Safety Evaluation Re Steam Generator Water Hammer.Finds Existing Preventive Measures Are Adequate
ML19276E460
Person / Time
Site: Beaver Valley
Issue date: 02/12/1979
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19276E459 List:
References
TAC-7313, NUDOCS 7903140190
Download: ML19276E460 (17)


Text

....... _.. -

' '~

e SAFETY EVALUATION REPORT STEAM GENERATOR WATER HAMMER BEAVER VALLEY POWER STATION UNIT NO. i FEBRUARY 12, 1979 7903140190

1.0 IPTRODUCTION Steam generator water hammer has occurred in certain nuclear power plants as a result of the rapid condensation of steam in a steam generator feedwater line and the consequent acceleration of a slug of water which upon impact within the piping system causes undue stresses in the piping and its support system. The significance of these events varies from plant to plant.

Since the total loss of feedwater could affect the ability of the plant to cool down after a reactor shutdown, the NRC is concerned about these events occurring, even though an event with potentially serious consequences is unlikely to happen.

Because of the continuing occurrence of water hammer events, the NRC, in Septembcr 1977, informed all PWR licensees that water hammer events due to the rapid condensation of steam in tne feedwater lines of steam generators represented a safety concern and that further actions by licensees for Westinghouse and Combustion Engineering designed nuclear steam supoly systems are warranted to assure that an acceptably icw risk to public safety due to such events is maintained.

Accordingly, these licensees were requested to submit proposed hardware and/or procedural modifications, if any, which would be necessary to assure that the feedwater lines and feedrings remain filled with water during nonnal as well as transient operating conditions.

At the same time, the NRC provided each PWR licensee with a copy of its consultant's report, "An Evaluation of PWR Steam Generator Water Hamer," NUREG-0291.

The feedwater system and steam generator at the Beaver Valley Power Station, Unit No.1 (BVPS-1) were designed and built with provisions to preclude the potential for' steam generator water hamer.

The feedwater pipi~ng has loop seals or inverted U-tubes, the steam generator feedrings discharge through J-tubes on the top of the feedwater sparger, auxiliary feedwater flow is automatically initiated and as a result of the NRC review of the BVPS-l'for an operating license, a licensing condition was imposed limiting the flow of auxiliary feedwater in the event that a feedwater line might contain steam.

2.0 EVALUATION Our censultant, EG&G Idaho Inc., precared the enclosed evaluation of steam generator water haraner at SVPS-1 as part of cur technical assistance' program. We have reviewed this report together with the licensee's submittals listed under item 4.0.

3.0 CONCLUSION

Based en our knowledge of water hammcr phencmena, and cur review of the licensees responses and the enclosed evaluation recort, we concur with our censultants ccnclusion that the existing means A

for reducing the potential for steam generator water hammer at this facility are adequate.

These means are, therefore, acceptable to the staff and no further action is required of the licensee with regard to steam generator water hanner.

4.0 5FERENCES 1.

Letter frem E. J. Woolever to A. Giambusso, Subject -

" Steam Generator Secondary System Fluid Flcw Instability", July 9,1975.

2.

Letter from C. N. Dunn to R. W. Reid, Subject -

" Response to September 2,1977 NRC letter on Feedwater Water Harmer", January 25, 1978.

.1 TECHf1ICAL EVALUATI0t!

BEAVER VALLEY POWER STATIO.'l DECEMBER 1978 EG&G IDAHO, IllC.

- - - = = = - - -.. - -.

.i CONTENTS I.

INTRODUCTICN.

I II.

FEECWATER SYSTEM.....

2 2

1.

DESCRIPTION.

3 2.

GENERAL OPERATICN.

III. MEANS TO RECUCE THE POTENTIAL FOR WATER HAMMER.

5 1.

DESCRIPTION.

5 2.

EFFECTI'JENESS DURING TRANSIENTS CONDUCIVE TO WATER HAMMER...................... 6 2.1 Reactor Trip.

