ML19289E262
| ML19289E262 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 03/07/1979 |
| From: | Kenna W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML19289E259 | List: |
| References | |
| NUDOCS 7904110013 | |
| Download: ML19289E262 (2) | |
See also: IR 05000321/1979005
Text
e
e,
.
(g# 88%g
UNITED STATES
o
NUCtEAR REGULATORY COMMISSION
f,
,
o
REGloN il
I
E
101 MARIETTA STREET, N.W.
- 'E
o
%...../
In Reply Refer To:
RII:JMF
50-321/79-5
50-366/79-6
Georgia Power Company
Atta:
Mr. J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street, N.W.
Atlanta, Georgia 30303
Gentlemen:
This refers to the inspection conducted by Mr. J. M. Fuchko of this office
on February 9, 1979, of activities authorized by NRC Operating License
No. DPR-57 and License NPF-5 at Hatch I and 2 and to the discussions of our
findings held with Mr. A. W. Benson at the conclusion of the inspection.
The area examined during this inspection was your program for safeguarding
special nuclear material under the applicable provisions of Title 10, Code
of Federal Regulations, Part 73, " Physical Protection of Plants and
Materials." Within this area, the inspection consisted of selective examina-
tions of procedures and representative records, interviews with personnel,
and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of thi's letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20
days to this office to withhold such information from public disclosure.
Any such application must include a full statement of the reasons on the
basis of which it is claimed that the information is proprietary, and should
be prepared so that proprietary information identified in the application is
contained in a separate part of the document.
If we do not hear from you in
this regard within the specified period, the report will be placed in the
Public Document Room.
7904110013
-
.
'
..
.
Georgia Power Company
-2-
MAR 7
1979
Should you have any questions concerning this letter, we will be glad
to discuss them with you.
Si
rely,
.
-
W
. B. Kdnnb, Chief
Safeguardd Branch
Enclosure:
Inspection Report Nos. 50-321/79-5
and 50-366/79-6
cc w/ encl:
Mr. C. E. Belflower
Site QA Supervisor
Plant E. I. Hatch
P. O. Box 442
Baxley, Georgia 31513
Mr. M. Manry, Plant Manager
Plant E. I. Hatch
P. O. Box 442
Baxley, Georgia 31513