ML19281A043
| ML19281A043 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 04/08/2019 |
| From: | Exelon Generation Co |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19281A037 | List: |
| References | |
| Download: ML19281A043 (10) | |
Text
PBAPS UFSAR Figure 9.2.1A thru 9.2.4a Deleted
PBAPS UFSAR Figure 9.2.4c Deleted
0 Security Related Information Withheld Under 10 CFR 2.390
Security Related Information Withheld Under 10 CFR 2.390
Security Related Information Withheld Under 10 CFR 2.390
r-r<OM
\\VA~T eo
~M PL.E PUMP!:>
TO 10 FLOOR O~"'IN WASTE
...-_~~COl..Lec.iO~
COLlE~TO~
lAN~
TANK
~E:FU~LING VAiei:
c;'OAAGe TANI'.
4~,OOO GAL TO FL.OOR OR~ltJ
~;SiTO~-"'--_.....-......
f?OOGPM
!ACH iOUNIT ~
HOT1{eLL bUNIT tz CON,~Ol
~---'
ROO t)R",'e PUMPS
'CONOE"'l';'TE:
'2.....~,.f:1l-
. PUMPe, ('1)
~-"'-"9 ooc "M EACH
~_--._~ To U~ JT ~ HOT\\Ve1.1.
...-.-~-ro UNIT
~
COWTROL ROO O~'VE PUMPS.
-~UNli'2 F'L~Nr U~A61!'
,,-~u~JT~
SOGf'M CONoeN~Te TEZAN4Pf:1Z PUMP PECO DEROY COWPANY PEACH BOnOM ATOMIC POWER STATION UNITS 2 AND3 UPDATED FINAL SAFETY ANALYSIS REPORT CONDENSATE AND REFUELING WATER STORAGE SYSTEMS FIGURE 9.2.6 REV. 14 05/97
NOTE5:
- PROCESS SYSTEM BEING COOLED \\5 RADIOACTNE OR POTEN11ALl'( RI\\O\\OAC1\\VE.
- LOCA"TED ABOVE FUEL POOL TO INSURE R\\VER WATER 15 AT A HfG~ER PRESSURE.
RECIRC PUMP M-G SET LUBE OIL.
COOLE.RS (2)
REACTOR BUILDING COOLING WATER HEAT EXCHS.(2.).
,t TO EMERGE.WCY SERVICE WATER SYSTEM FROM EMERGENCY SERVICE WA.TER SYSTEM FUEL POOL COOLING HT. EXCHs(3)*
950 G P M E.~CH
....---....(-9
- FUE.L POOL SE.RVICE WATER BOOSTER PUMPS(3)
MECH.
VAC. PUMP HT. E~C.H.{l) '*
TURB. BLDG.
COOL. WATER HT. EXCHS. (2)
DRYWELL CHILLERS (g)
CONTROL ROOM CHILLERS (2)
TURBINE HYDRAULIC FLUID COOLEI\\S (2.)
TURBINE LUB.
OlL COOLER5(2)
A SIMILAR SYSTEM 5ERVE.5UNIT 3.
CONDo PUMP ROOM COOLER (4)
CONDE.NSER COMPARTMENT COOLERS (8)
ISOPHASE. BUS AREA COOLERS (2)
ALTERRE><-
AIR COOLE.RS (2.)--
HYDROGEN COOLERS (4-)
R.F. P.
R.F.P.
L. O. COOL.ERS ROOM (6)
COOLERS (6)
,.0 ClRC.ULA.TING WATER O\\SCHA.RGE SERVICE WATER PUMPS (3) 13}000 GPM E.ACH
~.
STORM DRAIN ADMIN.
BLDG.
Ale UNIT CLARIFIER
,r CHLORINATION SYSTE.M PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 UPDATED FINAL SAFETY ANALYSIS REPORT UNIT 2 SERVICE WATER SYSTEM FIGURE 9.2.7
UNIT
'2 REACTOR BLG.
COOLING WATER HEkT E~CHA.NGERS(2)*
UNIT 3
REACTOR BLG.
COOLING WATER HEJ..T E'1..CHA.N6ERSl'2)*
RE§~
10 C1RCUL-,T1NG WATER DISCHARGE R.H.R.
HEAT
"-~---t EXC HANGERS (TOr AL~)*
R.C.I.e. PUMP ROOM LJNIT COOLE.RS (2)
H.P.C.I.
PU MP ROOM UNIT COOLE.RS(2 CORE. SPRAY PUMP RM.
UNIT COOLERS (8)
DiESEL GENERATOR HEAT EXCHANGERS (4)
R.C.I.C. PUMP ROOM UNIT COOL ERS(2.)
H.P.C.1.
PUMP ROOM UNIT COOLERS(2).......-.-.----I CORE SPRAY PUMP RM.
UNIT COOLERS(8)
R.H.R.
HEAT EXCHANGERS (TOTAL*~.
R.H.R. PUMP ROOM UNIT COOLERS(8)
R.H.R.
PUMP ROOM UNIT COOLE.RS(8)
NCTES:
"*.. RiVER WATER MAlNTAINED AT A Hl'HER PRESSURE THkN
'PROCESS W~TER COMMON EMERGENCY SERVICE WATER AND HIGH PRESSURE SERVICE WATER SYSTEMS PEeo ENERGY COMPANY PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 UPDATED FINAL SAFETY ANALYSIS REPORT if PROCESS SYSTE.M BEING C~QLED \\5 Rk010ACTIVE OR P01ENT1ALLY RkDIO"CTIVE 4500 GPM E.A~H (2.)
HIGH PRESSURE SERVICE WATER PUMPS (TOTAL 4)
UNIT '3 R.H.R.
PUMP SEAL WATER COOLER(4-).
8000 GPM EACH EMERGENCY SERVICE WATER PUMPS (2.)
R.H.R.
PUMP SEAL WATER COOLER(+).
(2)
HIGH PRESSURE.
SE.RVICE WATER PUMPS (TOTAL +)
UNIT 2
4500 GPM EACH FIGURE 9.2.8 Rev.15 04/98