ML19275A884

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-352/76-09 on 760911,14-17 & 27 & Notice of Violation
ML19275A884
Person / Time
Site: Limerick Constellation icon.png
Issue date: 10/15/1976
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Boyer V
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML19275A881 List:
References
NUDOCS 7910220147
Download: ML19275A884 (2)


See also: IR 05000352/1976009

Text

_

.

.

.

's,

CO:x / t :;',Ir.*J

I,

.

  • UC Li . ..

..

i

,

j

%,

.g' ;

, . .

,

  • % ;" , !

u n r io -

>..vc

.b##

KIN ( OF PrayL$ ga, h e ? *i$ W LV ANS A 19406

-

,'g

Jr

--

. ....

GCI 15 UIS

License No. CPPR-106

Philadelphia Electric Company

Inspection No. 76-09

-

Attention: Mr. V. S. Boyer

Docket No. 50-352

Vice President

Engineering and Research

2301 Market Street

Philadelphia, Pennsylvania

19101

Gentlemen:

This refers to the inspection conduc'.ed by Mr. A. Toth of this of fice on

Septenber 11, 14-17, 27, 1976 at the Limerick Concrating Statice of

activities authorized by URC License No. CPPR-106 and to the discussions

the

of our findings held by Mr. Toth with Mr. Cercoran of your staff at

conclusien of the inspection.

,

Areas examined during this inspection are described in the Office of

Inspection and Enforce =ent Inspection Report which is enclosed with this

Within these areas, the inspection consisted of selective

letter.

examinations of procedures and representative records, intervieus with

personnel, and observations by the inspector.

Based on the results of this inspection, it appears that ccreain of ycur

conducted in full compliance with NRC requirements,

activities were not

as set forth in the Notice of Violation, enclosed herewith as Appendix

These items of noncompliance have been categorized into the levels

A.as cescribed in our correspondence to you dated December 31, 1974

This

notice is sent to you pursuant to the provisions of Section 2.201 of the

NRC's " Rules of ?ractice", Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within thirty (30)

days of your receipt of this notice, a written state:ent or explanation

in reply including:

(1) corrective steps which have been taken by you

and the results achieved; (2) corrective steps which will be taken to

avoid further it. ems of noncompliance; and (3) the date when full co=~

plicnce will be achieved.

With respect to Appendin A, we note that you have corrected Item No. 3,

and therefore you need not address yourself to this matter in your

response.

.

L

7010220

-

.

.

-2-

Item No. 2, shown in the Notice of Violation enclosed with this letter

is a recurrent or uncorrected item.

In your response to this letter

-

please give this matter your particular attention.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

Room.

If this

enclosures will be placed in the NRC's Public Document

report contains any infor=ation that you (or your contractor) believe ,to

be proprietary, it is necessary that you make a written application

within 20 days to this of fice to withhold such information from public

Any such application must be acccmpanied by an affidavit

disclosure.

executed by the owner of the infor=ation, which identifies the document

of reasons

or part sought to be withheld, and which centains a statement

which addresses with specificity the items which will be considered by

The

the Commission as listed in subparagraph (b)(4) of Section 2.790.

to be withheld shall be incorporated as far as

information sought

If we do not hear from

possible into a separate part of the affidavit.

you in this regard within che specified period, the report will be

,

placed in the Public Docu ent Room.

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

Robert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

Euclosures:

1.

Appendix A, Notice of Violation

2.

IE Inspection Report No. 50-352/76-09

.

W