ML19290B121

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 791022.Noncompliance Noted:No Periodic Biannual Training for Radiographers & Leak Testing of Co-60 Performed in Excess of Six Months
ML19290B121
Person / Time
Issue date: 11/16/1979
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19290B120 List:
References
NUDOCS 7911300175
Download: ML19290B121 (1)


Text

__

Appendix A NOTICE 0F VIOLATION Wehr Steel Company License No. 48-02005-02 Based on the inspection conducted on October 22, 1979, it appears that certain of your activities were in noncompliance with NRC requirements, as noted below.

Items 1 and 2 are infractions.

1.

License Condition No. 16 of Byproduct Material License No. 48-02005-02, states, in part, the licensee shall possess and use licensed material in accordance with statements, representations, and procedures con-tained in application dated June 30, 1977. The Revised Procedure Manual, Chapter V, Section A.3. " Periodic Training", submitted with this application, requires that periodic training be given to Radio-graphers on a regular schedule of twice each calendar year.

Contrary to this requirement, since June, 1977, to the date of this inspection, no periodic training has been given to Radiographers on a regular schedule of twice each calendar year.

2.

Paragraph 10 CFR 34.25(b), Title 10 of the Code of Federal Regulations, Part 34, states in part, each sealed source shall be tested for leakage at intervals not to exceed six months.

Contra ry to this requirement, as of the date of this inspection, leak testing of the cobalt-60 sealed sources had been performed during October, 1978 and October, 1979, a period in excess of the required six months.

2119 004 m i s o o l'7 5 '