Forwards IE Insp Repts 50-416/79-02 & 50-417/79-02 on 790212-15 & Notice of Violation
ML19289F075
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 03/22/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML19289F073 List:
References
NUDOCS 7906010195
Download: ML19289F075 (2)


See also: IR 05000416/1979002

Text

..

UNITED STATES

/ M00g'o

NUCLEAR REGULATORY COMMISSION

i

[

,A

REolON11

101 MARIETTA STREET.N.W.

5

a

ATLANTA, GEORGIA 3o303

%,*****,/

MR 2 21979

In Reply Refer To:

RII:PKV

50-416/79-2

50-417/79-2

Mississippi Power and Light Company

Atta:

Mr. Norris L. Stampley

Vice President of Production

P. O. Box 1640

Jackson, Mississippi

39205

Gentlemen:

This refers to the inspection conducted by Mr. P. K. VanDoorn of this office on

February 12-15, 1979, of activities authorized by NRC Construction Permit Nos.

CPPR-118 and CPPR-119 for the Grand Gulf I and 2 facilities, and to the

discussion of our findings held with Mr. J. C. Fuller at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

Within these areas, the inspection consisted of

enclosed inspection report.

interviews

selective examinations of procedures and representative records,

with personnel, and observations by the inspectors.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

During the inspection, it was found that certain activities under your license

This item and references

appear to be in noncompliance with NRC requirements.

to pertinent requirements are listed in the Notice of Violation enclosed

This notice is sent to you pursuant to the provisions

herewith as Appendix A.

of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations.

Section 2.201 requires you to submit to this office,

within 20 days of your receipt of this notice, a written statement or

explanation in reply including: (1) corrective steps which have been taken by

you and the results achieved; (2) corrective steps which will be taken to avoid

further noncompliance; and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

If this

inspection report will be placed in the NRC's Public Document Room.

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this of fice to withhold such information from public disclosure. Any such

2234

.523

7906010\\%

'

.

.

MAR 2 21979

Mississippi Power and Light Co.

-2-

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

C. E. Murph ,

le

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-416/79-2

and 50-417/79-2

cc w/ encl:

Mr. W. L. Nail

Plant Superintendent

P. O. Box 756

Port Gibson, Mississippi

39150

4