ML19276G654
| ML19276G654 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 03/21/1979 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML19276G652 | List: |
| References | |
| NUDOCS 7908020088 | |
| Download: ML19276G654 (2) | |
See also: IR 05000245/1979002
Text
f' " %
U:::Tro r.T4.Tt:;
.7
NUCLEAR REGULATORY COMMisslON
. . .
[ s,',.
$.),S,
REGION I
,
.
ssicantAvenue
.
',,g 5
xmc or caussm. PENNS%VAM A T HH
,
.....
Docket Nos. 50-245
50-336
Northeast Nuclear Energy Company
ATTN.
Mr. W. G. Counsil
Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut
06101
Gentlemen:
Subject:
Inspection 245/79-02; 336/79-01
This refers to the inspection conducted by Mr. Shedlosky of this office
on January 6,1979 - February 9,1979 at the Millstone Nuclear Station
Waterford, CT of activities authorized by NRC License Nos. DPR-21 and
DPR-65 and to the discussions of our findings held by Mr. Shedlosky with
Mr. Opeka at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter.
Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Based on the results of this inspection, it appears that one of your
activities was not conducted in full compliance with NRC requirements,
as set forth in the Notice of Violation, enclosed herewith as Appendix
A.
This item of noncompliance has been categorized into the levels as
described in our correspondence to you dated December 31, 1974.
This
notice is sent to you pursuant to the provisions of Section 2.201 of the
NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within twenty (20)
days of your receipt of this notice, a written statement or explanation
in reply including:
(1) corrective steps which have been taken by you
and the results achieved; (2) corrective steps which will be taken to
avoid further items of noncompliance; and (3) the date when full compliance
will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosures will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to
7908020@S
.
-
.
flortheast fluclear Energy Company
2
02 ti El9
be proprietary, it is necessary that you make a written application
within 20 days to this office to withhold such information from public
disclosure. Any such application must be accompanied by an affidavit
executed by the owner of the information, which identifies the document
or part sought to be withheld, and which contains a statement of reasons
which addresses with specificity the items which will be considered by
the Commission as listed in subparagraph (b) (4) of Section 2.790.
The
information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified period, the report will be placed in
the Public Document Room.
" Rules of Practice," Part 2, Title 10, Code of Federal Regulations,
specifies that documentation of findings of your control and accounting
procedures for safeguarding special nuclear materials and your facility
security procedures are exempt from disclosure; therefore, the pertinent
section of the inspection report and Appendix A, will not be placed in
the Public Document Room and will receive limited distribution.
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
(
_-
-
-
E de J. Brunner, Chief
Reactor Operations and Nuclear
Support Branch
Enclosures:
1. Appendix A, Notice of Violation (Contains 2.790 Information)
2. Office of Inspection and Enforcement Inspection
Report Numbers 50-245/79-02, 50-336/79-01
cc w/ encl:
J. F. Opeka, Station Superintendent (Without Appendix A and pages
18,19, 20, 21, and 22 of report)*
D. G. Diedrick, fianager of Quality Assurance (Without Appendix A and
pages 18,19, 20, 21, and 22 of report)*
J. R. Himmelwright, Licensing Safeguards Engineer (Without Appendix A
and pages 18,19, 20, 21, and 22, of report)*
A. Z. Roisman, Natural Resources Defense Council (Without Report and
Appendix A)