ML19282C279

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-409/79-02 on 790122-26 & Notice of Violation
ML19282C279
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 02/15/1979
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Linder F
DUKE POWER CO.
Shared Package
ML19282C280 List:
References
NUDOCS 7903220474
Download: ML19282C279 (2)


See also: IR 05000409/1979002

Text

T

/ "%,k

UNITED STATES

/

NUCLEAR REGULATORY COMMISSION

[l

j

PEGloN W

C

799 RooSE VE LT ROAD

g

G L E N E LLYN, ILLINots 60137

6 y

  • ...*

FEB 15 J79

Docket No. 50-409

Dairyland Power Cooperative

ATTN:

Mr. F. W. Linder

General Manager

2615 East Avenue - South

La Crosse, WI

54601

Gentlemen:

This refers to the inspection conducted by Mr. K. R. Ridgway of

this office on January 22-26, 1979, of activities at La Crosse

Boiling Water Reactor authorized by NRC Provisional Operating

License No. DPR-45 and to the discussion of our findings with

Mr. Shimshak and members of the staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

During this inspection, certain of your activities appeared

to be in noncompliance with NRC requirements, as described

in the enclosed Appendix A.

This notice is sent t. you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations. Section 2.201 requires you

to submit to this office within twenty days of your receipt

of this notice a written statement or explanation in reply,

including for each item of noncompliance: (1) corrective

action taken and the results achieved; (2) corrective action

to be taken to avoid further noncompliance; and (3) the date

when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations, a

copy of this letter, the enclosures, and your response to

this letter will be placed in the NRC's Public Document Room,

except as follows. If the enclosures contain infor=ation

7 9 0 3 2 2 0 47f

.

.

Cairyland Power

- 2-

FE819 j/!

Cooperative

that you or your contractors believe to be proprietary, you

must apply in writing to this office, within twenty days of

your receipt of this letter, to withhold such information

from public disclosure. The application must include a full

statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary

information identified in the application is contained in an

enclosure to the application.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

e tM

R. F. Heishman, Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

1.

Appendix A, hotice

of Violation

2.

IE Inspection Rpt No.

50-409/79-02

cc w/encls:

Mr. R. E. Shimshak, Plant

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Anthony Roisman, Esq.,

Attorney