6 2.2 Loss of Main Feedwater Pumps...

7 2.3 Loss of Off-Site Power.

7

2. 4 Operator Error.

8

2. 5 Steam Line Break.

9 2.6 Loss-of-Coolant Accident.

9 IV.

CONCLUSIONS............

11 V.

REFERENCES..

12 e.---

=

I.

INTRODUCTION A safety evaluation was performed for the Seaver Valley Power Station (SVPS) feedwater system.

This evaluation was concerned with the effectiveness of the means to reduce the potential for water hammer in the feedwater system during normal and hypothesized operating canditions.

Although a steam generator water hammer e/ent has not been experi-enced to date at the SVPS, additional means were imulemented to further limit the potential for water hammer at this facility.

These means were adopted based on a review of events that occurred at several other facilities.

Since the rapid condensation of steam in the feedwater system can be avoided by keepir.g it full of water, this evaluation was based on the effectiveness of the modifications to maintain the feedwater system full of water during normal and transient cperations.

The information for this review was obtained from the licensee, from its submittals of Ell July 9, 1975 and January 25,1978[2], and from the Beaver Valley Power Station Final Safety Analysis Report [3]

A description of the feedwater system at the SVPS and its general operation during a transient are presented in Section II.

The modifi-cations *to raduce the potential for water hammer and a general ciscussion of the effectiveness of these modifications during transients conducive to water hammer are presented in Section III.

Finally, conclusions are presented in Section IV concerning the acceptability of the modifications

  • Note added by NRC:

Refers to design changes incorporated in the construction of Beaver Valley Pcwer Station, Unit No.1 prior to the issuance of the operating license.

II.

FEEDWATER SYSTEM 1.

DESCRIPTION The feedwater system for the BVPS was designed to provide an adequate supply of feedwater to the secondary side of the three steam generators under all load conditions.

Two half-size steam generator feedwater pumps, each rated at a flow rate of 15,200 gpm and 1900 feet total developed head (TCH), supply main feedwater to the three steam generators.

Each feedwater pump is equipped with two 4000 hp electric motors connected in tandem.

The pumps receive water from a ccamon header supplied by the condensate pumps via the low pressure feedwater heaters.

Feedwater from the main feedwater pumps is supplied to a main header via the high pressure heaters.

The main header splits in,to three 16" lines with individual feecwater regulating valves.

Each feecwater line supplies water to a feedwater ring inside of each steam generater.

Water is discharged from the top of the feedring via inverted "J" tuces which direct the flow downward.

The auxiliary feecwater system supplies water to the steam generators for ccoling the reactor after shutdcwn.

Auxiliary feecwater can ce supplied to the steam generators by two independent pumping systems consisting of two electric motor driven and one turbine driven auxiliary feedwater pumps.

The two motor driven pumps, each rated at 350 gpm and 2696 ft. TDH, operate with normal off-site pcwer or pcwer secolied by the emergency diesel generators.

The turbine driven pump, rated at 700 gpm and 2596 ft. TOH, is driven by steam supplied frem each steam generator outlet header.

The auxiliary feedwater pumps are supplied with water frca the 140,000 gallon primary plant cemineralizec ater storage tanks.

The backup water source is supolied by the river water

pumps or the engine driven fire pumps which all take suction from one of the river water system headers.

Redundant lines carry water from the auxiliary feedwater pumps and connect to each of the three main feecwater lines just outside of the containment building.

2.

GENERAL OPERATION Ouring normal operation, the main feedwater system su::clies feedwater to the three steam generators for heat removal from the primary system.

This flow can be interrupted by the loss of of"-site power or by a manual action or an automatic system protective action (such as a safety injection signal), all of which cause the main feedwater pump breakers to open.

Depending upon the type and extent of such an action, closure of the main feedwater isolation, bypass, and control valves can also occur as a result of the opening of the main feedwater pump breakers.

