Forwards IE Insp Repts 50-338/80-30 & 50-339/80-29 on 800712-0820 & Notice of Deviation
ML19290G618
Person / Time
Site: North Anna  
Issue date: 10/02/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Ferguson J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML17150A124 List:
References
NUDOCS 8012180145
Download: ML19290G618 (2)


See also: IR 05000338/1980030

Text

.O

'

n arco

[o

o

UNITED STATES

^g

[

NUCLEAR REGULATORY COMMISSION

3 7,g

,

,g g /.I

REGION ll

o, .g .g

[

101 MARIETTA ST.. N.W., SUITE 3100

' %< g

ATLANTA, GEORGI A 3o3o3

OCT 0 21980

.....

In Reply Refer To:

RII:EHW

50-338/80-30

50-339/80-29

Virginia Electric and Power Company

ATTN:

J. H. Ferguson

Executive Vice President-Power

P. O. Box 26666

Richmond, VA 23261

Gentlemen:

This refers to the inspection conducted by E. H. Webster of this office on

July 12 August 20, 1980, of activities authorized by NRC License Nos. NPF-4 and

NPF-7 for the North Anna facility, and to the discussion of our findings held

with W. R. Cartwright at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed report.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

During the inspection it was found that certain activities under your license

appear to deviate from commitments to the Commission and have safety significance.

,

This item identified in the Notice of Deviation enclosed herewith as Appendix A.

Please provide us in writing within 20 days of your receipt of this letter your

comments including a description of corrective actions that have been or will be

taken, corrective actions which will be taken to avoid further deviations, and

the date corrective actions were or will be completed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

,

Title 10, Code of Federal Regulations, a copy cf this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

rec a e > "I'/5

,

0215S0

Virginia Electric and Power Company

-2_

,

Should you have any questions concerning this letter, wc will be glad to discuss

them with you.

Sincerely,

)5'.(T.

R. C.

.ewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Deviation

2.

Inspection Report Nos. 50-338/80-30

and 50-339/80-29

cc w/ encl:

W. R. Cartwright, Station Manager

P. G. Perry, Senior Resident Engineer