Forwards IE Insp Rept 50-302/79-18 on 790601.No Noncompliance Noted
ML19291B028
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/19/1979
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML19291B029 List:
References
NUDOCS 7908290213
Download: ML19291B028 (2)


See also: IR 05000302/1979018

Text

. . . . . . . - . - - .

Tic

-

!e asog#c

UNITED STATES

NUCLEAR REGULATORY COMMISSION

'

f

8 " ) ., ,

g

REGION 11

r

g, (

101 MAR ETTA sT., N.W., SUITE 3100

g

ATLA 7A, GEORGIA 30303

\\/

In Repl..+y Refer To:

RII:ALC

JUN 191979

50-302/79-18

Florida Power Corporation

Atta:

W. P. Stewart, Manager,

Nuclear Operations

Post Office Box 14042, Mail Stop C-4

St. Petersburg, Florida 33733

Gentlemen:

,

This refers to the inspection conducted by A. L. Cunningham of this

office on June 1, 1979 of activities authorized by NRC License No.

DPR-72 for the Crystal River facility, Unit 3, and to the discussion of

our findings held with W. S. O'Brien at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

,

We have examined actions you have taken with regard to previously identi-

fied enforcement matters. These are discussed in the enclosed inspection

'

report.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

.

79082902(3

_ . _ _ ___

_ _ _ . . _ . . _

. . _ .

.

JUN 191979

.

Florida Power Corporation

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

4

-

J. T. Sutherland, Chief

Fuel Facility and Materials

Safety Branch

Enclosure:

Inspection Report No. 50-302/79-18

.

ec'</ enclosure:

G. P. Beatty, Jr.

Nuilear Plant Superintendent

Pott Office Box 1228