, 1980 identification of Occurrence Unmonitored release of radioactive water from leaking underground aluminum con-densate piping.
This event is considered to be a reportable occurrence as defined in the Technical Specifications, paragraph 6.9.2.b.(4).
Conditions Prior to Occurrence The plant was shutdown for a refueling / maintenance outage.
The reactor was subcritical.
The resctor mode switch was locked in refuel.
The reactor cavity was flooded and less than 212*F.
Descriotion of Occurrence On Friday, January 25, 1980, late in the workir g day, contractors, assigned to uncover the underground aluminum pipes from the condensate storage tank for an inspection, discovered water in the area of excavation. To determine the source of water, further excavation was required.
Upon investigation, it was discovered that there were several pinhole leaks caused by severe pitting.
The leaks were identified and temporarily repaired on Sunday, January 27, 1980.
On Saturday, water and soil samples had been collected. An isotopic analysis was run on each sample and the maximum concentration of any isotope detected in any sample was 3.97E-03 uCi/cc of Coso, On Tuesday, January 29, 1980, an additional leak was discovered on the same line which was repaired in a few hours.
Jersey Centra Power & Ugn: Comeany is a Memter of the General Pubhc Utsties System
Reportab1: Cccurrence No. 50-219/80-4/3L Page 2 February 25, 1980 Potentially contaminated dirt, mud, etc. was removed from the trench and from around the pipes and placed in 55 gallon drums lined w!th plastic bags.
Each drum was sampled and an isotopic analysis was performed to verify all contami-nated soil was removed from the area.
On Monday, February 4, 1980, additional soil samples were collected and results indicated no activity above background.
On Wednesday, February 13, similar leaks were found in the 10" underground alumi-num pipe.
All contaminated soil was collected and stored with previous collected soil.
Apoarent Cause of Occurrence The holes in the pipe were caused by excessive pitting due to galvanic corrosion.
Inadequate corrosion protection was provided during installation / construction.
Analysis of Occurrence Leakage of radioactive condensate from the underground aluminum piping into the soil occurred for an undertermined time period.
Two (2) test borings to a depth of 30 feet were obtained to evaluate the extent of contaminated soil. The results of laboratory analyses on these samples are not yet available.
Following replace-ment of the degraded piping, further excavation will be done to determine the extent of soil contamination.
Based on previous experience with underground piping leaks in this sandy soil, it is expected that the activity will be con-centrated within a few feet of the pipe.
Corrective Action
The analysis of a previous Reportable Occurrence 78-25 (10/31/78), concerning leaks in the bottom of the condensate storage tank, indicated that there is inadequate corrosion protection in the area.
The current inspection of the under-ground aluminum pipes performed by Petro-Chemical Associates, Inc., reported severe pitting in all aluminum piping, especially near elbows.
All piping will be replaced this refueling outage.
An evaluation is in progress to reroute the new piping.
The piping will be double wrapped with an insulating tape.
A sacrificial anode with a remote means of veri,fying ground current will be used as a secondary protection system.
Failure Data The leaking pipes were 6" CH-4 condensate transfer pump suction line and the 10" CH-4 fire protection line.
The other underground pipes scheduled to be replaced are:
12" CH-3 to core spray and CRD pumps.
4" WD-2 to demineralized water storage tank.
