Forwards IE Insp Repts 50-416/79-34 & 50-417/79-30 on 791211-14 & Notice of Violation
ML19294C110
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 01/10/1980
From: Bryant J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML19294C106 List:
References
NUDOCS 8003060728
Download: ML19294C110 (2)


See also: IR 05000416/1979034

Text

.

,

q

'

/

UNITED STATES

{g38" M

'

'n

NUCLEAR REGULATORY COMMISSION

E

REGION 11

9

og1

[

101 MARIETTA ST.. N.W.. SUITE 3100

ATLANTA, CEORGIA 3o303

g ***** g

JAN 101980

In Reply Refer To:

RII:PKV

50-416/79-34

50-417/79-30

Hississippi Power and Light Company

ATTN:

N. L. Stampley

Vice President of Production

P. O. Box 1640

Jackson, MS 39205

Gentlemen:

This refers to the inspection conducted by P. K. VanDoorn of this office on

December 11-14, 1979 of activities authorized by NRC Construction Permit Nos.

CPPR-118 and CPPR-119 for the Grand Gulf facility, and to the discussion of our

findings held with C. K. McCoy at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Two new unresolved items resulted from this inspection and are discussed in the

enclosed report. These items will be examined during subsequent inspections.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements.

This item and references

to pertinent requirements are listed in the Notice of Violation enclosed here-

with as Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations.

Section 2.201 requires you to submit to this office,

within 20 days of your receipt of this notice, a written statement or expla-

nation in reply including:

(1) corrective steps which have been taken by you

and the results achieved; (2) corrective steps which will be taken to avoid

further noncompliance; and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

recort contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application nust include a full statement of the reasor

7 the basis of which

it is claimed that the information is proprietary, and snould be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

8003060 D 7

.

.

'

Mississippi Power and Light Company

-2-

JAN 101980

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

b

's

Jack C. Br ant, Acting Chief

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-416/79-34 and

50-417/79-30

cc w/ enc 1:

C. K. McCoy, Plant Manager

P. O. Box 756

Port Gibson, MS 39150

.