ML19291B952

From kanterella
Jump to navigation Jump to search
Forwards LER 79-122/03L-0
Date released: 11/01/2019 Download: ML19291B952


LER 79-122/03L-0:on 791117,while Reactor at Steady State of Operation,Dc Input Breaker to 2R44-S003 Tripped.Caused by Failure of Small Control Relay at LPCI Converter.Relay Replaced
ML19291B953
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/07/1979
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19291B953 (2)
Forwards LER 79-122/03L-0
ML19291B951
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/07/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19291B951 (1)