Complete isolation of the main feedwater system is initiated by (1) a reactor trip in coincidence with two out of three low primary coolant average temperature (Tave) signals in de water re W ng kom any one stean; gene ator, (2) twc out of three high-high steam generator levels in any one steam generator, or (3) a safety injection signal.

The isolatic.n of the feedwater system serves the dual purpose of (1) limiting excess reactivity resulting from a 10wered T C"* t0 C0"tiU'*d f**C**t*"

we flow entering the steam generators following a reactor shutdown and

' (2) preventing further addition of steam to the containment building in the event of a steam line break.

The interruption of feedwater for an extended period wnile the feedring is uncovered can result in drainage of the feecrings and feec-piping.

Orainage of the feedrings and feedpiping rescits in acmission of steam which is conducive to slugging and sucsc<;uent water hammer when auxiliary feedwater flowing in the main feecwater ;iping enters the piping at the entrance to the steam generators.

Significant drainag.e is unlikely, however, due to installation of "J" tubes on the feedrings (described in a sucsequent section) and promot initiation of auxiliary

feedwater after main '.etdwater flow has been terminated.

Also, when the main feedwater control valve receives a cicsure signal, a significant amount of feedwater continues to enter the steam generators during the 15 second closure time of this valve.

This feedwater flow during valve closure keeps the feedring full ard contributes to the recovery of normal steam generator level.

The motor driven auxiliary feedwater pumps start on (1) two out of three steam generator low-low water level signals in ene steam generator, (2) the opening of the main feedwater pump breakers, or (3) a safety injection signal.

The turbine driven auxiliary feedwater pumo starts on (1) any steam generator low-low level signal or '(2) two out of three primary coolant pump low voltage signals.

The maximum hypothesized time delay from feedring uncovery to delivery of auxiliary feedwater to the steam generators is about 20 seconds.

This delay is based on a hyp -

thetical transient which isolates the main feedwater system and automati-cally initiates auxiliary feedwater flow upon receipt of one or more of the preceding auxiliary feedwater' pump start signals.

Automatic inter-ruption of auxiliary feedwater flow will result from a high-high steam generator level.

Normally, however, the automatically initiated auxiliary feedwater is manually controlled shortly after feedring uncovery occurs.

The auxiliary ficw is then regulated and adjusted to refill the steam generators and maintain the water levels above the feedrings.

.=-

III.

MEANS TO REDUCE THE POTENTIAL FOR WATER HAMMER 1.

DESCRIPTICN The following procedures and hardware are employed in the EVPS to reduce the potential for water hammer in the feedwater system:

1.

"U" shaped loops in the feedwater lines were installed at the entrance to the steam generators.

2.

"J" shaped tubes were installed on top of the feedrings and the bottom discharge holes were plugged.

3.

The auxiliary feedwater pumps autcmatically start within 20 seconds to supply auxiliary feecwater to the steam generators after the loss of the main feedwater pumps.

4.

Administrative control limits the feedwater flow tc an equiva-lent of 1.2 inches of steam generator secondary water level per minute within 2 minutes of determining that the level in any steam generator has been below the feedring.

The "U" shaped loops were installed in the feecwater lines with the first elbow of each loop connected to the steam generator no::le.

This loop " seal" reduces the length of feedpiping that coula fill with steam should feedring uncovery and substantial drainage occur.

Ey reducing this length of piping, the potential for water hammer is also reduced.

The "J" shaped tubes were installed on tcp of the feedrings to provide for top discharge of water frcm the feedrings rather than bottcm discharge.

This arrangement keeps the feedrings full mucn longer after feedring uncovery occurs.

Maintaining the feecrings and feecciping full of water while the feedrings are uncovered greatly reduces the potential for water hammer.

Under ccid c:ntitions an observer visually determinec that the feedring drainage time for an uncovered feecring was acout

2 1/2 hours.

