Forwards IE Insp Repts 50-327/79-08 & 50-328/79-04 on 790130-0201 & Notice of Violation
ML19289F175
Person / Time
Site: Sequoyah  
Issue date: 03/14/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19289F171 List:
References
NUDOCS 7906040377
Download: ML19289F175 (3)


See also: IR 05000327/1979008

Text

4

Y

[g* 88G jo,,

NUCLEAR REGULATORY COMMISSION

UNITED STATES

09

e

&

o

REGloN il

0

9 e

101 M ARIETTA STRE ET, N.W.

8

ATLANT A, CEoRGIA 30303

o,

'%....+

NAR 141979

In Reply Refer To:

RII:PKV

50-327/79-08

50-328/79-04

Tennessee Valley Authority

Attn:

Mr. H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, Tennessee 37401

Gentlemen:

This refers to the inspection conducted by Mr. P. K. VanDoorn of this

office on January 30 through February 1, 1979 of activities authorized

by NRC License Nos. CPPR-72 and CPPR-73 for the Sequoyah Nuclear Plant

facility, Units 1 and 2, and to the discussion of our findings held with

Mr. R. W. Olsen at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously reported

unresolved items.

The status of these items is discussed in the enclosed

report.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements. This item

and references to pertinent requirements are listed in the Notice of

Violation enclosed herewith as Appendix A.

This notice is sent to you

pursuant to the provisions of Section 2.201 of the NRC's " Rules of

Practice", Part 2, Title 10, Code of Federal Regulations.

Section 2.201

requires you to submit to this office, within 20 days of your receipt of

this notice, a written statement or explanation in reply including:

(1)

corrective steps which have been taken by you, and the results achieved;

(2) corrective steps which will be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public Document

2236

145

790604037/d

,

.

MAR 141979

.

Tennessee Valley Authority

-2-

Room.

If this report contains any information that you (or your contrac-

tor) believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such information

from public disclosure.

Any such application must include a full statement

of the reasons on the basis of which it is claimed that the information

is proprietary, and should be prepared so that proprietary information

identified in the application is contained in a separate part of the

document.

If we do not hear from you in this regard within the specified

period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

L

Y

Charles E. Mur %p hief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-327/79-08

and 50-328/79-04

cc w/ enclosures:

Mr. J. E. Gilleland

Assistant Manager of Power

500C Chestnut Street Tower II

Chattanooga, Tennessee 37401

Mr. D. L. Lambert

Project Engineer}6 }46 400 Chestnut Street Tower II Chattanooga, Tennessee 37401 Mr. G. G. Stack, Project Manager Sequoyah Nuclear Plant Post Office Box 2000 Daisy, Tennessee 37319 cc continued: (See Page 3) .

. . Tennessee Valley Authority -3- cc w/ enclosures (Continued from Page 2) Mr. J. M. Ballentine Plant Superintendent Sequoyah Nuclear Plant Post Office Box 2000 Daisy, Tennessee 37319 Mr. J. F. Cox 400 Commerce Street W10C131C Knoxville, Tennessee 37902 2236 147 }}