Forwards IE Insp Repts 50-413/80-24 & 50-414/80-24 on 800902-05 & Notice of Violation
ML19290G617
Person / Time
Site: 05000141, Catawba
Issue date: 10/08/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19290G609 List:
References
NUDOCS 8012180144
Download: ML19290G617 (2)


See also: IR 05000413/1980024

Text

[p nom

o

UNITED STATES

',

E'

't

NUCLEAR REGULATORY COMMISSION

,,f

$(

Z

J.

$

REGION 11

o,

sj

f

101 MARIETTA sT.. N.W., SUITE 3100

'

%-

j'

AT L AC A, GEORGI A 303o3

.....

In Reply Refer To:

RII:kTK

50-413/80-24

50 414/80-24

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by W. P. Kleinsorge of this office on

September 2-5, 1980, of activities authorized by hTC Construction Permit Nos.

CPPR-116 and CPPR-117 for the Catawba facility, and to the discussion of our

findiro s held with D. L. Freeze at the conclusion of the inspection.

Areas examined during the insnection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

salective examinations of procedures and representative records, interviews with

personnel, and observatluns by the inspector.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enc 1c.;ed inspection report.

Two new unresolved items resulted from this inspection and are discussed in the

enclosed report. These items will be examined during subsequent inspections.

During this inspection it was found that certain activities under your license

appear to be in noncompliance with hTC requirements. These items and references

to pertinent requirements are listed ;a the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions.

Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved. With regard to item 413/80-24-02

corrective actions to prevent recurrence were completed prior to conclusion of

this inspection; therefore, a reply is not requested for this item.

In accordance with Section 2.790 of the NRC's " Rules of hactice," Part 2,

Title 10, Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withho!d such inforn tion from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

801Pi.:o/N

.

OCT 08taso

Duke Power Company

_,_

-

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to c1scuss

them with you.

Sincerely,

k k

,A-4

C. E. Murphy,

ief

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-413/80-24

and 50-414/80-24

cc w/ enc 1:

J. K. Hampton, Station Manager

D. G. Beam, Project Ma::ager

.