ML19280B559

From kanterella
Jump to navigation Jump to search
Forwards Rept, Adequacy of IE Investigation 50-358/80-09 at William H Zimmer Nuclear Power Station. Inquiry Was Conducted Per Chairman Ahearne 801215 Memo to Determine If IE Conducted Adequate Investigation of All Allegations
ML19280B559
Person / Time
Site: Zimmer
Issue date: 08/07/1981
From: Jamarl Cummings
NRC OFFICE OF INSPECTOR & AUDITOR (OIA)
To: Bradford P, Gilinsky V, Palladino N
NRC COMMISSION (OCM)
Shared Package
ML19280B555 List:
References
NUDOCS 8112080201
Download: ML19280B559 (2)


See also: IR 05000358/1980009

Text

.v-

-

.

!(f **%,je,

.

UNITED STATES

,

) .,.q

i

NUCLEAR REGULATORY COMMISSION

h, ;i M

.; I

WASHINGTON, D. C. 20555

1,xp ?

\\;%4i

%."

AUS

7 1981

MEMORANDUM FOR: Chaiman Palladino

Comissicner Gilinsky

Comissiener Bradf:rd

Comissioner Ahearne

Comissicner RcDerts

games J. Cu:xaings, Direct:rrj/g/

b

i

V

FROM:

Of ' ice of Inspector and Aveiter

,/

SU5 JECT:

ADEQUACY OF IE INVESTIGATIOft 50-358/20-09 AT THE

WILLIAM H. IIMMET !hjCLEAR POWER STATION

Attached please find cur re:: ort entitled, " Adequacy of IE Investigatien

50-358/50-09 at the William B Zimmer Nuclear Power Station" cated

July 30, 19S1. This inquiry was c:nducted pursuant to a December 15, 1980,

memorancum from fomer Chaiman Ahearne directing that the Office of

Inspector and Audi:cr (OIA) determine whether the Office of Inspection

anc Enf rcement (IE) had conducted an adequate investigation of the

allegations of Mr. Thomas *pplegate recarding ectivities at the Zimmer

Euclear pcwer Statien.

CIA's Overall finding is that the IE investigation Of Applegate's

allegations, IE Report 50-358/S0-09, was unsatisfactory.

Our finding is

basec :n the fcilowing:

The investigatien failed to prcperly document the results Of

.

investigatien both as to interviews and material reviewed.

The investigation failed to detemine the correct status and

.

histcry Of several welds.

The overali investigative effort was neither vigcrcus nor sufficiently

.

bread in sccpe.

The findin: Of "not substantiated" with regard to the allecation

.

that defective welcs in safety-related systems had been accepted is

not censistent with the facts.

In evaluating the sufficiency cf the IE investigatien in this instance

CIA mace a c nscious effort to temper our evaluation process with the

very cbvicus fact that few investigations can successfully withstand the

..

__

8122080203 811126

IE

ADDCK 05000358

CF

w -

~

.

8

Commission

-2-

.

"

criticism of a Monday morning quarterback, unfortunately, we still

conclude that the overall investigative effort in this instance was

unsatisfactory.

In our opinion responsibility for this situation must

be shared not only by the individuals wi'o were specifically assigned to

the case but also by regional officials who failed to properly supervise

the case.

No specific corrective recommendations are being made by OI A at this

time because we are hesitant to conclude that the overall IE investiga-

tive program is deficient based on this instance. A more extensive

review of the IE investigative program is planned for the near future,

after wnich we will determine if corrective recommencations are warranted.