/03L-0:on 791117,while Reactor at Steady State of Operation,Dc Input Breaker to 2R44-S003 Tripped.Caused by Failure of Small Control Relay at LPCI Converter.Relay Replaced
ML19291B953
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/07/1979
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19291B952 List:
References
LER-79-122-03L, LER-79-122-3L, NUDOCS 7912140448
Download: ML19291B953 (2)


LER-1979-122, /03L-0:on 791117,while Reactor at Steady State of Operation,Dc Input Breaker to 2R44-S003 Tripped.Caused by Failure of Small Control Relay at LPCI Converter.Relay Replaced
Event date:
Report date:
3661979122R03 - NRC Website

text

(1 711 LICENSEE EVENT llEPORT IL CO?:IHOL CLOCK-l l

l

  1. re r,er a rarn r,n TvPC et t nrotunt n INFonMATIOf>l I

b 2 l@l 0 l 0 l 0 l 0 l 0 l 0 l 0 l 0 l 0j 0 l 0 l@[ 4 l 1 l1 l1l1j@l l

lg lGlAlElI 11 o

i 7

8 9 L.8CEf.SLL LO9(

14 lb L N tf..,L NL W M H 2b 2u LICLNSL 1YPL JO 57 CAI La CC [I l)

[.$$lLj@[0l510l010l3l616l@lIlI l.117l719 @l11210l7l719j@

l i

Il OU G1 DOCKET NUf/DE H (4

td LVLNT DAIL J4 75 fit rOH T () AI L E0 Evttrr DESCmPTION AND PHO3 AGLE CONSCOUENCtS h O 7 l While the reactor was at a steady state of operation, the D. C.

Input lireaker to l

21<44-S003 ("B" LPCI Inverter) tripped.

This breaker is the priraary power suppy for ggl y o igj l the LPCI system valves, but the back-up systen was operable.

The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> LCO cOuld not be ract on the Inverter, so the reactor uas safely shutfown until the problem o

3 o c l could be solved. The safety of the general public was not af fected. This is a [g l non-repetitive event.

[

l O

H l

80 7

8 9 SYST E M

CAUSE

CAUSE COMP.

VALVE CODE CODE SUSCODE COMPONENT CODE St;ttCODE SUCCODE l El Cl@ lE l@ l A l@ lR lE lL'lA lY lX j@ [B j@ W @

o 9

_7 8

9 to 11 12 13 18 20 SE QUE NTI A L OCCUR P L NCE ftEPOHT REVISIOfJ LVf N1 YE AR REPORT NO.

COOE TYPE NO.

@ g(tgjo (719l l-l l1 l2 l2 l d-10 13 l lM

(---j 0l

.O R T

__ 21 21 2J 24 26 27 28 29 30 31 32 AC1 TON TU1URL EFFEC 1 SHUIDOWN ATTACH'3 E NT

!#TtD-PRlr.aE COMP.

COMPO'!!N T TAKEis Acilord ON PL ANT f?L1HOO HOURS SU M11TLD F CR'.* b r SUPP Lt L R MANUFAClVRER

<33 34_

I^l@

l^j@

lo lo 1

I [Lj@

I N i@

IN l g lX l9 ]9 l9 p l A l@l A j@

33 35 3/

40 41 42 43 44 47 CAu;E DESCNPTION AND CORHECTIVE ACTIONS h [ijoll The cause of the D.

C. input breaker to 2R44-S003 ("B" LPCI Inverter) vas due to the l

[ f ailure of a 'small cont rol relay at the LPCI Inverter.

The relay wris replaced and 1

3 i

3

, l the Inverter tested and returned to service.

l I iTil l I

i v.

I i

E3 7

8 9 51 1 S

% PO'f. E H OTiiER STATUS D SC f

DSCOVEltY DESCRIPllON NA l

W @l Operator Obnervation j

[1]@ l 0 l 9 l 6]Ql i

s AC TIVI T Y CC TENT nttt ASED OF f:f LEMC AMOUNT OF ACTIVITY LG' AllON OF ALLLASL NA l

l NA l

{ Zj @ ld@l i

6 7

8 9 10 11 44 45 80 FERSONNE L EXPOGUHIS NU'?nt H T YPi DE SCRIPTION NA l

I i I e i 10 10 10 l@Lz_le!

l k

l'IHSONNE L INJLI if S NUvtE n OLSchlPTION [1jij l0l0 l0 l@]

HA I

lj l

iL 80

{] g jgl

.) d 7

8 9 11 12 L USS Of QH DA*tAGE 10 f ACIL11Y T YP1' OI SC RIP ilGN s

3 l

7 E 9 10 tiO

..soi"""!22Cnirnu,@

7912140 M S NHC USE ONL Y I/I"ILid,8l N^

J LI I I I I I Li ! ' ! l '.

3 s 9 io cs

(.9 en ;

X HIC "

N AF.t(i Of f'HiWHE H

s 0

a

~

NAl!RATIVls ItF.p0kT l

l Georp,la Pouer Company l

Plant E.

I. llatch j

Baxley, Georgia 31513 Reportable Occurrence Report No. 50-366/1979-122.

i Uhile the Unit II reactor was at normal operation, t h e 11. C.

input breaker

}

to 21144-S003 ("g" I.PCI Inve rter) t ripped.

This breaker is the primary power source for the LPCI system valves and al though it trippeJ, the back-up power cource was available, f

The reason that the breaker tripped was due to the failure of a small control relay, located at the LPCI Inverter.

The failure of this relay caused the plant to be under a 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> LCO.

The problen could not he identified and solved during this period so the reactor was safely shutdown f rom a power IcVel of 96% until the problem was corrected which was approximately 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> later.

The relay was replaced and functionally tested for proper operation.

The Inverter was then returned to service and the unit was returned to service.

The failure of the control relay has not happened previcusly.

i The problem is applicable to the other unit in'that the same type relay exists on the Unit I LPCI Inverter.

These particular reiays are not used in this application in any other safety related system on either unit.

Unit one's relay on the LPCI Inverter was inspected for proper operation.

Inspection proved that the relay was operating snLisfactorily.