ML19276H169
| ML19276H169 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 08/02/1976 |
| From: | Nelson P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Arnold R METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19276H166 | List: |
| References | |
| NUDOCS 7910150295 | |
| Download: ML19276H169 (2) | |
See also: IR 05000289/1976016
Text
i ..
.
.. ,
.
g#
I
UNITED STATES
4
6,,
NUCLEAR REGULATORY COMMISSION
$ !}{,C[jf), &
.
y
!
ntciou i
!
(
[
633 PAnK AVENUE
'
.
f
'9
.: -
4
KING OF PR USSI A. PENNSYLVANI A 19406
g .' .v' /
pg. 2
W6
...
Metropolitan Edison Company
License No. DPR-50
Attention:
Mr. R. C. Arnold
Inspection No. 76-16
Vice President
Docket No. 50-289
P. O. Box 542
Reading, Pennsylvania 19603
,
.
!.
Gentlemen:
l
I
This refers to the inspection conducted by Mr. J. J. Kottan of this
1
office on July 13-16, 1976 at Three Mile Island Nuclear Power Station,
Middletcwn, Pennsylvania of activities authorized by NRC License No.
DPR-50 and to the discussions of our findings held by Mr. Kottan with
Mr. Colitz and others of your staff at the conclusion of the inspection.
i
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
,
!
letter. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
'
personnel, and observations by the inspector.
I
In addition our Mobile Laboratory was also brought to your site and used
by the inspector to make certain independent measurements.
The basic
il
purpose of these independent measurements is to verify your capability
,
for analyzing radioactive effluents, and to achieve and maintain compar-
able methods of analyses between your facility and the NRC.
The complete
data from these measurements will be reported in a subsequent Inspection
-
Report.
Based on the results of this inspection, it appears that one of your
3
activities was not conducted in full compliance with URC requirements,
',
as set forth in the Notice of Violation, enclosed herewith as Appendix
A.
This item of noncompliance has been categorized into the levels as
described in our correspondence to you dated December 31, 1974. This
notice is sent to you pursuant to the provisions of Section 2.201 of the
NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within twenty (20)
days of your receipt of this notice, a written statement or explanation
'
in reply including:
(1) corrective steps which have been taken by you
and the results achieved; (2) corrective eteps which will be taken to
avoid further items of noncompliance; and (3) the date when full compliance
will be achieved.
lAIS
130
95
)'t Q
4
7910150
- - _ _
._ .
. - - .
.-
.
..
.
.
--
. _ _ _ _ _
--
. - . . . - .
.-.
--
. - .
.
- .
.
<
-
-2-
,
I
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosures will be placed in the NRC's Public Document Room.
If this
i
report contains any information that you (or your contractor) believe to
be proprietary, it is necessary that you make a written application
within 20 /,ays to this office to withhold such information from public
disclosur2. Any such application must be accompanied by an affidavit
executed by the owner of the information, which identifies the document
or part sought to be withheld, and which contains a statement of reasons
which addresses with specificity the items which will be considered by
-
'
the Commission as listed in subparagraph (b)(4) of Section 2.790.
The
information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from
you in this regard within the specified period, the report will be
placed in the Public Document Room.
,
l'
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
,
8
~
,
r
t)
.
~
Paul R. Nelson, Chief
Fuel Facility and Materials Safety
Branch
i
Enclosures:
]
1.
Appendix A, Notice of Violation
j
2.
IE Inspection Report No. 76-16
cc:
J. G. Herbein, Manager, Generation Operations - Nuclear
,
R. W. Heward, Project Manager, GPUSC
Miss Mary V. Southard, Chairman, Citizens for a Safe Environment
(Without Report)
i
9
1413
131
. - ..
.-
_ . - .
-.
-
..
..
_. .
-
.. -