ML19290G691

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-369/80-28 & 50-370/80-10 on 800929-1002.No Noncompliance Noted
ML19290G691
Person / Time
Site: McGuire, Mcguire  
Issue date: 11/12/1980
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19290G689 List:
References
NUDOCS 8012180366
Download: ML19290G691 (2)


See also: IR 05000369/1980028

Text

,.

f

a arco

+

'o

UNITED STATES

~,

! " ) ,,

NUCLEAR REGULATORY COMMISSION

g

-

"

< .r

REGION 11

o,

}f

101 MARIETTA sT., N.W., sulTE 3100

'

j'

ATLANTA, G E ORGI A 3o3o3

  • .***

In Reply Refer To:

NOV 121980

RII:GTG

50-369/80-28

50-370/80-10

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by G. T. Gibson of this office on September 29

through October 2,1980 of activities authorized by NRC Construction Peimit Nos.

CPPR-83 and CPPR-84 for the McGuire Nuclear Station facility, and to the discus-

sion of our findings held with M. McIntosh at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

  1. personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

Ir: accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is propriet ry, and should be prepared so that prol.rietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

JA

.

ilip

obr, Chief

.

Fuel Facility and Materials

Safety Branch

Enclosure:

See Page 2

3c 12180

.

'

Duke Power Company

-2-

NOV 121980

Enclosure:

Inspection Report Nos. 50-369/80-28

and 50-370/80-10

cc w/ encl:

M. D. McIntosh, Plaat Manager

J. C. Rogers, Project Manager