ML19289D042

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-321/78-38 & 50-366/78-46 on 781115-17.Notice of Violation Withheld (Ref 10CFR2.790)
ML19289D042
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/06/1978
From: Kenna W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19063C771 List:
References
NUDOCS 7901290167
Download: ML19289D042 (2)


See also: IR 05000321/1978038

Text

MTHELTRANSMITTED EIEY.'ml

.

. .

pa pac

N

D

T

"

(o

NUCLEAR REGULATORY COMMISSION

g

[

w

o

REGloN 11

M(

5

-g

101 MARIETTA STREET, N.W.

8

ATLANTA, GEORGI A 30303

'

4

%./

.....

In Reply Refer To:

0EC

6 1978

RII:JMF

50-321/78-38

50-366/78-46

Georgia Power Company

,

ATTN:

Mr. J. H. Miller, Jr.

Executive Vice Fresident

270 Peachtree Street, N.W.

Atlanta, Georgia 30303

Gentlemen:

This refers to the inspection conducted by Mr. J. M. Fuchko of this

office on November 15-17, 1978 of activities authorized by NRC License

Nos. DPR-57 and NPF-5 at Hatch 1 and 2 and to the discussion of our

findings held with Mr. M. Manry at the conclusion of the inspection.

The area examined during this inspection was your program for safe-

raarling special nuclear material under the applicable provisions of

'12tle 10, Code of Federal Regulations, Part 73, ' Physical Protection of

Plants and Materials." Within this area, the inspection consisted of

selective examinations of procedures and representative records, inter-

views with personnel, and observations by the inspectors.

We have examined actions you have taken with regard to previously

identified enforcement matters. These are discussed in the enclosed

ing _ction report.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements. This item

and references to pertinent requirements are listed in the Notice of

Violation enclosed herewith as Appendix A.

This notice is sent to you

pursuant to the previsions of Section 2.201 of the NRC's " Rules of

Practice," Part 2. Title 10, Code of Federal Regulations. Section 2.201

requires you to submit to this office, within 20 days of your receipt of

this notice, a written statement or explanation in reply including:

(1)

corrective steps which have been taken by you and the results achieved;

(2) corrective steps which will be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved. Details of

activities involving safeguards and security measures are exempt from

disclosure in accordance with 10 CFR 2.790(d). Therefore, your response

should be incorporated in a separate paper and referenced in your reply.

In accordance with Section 2.790(d) of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, activities involving

safeguards and security measures are exempt from public disclosure;

790129016'l

  • MLinAnswa natwn

car y

e,

..

.

,.

MATG1ALTRANSMtTTED HDEWITH

CONTAINS 2.790 INFORMATION

Gecrgia Power Company

-2-

O[C

6 jgf8

therefore, the enclosures to this letter with the exception of the

report cover page, which is an inspection summary, will not be placed in

the Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

-

.

t

11iam B. Kenna, Chief

Safeguards Branch

Enclosures:

1.

Appendix A, Not. ice of Violation

(Exempt from Disclosure)

2.

Inspection Report Nos. 50-321/78-38 and

50-366/78-46 (Exempt from Disclosure)

3.

Inspection Summary

(Not Exempt)

cc:

Mr. M. Manry, Plant Manager

Plant E. I. Ifatch

Post Office Box 442

Baxley, Georgia 31513

Mr. C. E. Belflower

Site QA Supervisor

Plant E. I. llatch

Post Office Box 442

Baxley, Georgia 31513

&

MATERL'1L TRANSMTTTED HGEWiid

CONTAINS 2.790 IMf0RMAil0N