ML19294B899
| ML19294B899 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 12/04/1979 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Lundvall A BALTIMORE GAS & ELECTRIC CO. |
| Shared Package | |
| ML19294B889 | List: |
| References | |
| NUDOCS 8003060308 | |
| Download: ML19294B899 (2) | |
See also: IR 05000317/1979017
Text
'
.
.
, , , ,
UNITED STATES
'o
NUCLEAR REGULATORY COMMisslON
R EGION I
y
,
g
$ ,.
. g
$31 PARK AVENUE
w
.>N
KING OF PRUS$1 A. PEN N5YLVANIA 19406
DEC 0 4 1979
.....
Docket Nos. 50-317
50-318
Baltimore Gas and Electric Company
ATTN: Mr. A. E. Lundvall, Jr.
Vice President - Supply
P. O. Box 1475
Baltimore, Maryland 21203
Gentlemen:
Subject: Combined Inspections 50-317/79-17 and 50-318/79-14
This refers to the inspection conducted by Mr. C. Cowgill of this office on
October 2-5, 1979; at your Calvert Cliffs Nuclear Power Plant, Units 1 and 2 in
Lusby, Maryland, of activities authorized by NRC License Nos. DPR-53 and DPR-69
and to the discussions of our findings held by Mr. Cowgill with Mr. Russell of
your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Irspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Our inspector also verified the steps you have taken to correct the items of
noncompliance brought to your attention in letters dated August 17, 1979 and
September 6,1979. We have no further questions regarding your action at this
time.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Apper. dix A.
This item of noncom-
pliance has been categorized into the levels cs described in our correspondence
to you dated December 31, 1974. This notice is sent to you pursuant to the
provisions of Section 2.201 of the NRC's " Rules of Practice", Part 2, Title 10,
Code of Federal Regulations.
Section 2.201 requires you to submit to this
office, within twenty (20) days of your receipt of this notice, a written
statement or explanation in reply including:
(1)correctivestepswhichhave
been taken by you and the results achieved; (2) corrective steps which will be
taken to avoid further items of noncompliance; and (3) the date when full com-
pliance will be achieved.
go on"@ 36
.
.
Baltimore Gas and Electric Company
DEC 0 4 1979
2
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room.
If this report contains any
information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must be
accompanied by an affidavit executed by the owner of the information, which
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b)(4) of Section 2.790.
The information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
Should you have any questions concerning this inspection, we will be pleased to
.
discuss them with you.
Sincerely,
f
- .n
<
El on J. Brunner, Chief
Re ctor Operations and Nuclear
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcet.ent Inspection Report Numbers
50-317/79-17 and 50-318/79-14
cc w/encls:
R. M. Douglass, Manager, Quality Assurance
L. B. Russell, Chief Engineer
W. Gibson, General Supervisor, Operations QA
R. C. L. Olson, Senior Engineer
K. H. Sebra, Principal Engineer