Forwards IE Insp Repts 50-369/78-44 & 50-370/78-18 on 781227-29 & Notice of Violation
ML19276E614
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 01/23/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19276E602 List:
References
NUDOCS 7903200060
Download: ML19276E614 (2)


See also: IR 05000369/1978044

Text

. .

.

p* "Geq

UNITED STATES

jo,,

NUCLEAR REGULATORY COMMISSION

[

'

.$

101 M ARIETTA STRE ET. N.W.

o

REGloN 11

5

'

'

ATLANTA, oEORGI A 30303

o,s,...../

JAN 2 31979

In Reply Refer To:

RII:WPA

50-369/78-44

50-370/78-18

Duke Power Company

Atto: Mr. William O. Parker, Jr.

Vice President, Steam Production

P. O. Box 33189

422 South Church Street

Charlotte, North Carolina

28242

Gentlemen:

This refers to the inspection conducted by Mr. W. P. Ang of this office on

December 27-29, 1978, of activities authorized by NRC Construction Permit

Nos. CPPR-83 and CPPR-84 for the McGuire Unit I and 2 facilities, and to

the discussion of our findings held with Mr. G. Grier at the conclusion of

the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted

of selective examinations of procedures and representative records, inter-

views with personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements. This item and

references to pertinent requirements are listed in the Notice of Violation

enclosed herewith as Appendix A.

This notice is sent to you pursuant to

the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations.

Section 2.201 requires you to

submit to this office, within 20 days of your receipt of this notice, a

written statement or explanation in reply including:

(1) corrective steps

which have been taken by you and the results achieved; (2) corrective steps

which will be taken to avoid further noncompliance; and (3) the date when

full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If

f

this report contains any information that you (or your contractor) believe

to be proprietary, it is necessary that you make a written application

7903200 6(oo

, . .

.

JAN 2 31979

.

Duke Power Company

-2-

within 20 days to this office to withhold such information from public

disclosure.

Any such application must include a full statement of the

reasons on the basis of which it is claimed that the information is

proprietary, and should be prepared so that proprietary information

identified in the application is contained in a separate part of the

document.

If we do not hear from you in this regard within the specified

period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

'

.: z

0

i

C. E. Murphy, Chie

Reactor Construction and

Engineering Support Branch

Enclosures:

1. Appendix A, Notice of Violation

2. Inspection Report Nos. 50-369/78-44

and 50-370/78-18

cc w/ enc 1:

Mr. M. D. McIntosh, Plant Manager

McGuire Nuclear Station

P. O. Box 488

Cornelius, North Carolina

28031

Mr. J. C. Rogers, Project Manager

McGuire Nuclear Station

P. O. Box 33189

Charlotte, North Carolina

28242