ML19275A887
| ML19275A887 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 03/04/1977 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Boyer V PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML19275A881 | List: |
| References | |
| NUDOCS 7910220163 | |
| Download: ML19275A887 (2) | |
See also: IR 05000352/1977001
Text
.
'
, t " # ' ' ' 7
,
4,
U'JIT!D STATES
[,
, , , ' .
NUCLEAR R eC ULUC R Y CO *."A t cS:G N
'
.
?'
7
e
i
R EGIC'J I
,
,
,'M.
n, -san Avenue
d ;*eC QF S E4 J $ 3 8,= , S C '4 N $ Y '.V A Pil A 17413
- -
-
b
4
,
,9
Occket "o. 50-352
M al n 4 '577
_
'hiladelphia Electric Ccmpany
AT 1: Mr. V. S. Soyer
Vice President
Engineering and Research
??C1 Market Straet
d..iladelphia , PA 19101
3entl emen:
Su bject: Region I Inspection Report No. 50-352/77-01
This refers to the inspection conductad by Mr. A. Varela of this office
on January 24-25, 1977, at the Limerick Generating Station of activities
authorized by NRC License No. CPPR-106 and to the discussions of our
findings held by Mr. Varela with Mr. J. Corcoran of your staff at the
conclusion of the inspection.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Reoort which is enclosed with this
letter. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
persenrel, and observations by the inspector.
Within the scope of this inspection, no items of nonccmpliance were
observed.
- n accordance with Section 2.790 of ;he NRC's " Rules of Practice", Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
er:losed insoection report will be placed in the NRC's public Cocument
F.c en .
If this report contains any information that you (or jour con-
tractor) believe to be proprietary, it is necessary that you make a
written application within 20 days to this office to withhold such
information frca public disclosure. Any such application must be acccm-
panied by an affidtvit executad by the cwner of the infcrmation, which
identifies the dccument or part sought to be withheld, and which contains
a statement of reascns which addresses with specificity the items which
.
t
7910220 l.b, b
_
.
.
.
Philadelphia Electric Company
2
will be considered by the Commission as listed in subparagraph (5)(4) of
-
Section 2.790. The information sought to be withheld shall be incorpor-
ated as far as possible into a separate part of the affidavit.
If we do
not hear frcm you in this regard within the specified period, the report
will be placed in the Public Cocument Rcem.
No reply to this letter is required; Fowever, should you have any ques-
tions concerning this inspection, ac will be pleased to discuss them
wi th you.
S inc erely,
, .
p-
l< f"l.
./. ~%l p.
,
o
,
Robert T. Carlson, Chief
Reactor Construction and Engineering
Support Scanch
Enclosure: Ragion I Inspection Report No. 50-352/77-01
.
.