It was assumed that the only leakage from the feedring occurred through the thermal expansion clearance between the feedring nozzle and the steam generator nozzle.

The prcmpt automatic start uc of the auxiliary feedwater pumps after the loss of the main feedwater pumps will insure sufficient flow to keep the feedrings and feedpiping full of water during feedring uncovery.

The auxiliary feecwater pumps are also used to recover the feedrings and maintain recovery under manual control.

The motor driven auxiliary feedwater pumps are backed up by the turbine driven auxiliary feedwater pump.

Both types of pumps have independent power supplies (Section II) to ensure that auxiliary feedwater is availabh during any transient which causes interruption of main feedwater flow.

Administrative control limits the equivalent feedwater ficw to 1.2 inches of steam generator level per minute (about 150 gpm) when the level is below the feedring.

The flow limit is in effect within 2 minutes of feedring uncovery and allcws time for the operater tc beccme aware of feedring uncovery and to manually reduce auxiliary feedwater from full flow to the administrative limit.

2.

EFFECTIVENESS DURING TRANSIENTS CONOUCIVE TO WATER HAMMER 2.1 Reactor Trio During normal operation the water level in the steam generator is maintained above the feedring and therefore steam cannot enter the feedring to react with cold feedwater.

After a reactor trip, however, the liquid levels in all steam generators " shrink" to a level belcw the feedrings.

Within 15 seconds after the resulting steam generator icw-icw level signals, the mater driven ano turoine ariven auxiliary feedwater pumps autcmatically start up to supply auxiliary feecwater to the steam generators.

The main feedwater system is isolated af ter a icw reactor T

signal or a steam generatcr high-hign level signal.

Auxiliary ave feedwater is normally under manual control within 2 minutes after feedring

uncovery.

The manually controlled flow is then maintained until feedring recovery occurs and subsequently adjusted to maintain the steam generator levels above the feedrings.

If the auxiliary flow is not manually reduced after its initiation, the auxiliary feedwater pumps will stcp upon receipt of _ a high-high steam generator level signal.

The potential for water hammer occurring in the feedring and feedwater piping after a reactor trip is very low because the main and auxiliary feedwater systems keep the feedrings and feecwater piping full of water while feedring recovery occurs.

2. 2 Loss of Main Feedwater Pumas Any event that causes the main feedwater pump breakers to cpen will result in automatic startup of the motor driven and possibly the turbine driven auxiliary feedwater pumps within 15 seconds after the breakers open.

The auxiliary feedwater is more than sufficient (even under manual control with the administrative ficw limit) to keep the feedrings and feedpiping liquid full while the steam generators refill and feedring recovery occurs.

The. loss of the main feedwater pumps would not result in drainage of the feedrings because auxiliary feedwater wculd be supplied to the feedrings and feecpiping before any significant drainage occurrec.

Therefore, the concitions necessary for water hammer are avoiced.

2.3 Loss of Off-Site Pcwer Loss of off-site power which sucplies the main feecwater pumes will cause the diesel generator to start autcmatically.

The diesel generator is the backup power source for the motor driven auxiliary feecwater pumps which start after the loss of the main feedwater pumps.

Within 20 seconds after the off site power loss, the motor criven and turoine driven auxiliary pumps will start uo to supply auxiliary feecwater to the steam generators.

The turbine criven ptmos are not decencent ucen AC electrical power since steam to drive the pumos is crawn frcm the

.e steam generator main steam lines and electrical controls are powered by the station batteries.

Auxiliary feedwater continues until tne feecrings are recovered and the steam generator levels are then maintained by manual auxiliary feedwater centrol.

As was the case for the loss of the main feedwater pumps, auxiliary feedwater maintains the feedrings and feedpiping full of water until feedring recovery occurs and again the conditions conducive to water hammer are avoided.

