UNITED STATES Sn nroo o
NUCLEAR REGULATORY COMMisslON
\\}g{
g REGION I O
.g 438 PARK AVENUE
" C KING OF PRUSSIA, PENNSYLVANIA 19406
%*,Ji/
s.*
Docket No. 50-219 File No. IAL-79-21 Jersey Central Power and Light Company ATTN: Mr. Ivan R. Finfrock, Jr.
Vice President Madison Avenue at Punch Bowl Road Morristown, New Jersey 07960 Gentlemen:
This refers to the telephone conversation between Mr. Donald Ross, Manager Nuclear Generating Stations, Jersey Central Power and Light Company, and Mr. James M. Allan, Deputy Director, U.S. Nuclear Regulatory Commission, Region I, on December 21, 1979. This telephone conversation related to our concerns about the status of gaseous effluent releases from the New Radwaste Facility at your Oyster Creek Nuclear Generating Sta tion. With regard to the matter discussed in the referenced conversation, we understand that you have undertaken or will undertake the following actions and evaluations.
1.
An initial evaluation has been made to determine the levels of current releases from the New Radioactive Waste Building to determine compliance with allowable release limits.
This initial evaluation, perfonned December 21, 1979, indicated current releases are within allowable limits.
2.
A Technical Specification covering releases via the New Radwaste Building Vent and associated building operations will be submitted along with Technical Specifications for releases from the Augmented Off-Gas Building Vent.
This submittal will be made by March 1, 1980.
3.
The New Radwaste Building Gaseous Effluent Monitor has received a partial calibration on the low scale end.
Operators will take hourly readings of this instrument readout, and when and if readings exceed that portion of the scale that is calibrated, the operator will isolate ventilation and consult shift management for instructions.
4.
The present alarm setpoints were evaluated on December 21, 1979, and are set to alarm at setpoints to preclude release in excess of allowable limits.
Complete alarm set point evaluation will be completed by February 1,1980.
1793 204 8001240
[h
Jersey Central Power and Light Company 2
DEC 2 6 073 5.
An evaluation will be performed to determine the need for automatic Radwaste Building ventilation isolation upon a High Trip Alann.
(In the interim, the operator will effect isolation manually.)
This evaluation will be completed by February 1,1980.
If our understanding of your planned actions as described above is not in accordance with the actual plans and actions being implemented, please contact this office by telephone and in writing within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Sincerely, nur }ff h;'5b~
/
'-James M. Allan Deputy Director cc:
J. T. Carroll, Station Superintendent 1793 205