ML19290G618
| ML19290G618 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 10/02/1980 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Ferguson J VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| Shared Package | |
| ML17150A124 | List: |
| References | |
| NUDOCS 8012180145 | |
| Download: ML19290G618 (2) | |
See also: IR 05000338/1980030
Text
.O
'
n arco
[o
o
UNITED STATES
^g
[
NUCLEAR REGULATORY COMMISSION
3 7,g
,
- ,g g /.I
REGION ll
o, .g .g
[
101 MARIETTA ST.. N.W., SUITE 3100
' %< g
ATLANTA, GEORGI A 3o3o3
OCT 0 21980
.....
In Reply Refer To:
RII:EHW
50-338/80-30
50-339/80-29
Virginia Electric and Power Company
ATTN:
J. H. Ferguson
Executive Vice President-Power
P. O. Box 26666
Richmond, VA 23261
Gentlemen:
This refers to the inspection conducted by E. H. Webster of this office on
July 12 August 20, 1980, of activities authorized by NRC License Nos. NPF-4 and
NPF-7 for the North Anna facility, and to the discussion of our findings held
with W. R. Cartwright at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
We have examined actions you have taken with regard to previously reported
unresolved items. The status of these items is discussed in the enclosed report.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
During the inspection it was found that certain activities under your license
appear to deviate from commitments to the Commission and have safety significance.
,
This item identified in the Notice of Deviation enclosed herewith as Appendix A.
Please provide us in writing within 20 days of your receipt of this letter your
comments including a description of corrective actions that have been or will be
taken, corrective actions which will be taken to avoid further deviations, and
the date corrective actions were or will be completed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
,
Title 10, Code of Federal Regulations, a copy cf this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
rec a e > "I'/5
,
0215S0
Virginia Electric and Power Company
-2_
,
Should you have any questions concerning this letter, wc will be glad to discuss
them with you.
Sincerely,
)5'.(T.
R. C.
.ewis, Acting Chief
Reactor Operations and Nuclear
Support Branch
Enclosures:
1.
Appendix A, Notice of Deviation
2.
Inspection Report Nos. 50-338/80-30
and 50-339/80-29
cc w/ encl:
W. R. Cartwright, Station Manager
P. G. Perry, Senior Resident Engineer