2. 4 Goerator Error The potential for water hammer in the feedwater system increases greatly if uncovered feedrings are allowed to drain suostantially after an event causes the steam. generator water levels to go below the feedrings.

Admission of feedwater into or recovery of the drained feedrings and feedoiping could then result in water slugging and subsequent water hammer.

After the uncovery of one or more feedrings, automatic auxiliary flow in conjunction with feedring "J" tubes greatly reduce the chance of substantial feedring drainage.

If the feedpiping and uncovered feedring were to inadvertently drain partially or completely, the potential for water slugging would be decreased by (1) the administrative flow limitatiam and (2) the U-shaped geccetry of the feedpiping at the entrance to the steam generators.

Administ'rative control limits the equivalent feedwater flow to 1.2 inches of steam generator level per minute (about 150 gpm) when the level is belcw the feedring.

The ficw limit is in effect witnin 2 minutes of feedring uncovery and allcws time for the cperator to become aware of feedring uncovery and to manually reduce auxiliary feecwater from full ficw to the acministrative limit.

2.5 Steam Line Break The possibility of water hammer events cccurring as a result of or in conjunction with a steam line break is also considered in order to determine whether this wacer hammer event could occur and cause a feedwatar line rupture.

Such a rupture could result in the blowdcwn of more chan one steam generator or result in the loss of capability to supply auxiliary feedwater.

In the event of a steam line break, the flow of auxiliary feedwater would be automatically initiated by low-low water level signals from any one steam generator, opening of the main feed pump breakers, or by a safety injection signal.

Thus the feedrings in the unaffected steam generators will be kept full of water by the automatic cperaticn of the auxiliary feedwater system.

The auxiliary feedwater system provides sufficient redundancy to ensure the required ficw to a minimum of two steam generators wnile subjected to a single failure.

To maintain a safe condition, water need be supplied to only one steam generator for primary heat remcval.

Thus the means for precluding water hammer in the unaffected steam generators would be fully effective under the conditions of a steam line break.

2.6 Loss of Coolant Accicent (LCCA)

Since the consequences of a LOCA mignt be increased by the blewdown of a steam generator during the LOCA, the possibility of a steam generator water hammer event resulting frco the plant trip or safety injection operations initiated by the LOCA should be considered.

At the Beaver Valley Power Station, a LCCA would result in a safety injection signal that would autcmatically initiate the ficw of auxiliary feecwater.

Thus the conditions necessary to produce a water hammer event after a LOCA are avoided by the same means emolcyed in the case of an crcinary reactor trip or the loss of cff-site pcwer discusseo previcusly.

75ese means will be effective in precluding water hammer events because one

conditions in the steam generator and feedwater piping that might be conducive to water ha==er will not be substantially influenced by wnether or not the reactor trip is the result of a LOCA.

IV.

CCNCLUSICNS The assessment of the capability of existing means to reduce the potential for steam generator water hammer during various hypothesized transients and conditions at the BVPS was discussed in Section III.

This assessment has shown that under conditions which are most conducive to water hammer in the feedwater system (scecifically, an uncovered and draining feedring and feedwater piping subjected to admission of cold auxiliary feedwater), the means to reduce the actential for water hammer at the BVPS are adequate to maintain a sufficiently full feedring and feedwater piping until feedring recovery cccurs.

Therefore, since keeping the feedrings and feedwater piping full of water eliminates the potential for slugging, we find that the mean'. to reduce the potential for steam generator water hammer at this facility are adequate.

9 4

V.

REFERENCES 1.

Letcer frem E. J. Woolever to A. Giambusso, Subject

" Steam Generate-Secondary System Fluid Flow Instability", July 9,1975.

2.

Letter from C. :1 Dunn to R. W. Reid, Subject

" Response to September 2, 1977 NRC ietter en Feedwater Water Hammer",

January 25, 1978.

3.

Final Safety Analysis Rbcort, Seaver Valley Power Station, Duquesne Light Co., COE Decket No. 50-334.