05000336/LER-1978-014-03, /03L-0 on 780617:while Performing Monthly Control Element Assembly Surveillance Testing,Assembly 2 Dropped to Zero Steps from 178 Steps.No Component Failures Causing Control Element Assembly to Drop

From kanterella
(Redirected from ML19289F143)
Jump to navigation Jump to search
/03L-0 on 780617:while Performing Monthly Control Element Assembly Surveillance Testing,Assembly 2 Dropped to Zero Steps from 178 Steps.No Component Failures Causing Control Element Assembly to Drop
ML19289F143
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/14/1978
From: Crockett J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19289F141 List:
References
LER-78-014-03L, LER-78-14-3L, NUDOCS 7906040323
Download: ML19289F143 (1)


LER-1978-014, /03L-0 on 780617:while Performing Monthly Control Element Assembly Surveillance Testing,Assembly 2 Dropped to Zero Steps from 178 Steps.No Component Failures Causing Control Element Assembly to Drop
Event date:
Report date:
3361978014R03 - NRC Website

text

NRC FORM 3b6 w. a. e ww6 san n suwsm e wn e ww

.~.w..

(7 77)

~

.)

LICENSEE EVENT REPORT 1

CONTROL BLOCK: l l

l l

l l

l (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 e

lClTIMINISl2l@l0 0l-1010l01010l-0 lo l@l a l l l i l 1 l l@l I

l@

o 1

7 8 9 UCENSEE CODE 14 15 LICENSE NLMSER 25 26 LICENSE TYPE 40 5 7 C A T 58 CON'T 5ERS l L l@l 0 l 5 l 010 101313 16 l@l 0 6 11 17 l 7 81@ 01. 71 11 al 7181@

o 1

?

60 61 DOCKET NUMBER 6a 69 EV ENT OATE 74 75 REPORT C ATE 80 EVENT DESCRIPT1CN AND PROBABLE CCNSEQUENCES h o

2 i While performing monthly Control Element Assembly (CEA) surveillance testina per I

o 3

i Technical Specification 4.1.3.1.2, CEA No. 2 dropped to zero steos from 178 steps.

I o, ; This resulted in operation in Action statements 3.1.3.1.e (CEA misalignment)

I 3.2.3 (Fr(T)-maximurt of 1.453) and 3.2.4 (Tilt-maximum of.033).

Power was l

o 3

0 6

- l reduced and CEA No. 2 realigned to the remainder of Group 5 (Full out) within one og,
hour.

Fr(T) and Tilt were within specification within two hours of CEA

[

realignment.

Similar Occurrences:

76-55/3L, 10/22/76 & 73-10/3L, 6/12/78.

l o

7 8 9 80 CE CO E SUSC E COMPONENT CO CE SL8COCE SU E

o 9

i Rl Bl @ lE l @ lA l @ lC lR D

R IV lE l@ l Z l@ [ Z_l @

7 8

9 10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE MEPORT REVISION LER EV ENT Y E A R R EPORT NO.

CCCE TYPE NO.

@sug/RO 17 18 I l-l 10 il 14 I l/l l ol 31 it I l-l 101 as 21 22 23 24 26 27 IS 29 30 31 32 TK N AC ON CNP NT M

HOURS S 8 i FOR 8.

SL PP LI E MANUFAC RER Zl@lZl@

lBl@

I Z l@

l0 10 10 i3 I IN @

l Y l@

N I@

lC la 19 10 l @

33 34 35 36 37 40 el 42 43 44 47 CAUSE CESCRIPTION AND CCRRECTIVE ACTICNS There were no component failures causing the CEA to droo.

No parts were i

i o

replaced and the CEA was recovered.

I 1

2 I

I i

3 I

I i

I i

4 7

a 3 80

$A

% POWER OTHER STATUS 015 RY DISCOVERY OESCRIPTION l El@ ll0l0l@l NA l

l A l@l Ooerator observation.

l i

s ACT!VITY CONTENT RELEASED OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE h

l NA l

NA i

1 6

7 8 9 10 11 44 45 80 PERSONNEL EXPOSURES l0 0lOl@ TYPE @l NLMBER D ESCRIPTION

  • Zl NA l

1 7

PERSONNEL i~204 ES NUMBER

DESCRIPTION

9)

I0l0l0l@l NA l

i a

7 d 9 11 12 80

'fv E SESC%A'ON ' " " @

55 '

^

l Z l@l NA i

9 7

8 3 10 80

,SSuEf@fE CA,,,0N @

7906040323 NR usE ONov 1

lZ NA i

ll ll IllIll l I 2

2 o

7 8 3 IC 68 69 80 3 N A?.1E OF PAE PAR ER PHONE: