Forwards IE Insp Repts 50-321/79-05 & 50-366/79-06 on 790209.No Noncompliance Noted
ML19289E262
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/07/1979
From: Kenna W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19289E259 List:
References
NUDOCS 7904110013
Download: ML19289E262 (2)


See also: IR 05000321/1979005

Text

e

e,

.

(g# 88%g

UNITED STATES

o

NUCtEAR REGULATORY COMMISSION

f,

,

o

REGloN il

I

E

101 MARIETTA STREET, N.W.

'E

ATI.ANTA, GEORGIA 3o303

o

%...../

In Reply Refer To:

RII:JMF

50-321/79-5

50-366/79-6

Georgia Power Company

Atta:

Mr. J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street, N.W.

Atlanta, Georgia 30303

Gentlemen:

This refers to the inspection conducted by Mr. J. M. Fuchko of this office

on February 9, 1979, of activities authorized by NRC Operating License

No. DPR-57 and License NPF-5 at Hatch I and 2 and to the discussions of our

findings held with Mr. A. W. Benson at the conclusion of the inspection.

The area examined during this inspection was your program for safeguarding

special nuclear material under the applicable provisions of Title 10, Code

of Federal Regulations, Part 73, " Physical Protection of Plants and

Materials." Within this area, the inspection consisted of selective examina-

tions of procedures and representative records, interviews with personnel,

and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of thi's letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20

days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the

basis of which it is claimed that the information is proprietary, and should

be prepared so that proprietary information identified in the application is

contained in a separate part of the document.

If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document Room.

7904110013

-

.

'

..

.

Georgia Power Company

-2-

MAR 7

1979

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

Si

rely,

.

-

W

. B. Kdnnb, Chief

Safeguardd Branch

Enclosure:

Inspection Report Nos. 50-321/79-5

and 50-366/79-6

cc w/ encl:

Mr. C. E. Belflower

Site QA Supervisor

Plant E. I. Hatch

P. O. Box 442

Baxley, Georgia 31513

Mr. M. Manry, Plant Manager

Plant E. I. Hatch

P. O. Box 442

Baxley, Georgia 31513