Forwards IE Insp Rept 50-341/79-03 on 790124-26 & Notice of Violation
ML19281A633
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 02/14/1979
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
Shared Package
ML19281A634 List:
References
NUDOCS 7903260116
Download: ML19281A633 (2)


See also: IR 05000341/1979003

Text

T

'

.

-

4

4

UNITED STATES

t

NUCLEAR REGULATORY COMMISSION

,

f 'l )).7 ) fj

,

REGloN lli

-

y

g* g.rry&

= aoose m 'aoao

G LE N E LLYN. IL LINots 60137

<,

.....

FEB 14 R9

Docket No. 50-341

The Detroit Edison Company

ATTN:

Mr. Edward Hines, Assistant

Vice President and Manager

Quality Assurance

2000 Second Avenue

Detroit, MI 48226

Gentlemen:

This refers to the inspection conducted by Messrs. K. R. Naidu,

J. F. Suermann, and I. T. Yin of this office on January 24-26,

1979, of activities at Enrico Fermi 2 authorized by NRC Construction

Permit No. CPPR-87 and to the discussion of our findings with Messrs.

W. F. Colbert, T. A. Alessi, and H. A. Walker and others of the

Fermi 2 project staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

During this inspection, certain of your activities appeared

to be in noncompliance with NRC requirements, as described

in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations.

Section 2.201 requires you

to submit to this office within thirty days of your receipt

of this notice a written statement or explanation in reply,

including for each item of noncompliance: (1) corrective

action taken and the results achieved; (2) corrective action

to be taken to avoid further noncompliance; and (3) the date

when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's "Bules of

Practice," Part 2, Title 10, Code of Federal Regulations, a

copy of this letter, the enclosures, and your response to

this letter will be placed in the NRC's Public Document Room,

790326oI/4

'

.

_

.

The Detroit Edison

-2-

Company

FEB 1<3 .379

except as follows.

If the enclosures contain information

that you or your contractors believe to be proprietary, you

must apply in writing to this office, within twenty days of

your receipt of this letter, to withhold such information

from public disclosure.

The application must include a full

statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary

information identified in the application is contained in an

enclosure to the application.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

,

R. F. Heishman, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-341/79-03

cc w/ encl:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

i4 SIC

IIC

Ronald Callen, Michigan Public

Service Commission

Eugene B. Thomas, Attorney