Responds to NRC Re Violations Noted in IE Insp Repts 50-277/79-28 & 50-278/79-31.Corrective Actions:Review of Abnormal & Emergency Procedures Will Be Initiated in Jan 1980
ML19294B401
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 01/21/1980
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19294B390 List:
References
NUDOCS 8002280300
Download: ML19294B401 (2)


Text

,

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101

$HIELOS L DALTROFF ELtcf m c Pn o c som January 21, 1980 Re: Docket Nos.: 50-277 50-278 Inspection No.: 50-277/79-23 50-278/79-31 Mr. Eldon J.

Brunner, Chief Reactor Operations & Nuclear Support Branch US Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406

Dear Mr. Brunner:

Your letter of January 2,

1980, f orwarded combined Inspection Rep orts 50-277/79-29 and 50-278/79-31.

Appendix A to y ou r letter addresses an item which did not appear t o be in full comp liance with Nuclear Regulat ory Commission requirements.

This item is categorized as a deficiency and is restated below with ou r respons e.

10 CFR Part 55, Appendix A, Requalification Programs for Licens ed Operat ors of Production and Utilization Facilities, states, in part, "1.

Schedule.

The requalification program shall be conducted f or a continuous period not to exceed two years..."

and, "3.d.

Each licensed operator and senior op e ra t or reviews the contents of all abnormal and emergency procedures on a re gu la rly scheduled basis."

800228o 3 0 0

e Mr.

E.

J.

Brunner, Chief Page 2

Response

During the past few years, review of abnormal and emergency procedures were scheduled whenever significant revisions to these procedures were made.

Some procedures were reviewed as part of the requalification lecture for operator training.

Our records shou for the period January 1978 t o December 1979, that 43 of the 103 abnormal and emergency procedures were reviewed by the licensed operators.

The f ollowing corrective action has been initiated:

1.

Required review of abnormal and emergency procedures will be initiated in January 1980, by inclusion in the monthly requalification reading assignments.

The 60 procedures not reviewed for the period January 19 7 8 t o December 1979 will be scheduled for review on a priority basis during 1980 monthly reading assignments.

2.

All abnormal and eme rgency procedures (including OT, E,

EP, and SE procedures) shall be reviewed by each licensed operator (LO) and senior licensed operator (SLO) every two years.

3.

Documentation of required p rocedure review shall be recorded by the training coordinator.

Very t ru ly yours, l

v-o.aaf

/