Forwards IE Insp Repts 50-491/79-06,50-492/79-06 & 50-493/79-06 on 790313-16.No Noncompliance Noted
ML19289F370
Person / Time
Site: Cherokee  Duke Energy icon.png
Issue date: 04/06/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML19289F371 List:
References
NUDOCS 7906070284
Download: ML19289F370 (2)


See also: IR 05000491/1979006

Text

[

'

UNITED STATES

k8 Ho

M

ug'o

NUCLEAR REGULATORY COMMISSION

g

[

REGloN 11

o

101 MARIETTA STREET, N.W.

5

. 8

ATLANTA, GEORGIA 3o303

t

\\*****/

APR 0 61979

In Reply Refer To:

RII:JKR

50-491/79-06

50-492/79-06

50-493/79-06

Duke Power Company

ATTN:

L. C. Dail, Vice President

Design Engineering

P. O. Box 33189

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by J. K. Rausch of this office on

March 13-16, 1979, of activities authorized by NRC Construction Permit Nos.

CPPR-167, CPPR-168, and CPPR-169 for the Cherokee Nuclear Station facility,

and to the discussion of our findings held with C. B. Aycock at the conclusion

of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed

report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within

20 days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasonn on the

basis of which it is claimed that the information is proprietary, and should

be prepared so that proprietary information identified in the application is

contained in a separate part of the document.

If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document Room.

79060702f

z7g

..

,

a

APR 0 61979

Duke Power Company

-2-

Should you have any questions concerning this letter, we will be glad to

disc"ss them with you.

Sincerely,

Charles E. Murphy, Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

Inspection Report No. 491/79-06,

50-492/79-06, and 50-493/79-06

cc w/ enc 1:

J. T. Moore, Project Maniger

P. O. Box 422

Gaffney, SC 29340

2232

179