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000219/LER-1980-001-01, /01T-o:on 800105,while Performing Electromatic Relief Valve Operability Test,Emergency Releie Valve D Failed to Open.Caused by Component Failure Due to Retainer Ring Being Backed Off Approx Six Threads | /01T-o:on 800105,while Performing Electromatic Relief Valve Operability Test,Emergency Releie Valve D Failed to Open.Caused by Component Failure Due to Retainer Ring Being Backed Off Approx Six Threads | | | 05000219/LER-1980-001, Forwards LER 80-001/01T-0 | Forwards LER 80-001/01T-0 | | | 05000219/LER-1980-002-03, /03L-0:on 800116,during Fuel Bundle Clip Insp,Fuel Bundle UD-3-023 Was Misoriented & Was Not Properly Seated in Core Cell Location.Caused by Personnel Error & Inadequate Procedural Controls.Procedure 205 Revised | /03L-0:on 800116,during Fuel Bundle Clip Insp,Fuel Bundle UD-3-023 Was Misoriented & Was Not Properly Seated in Core Cell Location.Caused by Personnel Error & Inadequate Procedural Controls.Procedure 205 Revised | | | 05000219/LER-1980-002, Forwards LER 80-002/03L-0 | Forwards LER 80-002/03L-0 | | | 05000219/LER-1980-003-01, /01T-0:on 800116,during Inservice Insp on Core Spray Sparger Piping for Sys Ii,Two Indications of Cracks Discovered.Ultrasonic Test Revealed through-wall Cracks. Possibly Caused by Sparger Installation Method | /01T-0:on 800116,during Inservice Insp on Core Spray Sparger Piping for Sys Ii,Two Indications of Cracks Discovered.Ultrasonic Test Revealed through-wall Cracks. Possibly Caused by Sparger Installation Method | | | 05000219/LER-1980-003, Forwards LER 80-003/01T-0 | Forwards LER 80-003/01T-0 | | | 05000219/LER-1980-004, Forwards LER 80-004/03L-0 | Forwards LER 80-004/03L-0 | | | 05000219/LER-1980-004-03, /03L-0:on 800125,on 800125,29 & 0213,radioactive Water Discovered Leaking from Severely Pitted Aluminum Piping of Condensate Transfer Sys.Caused by Galvanic Corrosion.Leaks Temporarily Repaired & Piping to Be Replaced | /03L-0:on 800125,on 800125,29 & 0213,radioactive Water Discovered Leaking from Severely Pitted Aluminum Piping of Condensate Transfer Sys.Caused by Galvanic Corrosion.Leaks Temporarily Repaired & Piping to Be Replaced | | | 05000219/LER-1980-005, Forwards LER 80-005/03L-0 | Forwards LER 80-005/03L-0 | | | 05000219/LER-1980-005-03, /03L-0:on 800205,during Weekly Surveillance of Standby Gas Treatment Sys,Setpoints for Radiation Monitors RNO4A-1 & RNO4A-2 Found to Read Less Conservatively than Tech Spec.Caused by Personnel Error & Instrument Drift | /03L-0:on 800205,during Weekly Surveillance of Standby Gas Treatment Sys,Setpoints for Radiation Monitors RNO4A-1 & RNO4A-2 Found to Read Less Conservatively than Tech Spec.Caused by Personnel Error & Instrument Drift | | | 05000219/LER-1980-006-03, /03L-0:on 800131,during Reactor Recirculation Flow Calibr surveillance,as-found Values of Recirculation Flow Sensors at Zero Percent Simulated Flow Were Out of Tolerance.Caused by Instrument Drift | /03L-0:on 800131,during Reactor Recirculation Flow Calibr surveillance,as-found Values of Recirculation Flow Sensors at Zero Percent Simulated Flow Were Out of Tolerance.Caused by Instrument Drift | | | 05000219/LER-1980-006, Forwards LER 80-006/03L-0 | Forwards LER 80-006/03L-0 | | | 05000219/LER-1980-007-03, /03L-0:on 800213,while Performing 10-h Test on Standby Gas Treatment Sys 1,flow Was Less than Tech Spec Limit.Caused by Slipping Drive Belts on Exhaust Fan EF1-8. Drive Belts Replaced | /03L-0:on 800213,while Performing 10-h Test on Standby Gas Treatment Sys 1,flow Was Less than Tech Spec Limit.Caused by Slipping Drive Belts on Exhaust Fan EF1-8. Drive Belts Replaced | | | 05000219/LER-1980-007, Forwards LER 80-007/03L-0 | Forwards LER 80-007/03L-0 | | | 05000219/LER-1980-008-01, /01T-0:on 800215,during Insp for IE Bulletin 79-14,discovered Nine Pipe Clamps Installed W/O Restraining Welded Lugs.Caused by Oversight During Const.Welded Lugs to Be Installed | /01T-0:on 800215,during Insp for IE Bulletin 79-14,discovered Nine Pipe Clamps Installed W/O Restraining Welded Lugs.Caused by Oversight During Const.Welded Lugs to Be Installed | | | 05000219/LER-1980-008, Forwards LER 80-008/01T-0 | Forwards LER 80-008/01T-0 | | | 05000219/LER-1980-009-03, During Annual Insp of Containment Spray Heat Exchanges,Leaks Discovered in Four Heat Exchangers.Caused by Component Failure & Design.Heat Exchangers to Be Retubed W/Titanium | During Annual Insp of Containment Spray Heat Exchanges,Leaks Discovered in Four Heat Exchangers.Caused by Component Failure & Design.Heat Exchangers to Be Retubed W/Titanium | | | 05000219/LER-1980-009, Forwards Revised LER 