Text
MTHELTRANSMITTED EIEY.'ml
.
. .
pa pac
N
D
T
"
(o
NUCLEAR REGULATORY COMMISSION
g
[
w
o
REGloN 11
M(
5
-g
101 MARIETTA STREET, N.W.
8
ATLANTA, GEORGI A 30303
'
4
%./
.....
In Reply Refer To:
0EC
6 1978
RII:JMF
50-321/78-38
50-366/78-46
Georgia Power Company
,
ATTN:
Mr. J. H. Miller, Jr.
Executive Vice Fresident
270 Peachtree Street, N.W.
Atlanta, Georgia 30303
Gentlemen:
This refers to the inspection conducted by Mr. J. M. Fuchko of this
office on November 15-17, 1978 of activities authorized by NRC License
Nos. DPR-57 and NPF-5 at Hatch 1 and 2 and to the discussion of our
findings held with Mr. M. Manry at the conclusion of the inspection.
The area examined during this inspection was your program for safe-
raarling special nuclear material under the applicable provisions of
'12tle 10, Code of Federal Regulations, Part 73, ' Physical Protection of
Plants and Materials." Within this area, the inspection consisted of
selective examinations of procedures and representative records, inter-
views with personnel, and observations by the inspectors.
We have examined actions you have taken with regard to previously
identified enforcement matters. These are discussed in the enclosed
ing _ction report.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. This item
and references to pertinent requirements are listed in the Notice of
Violation enclosed herewith as Appendix A.
This notice is sent to you
pursuant to the previsions of Section 2.201 of the NRC's " Rules of
Practice," Part 2. Title 10, Code of Federal Regulations. Section 2.201
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by you and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved. Details of
activities involving safeguards and security measures are exempt from
disclosure in accordance with 10 CFR 2.790(d). Therefore, your response
should be incorporated in a separate paper and referenced in your reply.
In accordance with Section 2.790(d) of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, activities involving
safeguards and security measures are exempt from public disclosure;
790129016'l
- MLinAnswa natwn
car y
e,
..
.
,.
MATG1ALTRANSMtTTED HDEWITH
CONTAINS 2.790 INFORMATION
Gecrgia Power Company
-2-
O[C
6 jgf8
therefore, the enclosures to this letter with the exception of the
report cover page, which is an inspection summary, will not be placed in
the Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
-
.
t
11iam B. Kenna, Chief
Safeguards Branch
Enclosures:
1.
Appendix A, Not. ice of Violation
(Exempt from Disclosure)
2.
Inspection Report Nos. 50-321/78-38 and
50-366/78-46 (Exempt from Disclosure)
3.
Inspection Summary
(Not Exempt)
cc:
Mr. M. Manry, Plant Manager
Plant E. I. Ifatch
Post Office Box 442
Baxley, Georgia 31513
Mr. C. E. Belflower
Site QA Supervisor
Plant E. I. llatch
Post Office Box 442
Baxley, Georgia 31513
&
MATERL'1L TRANSMTTTED HGEWiid