ML19289F075
| ML19289F075 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 03/22/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stampley N MISSISSIPPI POWER & LIGHT CO. |
| Shared Package | |
| ML19289F073 | List: |
| References | |
| NUDOCS 7906010195 | |
| Download: ML19289F075 (2) | |
See also: IR 05000416/1979002
Text
..
UNITED STATES
/ M00g'o
NUCLEAR REGULATORY COMMISSION
i
[
,A
REolON11
101 MARIETTA STREET.N.W.
5
a
ATLANTA, GEORGIA 3o303
%,*****,/
MR 2 21979
In Reply Refer To:
RII:PKV
50-416/79-2
50-417/79-2
Mississippi Power and Light Company
Atta:
Mr. Norris L. Stampley
Vice President of Production
P. O. Box 1640
Jackson, Mississippi
39205
Gentlemen:
This refers to the inspection conducted by Mr. P. K. VanDoorn of this office on
February 12-15, 1979, of activities authorized by NRC Construction Permit Nos.
CPPR-118 and CPPR-119 for the Grand Gulf I and 2 facilities, and to the
discussion of our findings held with Mr. J. C. Fuller at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
Within these areas, the inspection consisted of
enclosed inspection report.
interviews
selective examinations of procedures and representative records,
with personnel, and observations by the inspectors.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
During the inspection, it was found that certain activities under your license
This item and references
appear to be in noncompliance with NRC requirements.
to pertinent requirements are listed in the Notice of Violation enclosed
This notice is sent to you pursuant to the provisions
herewith as Appendix A.
of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Section 2.201 requires you to submit to this office,
within 20 days of your receipt of this notice, a written statement or
explanation in reply including: (1) corrective steps which have been taken by
you and the results achieved; (2) corrective steps which will be taken to avoid
further noncompliance; and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
If this
inspection report will be placed in the NRC's Public Document Room.
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this of fice to withhold such information from public disclosure. Any such
2234
.523
7906010\\%
'
.
.
MAR 2 21979
Mississippi Power and Light Co.
-2-
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
C. E. Murph ,
le
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-416/79-2
and 50-417/79-2
cc w/ encl:
Mr. W. L. Nail
Plant Superintendent
P. O. Box 756
Port Gibson, Mississippi
39150
4