p at%
UNITED STA TES
NUCLEAR REGULATORY COMMISSION
[
o,$
+
,
R EGION il
5
$
101 M ARIETTA STRE ET. N.W.
ATLANTA, GEORGI A 3o303
o
s*****/
MAR ? 31979
In Reply Refer To:
RII:WPA
50-369/79-15
50-37a/79-7
Duke Power Company
Atta:
Mr. William O. Parker, Jr.
Vice President, Steam Production
Post Office Box 33189
422 South Church Street
Charlotte, North Carolina 28242
Gentlemen:
This refers to the inspection conducted by Mr. W. P. Ang of this office
on February 28 through March 2,1979 of activities authorized by NRC
License Nos. CPPR-83 and CPPR-84 for the McGuire facility, Units 1 and
2, and to the discussion of our findings held with Mr. G. Grier at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
cons.:sted of selective examinations of procedures and representative
records, interviews with per:onnel, and observations by the inspector.
We have examined actions you have taken with regard to previously
identified inspection findings. These are discussed in the enclosed inspection
report.
One new unresolved item resulted from this inspection and is discussed
in the enclosed report. This item will be examined during subsequet.t
inspections.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. This item
and references to pertinent requirersents are listed in the Notice of
Violation enclosed herewith as Appendix A.
This ne*. ice is sent to you
pursuant to the provitions of Section 2.201 of the NRC's " Rules of
Practice", Part 2, Title 10, Code of Federal Regulations.
Section 2.201
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by you, and the results schieved;
(2) corrective steps which will be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
2228 055
7906180 037
k
. . . . , . .
.
.__
_ _ _ _
,
MAR 2 3197s
-
Duke Power Company
-2-
the enclosed inspection report will be 9 aced in the NRC's Public Document
1
Room.
If this report contains any info nnation that you (or your contractor)
believe to be proprietary, it is necessa ry that you make a written
application within 20 days to this office tt withhold such information
from public disclosure. Any such application must include a full statement
of the reasons on the basis of which it is claimed that the information
is proprietary, and should be prepared so that proprietary information
identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified
period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
'Wic,
-
barles E. Murphy, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-369/79-15
and 50-370/79-7
cc w/ enclosures:
Mr. M. D. McIntosh, Plant Manager
McGuire Nuclear Station
Post Office Box 488
Cornelius, North Carolina 28031
Mr. J. C. Rogers, Project Manager
McGuire Nuclear Station
Post Office Box 33189
Charlotte, North Carolina 28242
.