ML19296B160

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-361/79-31 on 791029-30 & 1127.No Noncompliance Noted
ML19296B160
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 01/07/1980
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML19296B161 List:
References
NUDOCS 8002200187
Download: ML19296B160 (2)


See also: IR 05000361/1979031

Text

'o

UNITED STATES

E [ '", ( 'j

NUCLEAR REGULATORY COMMISSION

.

5 ,y

3

REGION V

0

o, -

1990 N. CALIFORNIA BOULEVARD

,e

SulTE 202, WALNUT CREE K PLAZA

<r

  • ,,,*

WALNUT CREE K. CAllFORNIA 94596

January 7,1980

Docket No. 50-361

Southern California Edison Company

P. O. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

Attention:

Dr. L. T. Papay, Vice President

Advanced Engineering

Gentlemen:

Subject: ilRC Inspection of San Onofre Unit No. 2

This refers to the inspection conducted by Messrs. A. Johnson and

L. Miller of this office on October 29-30 and November 27,1979 of

activities authorized by NRC Construction Permit No. CPPR-97, and to the

discussion of uur findings held by Mr. Johnson with Mr. H. Ray and other

members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, inter-

views with personnel, and observations by the inspectors.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you believe

to be proprietary, it is necessary that you submit a written application

to this office, within 20 days of the date of this letter, requesting

that such information be withheld from public disclosure.

The applica-

tion must include a full statement of the reasons why it is claimed that

the information is proprietary.

The application should be prepared so

that any proprietary information identified is contained in an enclosure

/

8 OGidt 00

'

Southern California Edison Company

-2-

January 8, 1980

to the application, since the application without the enclosure will

also be placed in the Public Document Room.

If we do not hear from you

in this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

-

..

_ , T,l:-'1l.,aLl.L -

.

!:.

p. J. L. Crews, Chief

',

Reactor Operations'and

Nuclear Support Branch

Enclosure:

IE Inspection Report

No . 50- 361/ 79-31

cc w/o enclosure:

Mr. R. Dretch, Vice President

Nuclear Engineering and Operations, SCE