ML19275A884
| ML19275A884 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 10/15/1976 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Boyer V PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML19275A881 | List: |
| References | |
| NUDOCS 7910220147 | |
| Download: ML19275A884 (2) | |
See also: IR 05000352/1976009
Text
_
.
.
.
's,
CO:x / t :;',Ir.*J
I,
.
- UC Li . ..
..
i
,
j
%,
.g' ;
, . .
,
- % ;" , !
u n r io -
>..vc
.b##
KIN ( OF PrayL$ ga, h e ? *i$ W LV ANS A 19406
-
,'g
Jr
--
. ....
GCI 15 UIS
License No. CPPR-106
Philadelphia Electric Company
Inspection No. 76-09
-
Attention: Mr. V. S. Boyer
Docket No. 50-352
Vice President
Engineering and Research
2301 Market Street
Philadelphia, Pennsylvania
19101
Gentlemen:
This refers to the inspection conduc'.ed by Mr. A. Toth of this of fice on
Septenber 11, 14-17, 27, 1976 at the Limerick Concrating Statice of
activities authorized by URC License No. CPPR-106 and to the discussions
the
of our findings held by Mr. Toth with Mr. Cercoran of your staff at
conclusien of the inspection.
,
Areas examined during this inspection are described in the Office of
Inspection and Enforce =ent Inspection Report which is enclosed with this
Within these areas, the inspection consisted of selective
letter.
examinations of procedures and representative records, intervieus with
personnel, and observations by the inspector.
Based on the results of this inspection, it appears that ccreain of ycur
conducted in full compliance with NRC requirements,
activities were not
as set forth in the Notice of Violation, enclosed herewith as Appendix
These items of noncompliance have been categorized into the levels
A.as cescribed in our correspondence to you dated December 31, 1974
This
notice is sent to you pursuant to the provisions of Section 2.201 of the
NRC's " Rules of ?ractice", Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within thirty (30)
days of your receipt of this notice, a written state:ent or explanation
in reply including:
(1) corrective steps which have been taken by you
and the results achieved; (2) corrective steps which will be taken to
avoid further it. ems of noncompliance; and (3) the date when full co=~
plicnce will be achieved.
With respect to Appendin A, we note that you have corrected Item No. 3,
and therefore you need not address yourself to this matter in your
response.
.
L
7010220
-
.
.
-2-
Item No. 2, shown in the Notice of Violation enclosed with this letter
is a recurrent or uncorrected item.
In your response to this letter
-
please give this matter your particular attention.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
Room.
If this
enclosures will be placed in the NRC's Public Document
report contains any infor=ation that you (or your contractor) believe ,to
be proprietary, it is necessary that you make a written application
within 20 days to this of fice to withhold such information from public
Any such application must be acccmpanied by an affidavit
disclosure.
executed by the owner of the infor=ation, which identifies the document
of reasons
or part sought to be withheld, and which centains a statement
which addresses with specificity the items which will be considered by
The
the Commission as listed in subparagraph (b)(4) of Section 2.790.
to be withheld shall be incorporated as far as
information sought
If we do not hear from
possible into a separate part of the affidavit.
you in this regard within che specified period, the report will be
,
placed in the Public Docu ent Room.
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
Robert T. Carlson, Chief
Reactor Construction and Engineering
Support Branch
Euclosures:
1.
Appendix A, Notice of Violation
2.
IE Inspection Report No. 50-352/76-09
.
W