80-009/03L-1 | Forwards Revised LER 80-009/03L-1 | | | 05000219/LER-1980-010, Forwards LER 80-010/01T-0 | Forwards LER 80-010/01T-0 | | | 05000219/LER-1980-010-01, /01T-0:on 800220,during IE Bulletin 79-14 Insp, Pipe hangers,NP-2-R8A & NP-2-R8B Found Improperly Installed. Cleanup Sys Restraint Mod & Nonrigid Restraint Added | /01T-0:on 800220,during IE Bulletin 79-14 Insp, Pipe hangers,NP-2-R8A & NP-2-R8B Found Improperly Installed. Cleanup Sys Restraint Mod & Nonrigid Restraint Added | | | 05000219/LER-1980-010-03, /03L-1:on 790417,excavation Was Started to Repair Leak Near Inside Penetration within Pipe Tunnel.Activity Was Detected in Soil Near Dedt Line.Dedt Line Rerouted on 800316.Line Will Be Repaired | /03L-1:on 790417,excavation Was Started to Repair Leak Near Inside Penetration within Pipe Tunnel.Activity Was Detected in Soil Near Dedt Line.Dedt Line Rerouted on 800316.Line Will Be Repaired | | | 05000219/LER-1980-011-03, /03L-0:on 800219,during Surveillance Test,Trip Occurred on Standby Gas Treatment Sys 1.Caused by Cracked Flow Sensing Line Which Was Probably Stepped On.Line Replaced | /03L-0:on 800219,during Surveillance Test,Trip Occurred on Standby Gas Treatment Sys 1.Caused by Cracked Flow Sensing Line Which Was Probably Stepped On.Line Replaced | | | 05000219/LER-1980-011, Forwards LER 80-011/03L-0 | Forwards LER 80-011/03L-0 | | | 05000219/LER-1980-012, Forwards LER 80-012/03L-0 | Forwards LER 80-012/03L-0 | | | 05000219/LER-1980-012-03, /03L-0:on 800228,discovered That Weekly Surveillance Tests for Main Station & Diesel Generator Batteries Not Performed During Seventh Wk.Caused by Error in Personnel.Evaluation Will Be Made to Determine Improvements | /03L-0:on 800228,discovered That Weekly Surveillance Tests for Main Station & Diesel Generator Batteries Not Performed During Seventh Wk.Caused by Error in Personnel.Evaluation Will Be Made to Determine Improvements | | | 05000219/LER-1980-013, Forwards LER 80-013/01T-0 | Forwards LER 80-013/01T-0 | | | 05000219/LER-1980-013-01, /01T-0:on 800309,fire Suppression Water Sys Removed from Svc to Replace Cracked Valve,Contrary to Tech Specs.Fire Truck Pumper Used as Water Supply Backup. Cause of Valve Body Crack Under Investigation | /01T-0:on 800309,fire Suppression Water Sys Removed from Svc to Replace Cracked Valve,Contrary to Tech Specs.Fire Truck Pumper Used as Water Supply Backup. Cause of Valve Body Crack Under Investigation | | | 05000219/LER-1980-014-01, /01T-0:on 800302,emergency Diesel Generator 1 Failed to Synchronize & Tripped When Generator 2 Was Tagged for Mod.Caused by Component Failure.Fuse F7,found Loose in Holder.Fuseholder Repaired | /01T-0:on 800302,emergency Diesel Generator 1 Failed to Synchronize & Tripped When Generator 2 Was Tagged for Mod.Caused by Component Failure.Fuse F7,found Loose in Holder.Fuseholder Repaired | | | 05000219/LER-1980-014, Forwards LER 80-014/01T-0 | Forwards LER 80-014/01T-0 | | | 05000219/LER-1980-015, Forwards LER 80-015/03L-0 | Forwards LER 80-015/03L-0 | | | 05000219/LER-1980-015-03, /03L-0:on 800403,piston Rod on Closure Mechanism for Reactor Bldg Ventilation Automatic Isolation Valve Was Found Broken,Making Valve Inoperable.Caused by Component Failure.New Piston Rod Eye Stud Was Fabricated & Installed | /03L-0:on 800403,piston Rod on Closure Mechanism for Reactor Bldg Ventilation Automatic Isolation Valve Was Found Broken,Making Valve Inoperable.Caused by Component Failure.New Piston Rod Eye Stud Was Fabricated & Installed | | | 05000219/LER-1980-016, Forwards LER 80-016/01T-0 | Forwards LER 80-016/01T-0 | | | 05000219/LER-1980-016-01, /01T-0:on 800512,util Recognized That 800420 Discovery of Defective Pressure Switch,Psl D,Constituted Immediate Rept.Caused by Cocked Teflon Actuator.Switch Removed & Will Be Replaced | /01T-0:on 800512,util Recognized That 800420 Discovery of Defective Pressure Switch,Psl D,Constituted Immediate Rept.Caused by Cocked Teflon Actuator.Switch Removed & Will Be Replaced | | | 05000219/LER-1980-017-01, /01T-0:on 800516,while Performing Control Rod Interference checks,green-green Rod Position Indication Remained Illuminated While Withdrawing Rod 10-23.Caused by Operator & Procedure in Bypass & Component Failure | /01T-0:on 800516,while Performing Control Rod Interference checks,green-green Rod Position Indication Remained Illuminated While Withdrawing Rod 10-23.Caused by Operator & Procedure in Bypass & Component Failure | | | 05000219/LER-1980-017, /03L-0:on 800520,during Investigation of LER 80-17/1T, One Rod Free Travel Interlock Surveillance Requirements Not Performed as Required.Causec by Failure to Perform Procedure & Schedule Surveillance | /03L-0:on 800520,during Investigation of LER 80-17/1T, One Rod Free Travel Interlock Surveillance Requirements Not Performed as Required.Causec by Failure to Perform Procedure & Schedule Surveillance | | | 05000219/LER-1980-018-03, /03L-0:on 800507,during Monthly Surveillance Testing of Reactor High Pressure Scram sensors,RE03D Found to Be Less Conservative than Specified.Caused by Sensor Repeatability.Sensor Reset | /03L-0:on 800507,during Monthly Surveillance Testing of Reactor High Pressure Scram sensors,RE03D Found to Be Less Conservative than Specified.Caused by Sensor Repeatability.Sensor Reset | | | 05000219/LER-1980-018, Forwards LER 80-018/03L-0 | Forwards LER 80-018/03L-0 | | | 05000219/LER-1980-020, Forwards LER 80-020/01T-0 | Forwards LER 80-020/01T-0 | | | 05000219/LER-1980-020-01, /01T-0:on 800605,following Insp of Fire Barriers Protecting safety-related Areas,Several Penetrations Found in Degraded Condition.Caused by Deficiencies in Installation Specs & Personnel Error Re Delay in Establishing Watche | /01T-0:on 800605,following Insp of Fire Barriers Protecting safety-related Areas,Several Penetrations Found in Degraded Condition.Caused by Deficiencies in Installation Specs & Personnel Error Re Delay in Establishing Watches | | | 05000219/LER-1980-021, Has Been Cancelled | Has Been Cancelled | | | 05000219/LER-1980-022-03, /03L-0:on 800603,reactor High Pressure Isolation Condenser Initiation Switch Trip Points Found Less Conservative than Specified.Caused by Unusual Svc Condition. Pressure Switches Reset & Exercised to Ensure Operation | /03L-0:on 800603,reactor High Pressure Isolation Condenser Initiation Switch Trip Points Found Less Conservative than Specified.Caused by Unusual Svc Condition. Pressure Switches Reset & Exercised to Ensure Operation | | | 05000219/LER-1980-022, Forwards LER 80-022/03L-0 | Forwards LER 80-022/03L-0 | | | 05000219/LER-1980-023, Forwards LER 80-023/03L-0 | Forwards LER 80-023/03L-0 | | | 05000219/LER-1980-023-03, /03L-0:on 800523,prior to Inservice Insp Reactor Vessel Hydro,Testing Revealed That Electromatic Relief Valve High Pressure Sensor IA83B Exceeded Tech Spec Setpoint. on 800531,sensor IA83F Found to Exceed Setpoint | /03L-0:on 800523,prior to Inservice Insp Reactor Vessel Hydro,Testing Revealed That Electromatic Relief Valve High Pressure Sensor IA83B Exceeded Tech Spec Setpoint. on 800531,sensor IA83F Found to Exceed Setpoint | | | 05000219/LER-1980-024, Forwards LER 80-024/03L-0 | Forwards LER 80-024/03L-0 | | | 05000219/LER-1980-025, Forwards LER 80-025/01T-0 | Forwards LER 80-025/01T-0 | | | 05000219/LER-1980-025-01, /01T-0:on 800618,during Surveillance Test, Nonfunctioning Operator Discovered in Valves V-9-12 & V-9-8 Found Leaking.Caused by Component Failure.Defective Valves Replaced & Will Be Inspected.Revised Rept Will Follow | /01T-0:on 800618,during Surveillance Test, Nonfunctioning Operator Discovered in Valves V-9-12 & V-9-8 Found Leaking.Caused by Component Failure.Defective Valves Replaced & Will Be Inspected.Revised Rept Will Follow | | | 05000219/LER-1980-026, Forwards LER 80-026/03L-0 | Forwards LER 80-026/03L-0 | | | 05000219/LER-1980-026-03, /03L-0:on 800709,during Routine Testing Insp of Hydraulic Snubbers Installed in safety-related Sys,Snubber 75/5 Failed to Lock Up in Compression Direction.Caused by Foreign Matl in Snubber Fluid.Snubber Flushed & Refilled | /03L-0:on 800709,during Routine Testing Insp of Hydraulic Snubbers Installed in safety-related Sys,Snubber 75/5 Failed to Lock Up in Compression Direction.Caused by Foreign Matl in Snubber Fluid.Snubber Flushed & Refilled | | | 05000219/LER-1980-027, Forwards LER 80-027/01T-0 | Forwards LER 80-027/01T-0 | |
|