Text

Alabama Power Company 600 Nonh 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 323-5341 m

hbo?'v^c'e'E12., Alabama Power fte Sout!1tYn PiW(rc System March 7, 1980 Docket Nos. 50-348 50-364 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Mr. John F. Stolz

Dear Mr. Stolz:

Alabama Power Company hereby files Amendnent 72 to the FSAR for J.

M. Farley Nuclear Plant-Unit No. 1 and to the Application for a license for the J. M. Farley Nuclear Plant-Unit No. 2. This Amendment consists of the revisions tabulated in Attachment 1 of this letter.

Revisions applicable to Farley-Unit No. 1 as necessary have been reviewed by the Plant Operations Review Committee and found not to con-stitute an unreviewed safety question.

In accordance with the requirements of 10 CFR Section 50.30(c)(1)(1) for Unit 2, we enclose three (3) signed copies and sixty (60) conformed copies of the Amendment. Also enclosed is a ' certificate of service of a copy of the Amendment upon the Chairman of the Houston County Commission.

Yours very truly,

. ") -

W F. D. Clayton, J r.

FLCJr/TNE:bhj Enclosures cc: Mr. G. F. Trowbridge Mr. R. A. Thomas 800310 0 l 2517

BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION Unit No. 1 - Docket No. 50-348 Unit No. 2 - Docket No. 50-364 In the Matter of Alabama Power C:.mpany AMENDMENT N0. 72 TO THE FINAL SAFETY ANALYSIS REPORT FOR J. M. FARLEY NULLEAR PLANT-UNIT N0. 1 AND TO THE APPLICATION FOR LICENSE FOR THE J. M. FARLEY NUCLEAR PLANT-UNIT NO. 2 UNDER THE ATOMIC ENERGY ACT OF 1954 Alabama Power Company hereby files Amendment No. 72 to its Final Safety Analysis Report for Farley Unit 1 and to its Application for License for Farley Unit 2 dated October 10, 1969.

This Amendment consists of revised pages for the Final Safety Analysis Report. Instructions for inserting this material are included.

ALABAMA POWER COMPANY By' '

, [

F.' L ' Claytop/, Jr.

Senior Vice President Sworn to and subscribed before me Mis 7 day of Mr,v/ , / M.

f) /, ~ /f L. '

Notary Public, Alabag State at Large My Commission Expires:

5-22-82

CERTIFICATE OF SERVICE I certify that a copy of Amendment No. 72 to the Alabama Power Company's Final Safety Analysis Report for its Joseph M. Farley Nuclear Plant-Unit No.1 and Application for License for the Joseph M. Farley Nuclear Plant-Unit No. 2 under the Atomic Energy Act of 1954 have been forwarded to th 7E day af _j{ce ec/e designated 4, }?80 individual properly addressed on this Honorable Nathan Mathis, Chairman Houston County Commission P.O. Box 1672 Dothan, Alabama 36301 ALABAMA POWER COMPANY F . L . 'Cl ay to n , J r ._-.

Senior Vice P >sident

AMENDMENT 72 Tabulation of Revisions FSAR Section Reason for Revision 1.1 Revised Unit 2 Completion of Construction and Com-mercial Operation dates.

1.2 Incorporated deletion of part length control rods.

4.1 This change was approved by the NRC on Farley Unit 4.2 1 by letter dated March 2, 1979 to Alabama Power 4.3 Company.

4.3 Updated information regarding fuel storage design.

This change was approved by the NRC on Farley Unit 1 by letter dated February 13, 1979 to Alabama Power Company.

5.2 Incorporated description of che reactor coolant system 5.5 low temperature overpressutization system. This de-sign was approved by the NRC by letter dated July 31, 1979 to Alabama Power Company.

6.2 Incorporated descriptien of the containment mini-purge system.

6.3 Incorporated additional information requested by the App. 6C NRC concerning the Unit 2 containment sump test pro-gram.

7.1 Incorporated safety injection actuation logic of two-7.2 out-of-three low pressurizer pressure channels. This 7.3 change was approved by the NRC on Farley Unit 1 by letter dated June 11, 1979 to Alabama Power Company.

7.2 Incorporated changes associated with reactor trip on turbine trip above 50% power. This change was approved by the NRC on Farley Unit 1 by letter dated March 2, 1979 to Alabama Power Company.

7.6 Incorporated changes associated with the reactor coolant system low temperature overpressurization protection system.

7.7 Incorporated changes associated with the deletion of the part length control rods and with reactor trip on turbine trip above 50% power.

8.3 Incorporated changes associated with the power supply to the turbine-driven auxiliary feedwater pump controls described in Alabama Power Company letter dated Dec ember 20, 1978 to the NRC.

AMENDMENT 72 Tabulation of Revisions Page 2 FSAR Section Reason for Revision 9.1 Update Figure 9.1-1.

10.3 Update Figure 10.3-5.

10.4 Incorporated changes associated with the addition of feedwater bypass valves.

11.5 Updated information in Table 11.5-1, 14.1 Updated information pertaining to startup test pro-14.2 gram.

15.1 Incorporated revised ECCS analysis which utilized 15.4 the February, 1978 version of the Westinghouse ECCS Evaluation Model. This analysis was approved by the NRC on Farley Unit 1 by letter dated May 9, 1979 to Alabama Power Company.

15.2 Incorporated changes associsted with the deletion of the part length control rods and with reactor trip on turbine trip above 507. power.

15.2 Incorporated safety injection logic of two-out-of-15.3 three low pressurizer pressure channels.

15.4 17.0 Updated information pertaining to the Quality Assurance Program.

EICBS-4 Incorporated changes associated with the reactor EICBS-4A coolant system low temperature overprotection system.