[p nom
o
UNITED STATES
',
E'
't
NUCLEAR REGULATORY COMMISSION
,,f
$(
Z
J.
$
REGION 11
o,
sj
f
101 MARIETTA sT.. N.W., SUITE 3100
'
%-
j'
AT L AC A, GEORGI A 303o3
.....
In Reply Refer To:
RII:kTK
50-413/80-24
50 414/80-24
Duke Power Company
ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
Gentlemen:
This refers to the inspection conducted by W. P. Kleinsorge of this office on
September 2-5, 1980, of activities authorized by hTC Construction Permit Nos.
CPPR-116 and CPPR-117 for the Catawba facility, and to the discussion of our
findiro s held with D. L. Freeze at the conclusion of the inspection.
Areas examined during the insnection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
salective examinations of procedures and representative records, interviews with
personnel, and observatluns by the inspector.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enc 1c.;ed inspection report.
Two new unresolved items resulted from this inspection and are discussed in the
enclosed report. These items will be examined during subsequent inspections.
During this inspection it was found that certain activities under your license
appear to be in noncompliance with hTC requirements. These items and references
to pertinent requirements are listed ;a the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-
tions.
Section 2.201 requires you to submit to this office, within 20 days of
your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full compliance will be achieved. With regard to item 413/80-24-02
corrective actions to prevent recurrence were completed prior to conclusion of
this inspection; therefore, a reply is not requested for this item.
In accordance with Section 2.790 of the NRC's " Rules of hactice," Part 2,
Title 10, Code of Federal Regulations,
a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withho!d such inforn tion from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
801Pi.:o/N
.
OCT 08taso
Duke Power Company
_,_
-
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to c1scuss
them with you.
Sincerely,
k k
,A-4
C. E. Murphy,
ief
Reactor Construction and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-413/80-24
and 50-414/80-24
cc w/ enc 1:
J. K. Hampton, Station Manager
D. G. Beam, Project Ma::ager
.