4
p afoug
-
UNITED STATES
o
NUCLEAR REGULATORY COMMISSloN
REGION I
~
g
g. ,
.-
.g
631 PARK AVENUE
,
KING OF PRUSSI A, PENNSYLV ANI A 19406
%,
- E
- .*
- N 2
1980
Docket Nos. 50-277
50-278
Philadelphia Electric Company
ATTN:
Mr. S. L. Daltroff
Vice President
Electric Production
2301 Market Street
Philadelphia, Pennsylvania 19101
Gentlemen:
Subject:
Inspection 50-277/79-28 and 50-278/79-31
This refers to the inspection conducted by Dr. L. Bettenhausen of this office on
November 13-21, 1979, at Peach Bottom Atomic Power Station and other company
locations of activities authorized by NRC License Nos. DPR-44 and DPR-56 and to
the discussions of our findings held by Dr. Bettenhausen with Mr. W. T. Ullrich
of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations c. procedures
and representative records, interviews with personnel, and observations by the
inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This item of noncompliance
has been categorized into the levels as described in our correspondence to you
dated December 31, 1974.
This notice is sent to you pursuant to the provisions
of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations. Section 2.201 requires you to submit to this office,
within twenty (20) days of your receipt of this notice, a written statement or
explanation in reply including:
(1) corrective steps which have been taken by
you and the results achieved; (2) corrective steps which will be taken to avoid
further items of noncompliance; and (3) the date when full compliance will be
achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room.
If this report contains any informa-
tion that you (or your contractor) believe to be proprietary, it is necessary
that you make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must be accompanied
8002280
3d
.
,
.
Philadelphia Electric Company
2
JAN 2
19 80
by an affidavit executed by the owner of the information, which identifies the
document or part sought to be withheld, and which contains a statement of reasons
which addresses with specificity the items which will be considered by the
Commission as listed in subparagraph (b) (4) of Section 2.790. The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified period, che report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
don J.1 r / G
'
'
.
/
unner, Chief
g
j
Reactor Operations and Nuclear
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Inspection Report
Numbers 50-277/79-28 and 50-278/79-31
cc w/encls:
W. T. Ullrich, Station Superintendent
Troy B. Conner, Jr. , Esquire (Without Report)
Eugene J. Bradley, Esquire (Without Report)
Raymond L. Hovis, Esquire (Without Report)
Michael J. Scibinico, II, Assistant Attorney General (Without Report)