Text

.

.

,

o

UNITED STATES

8

NUCLEAR REGULATORY COMMISSION

o

g

.r

REGION il

o

tot MARIETTA sT,, N.W.. SulTE 310o

k

ATLANTA, GEORGIA 3o3o3

g*****"

In Reply Refer To:

RII:WPK

SEp 0 61979

50-413/79-17

50-414/79-17

.

Duke Power Company

Atta:

L. C. Dail, Vice President

Design Engineering

Post Office Box 33189

Charlotte, North Carolina 28242

Gentlemen:

This refers to the inspection conducted by W. P. Kleinsorge of this

office on August 21-24, 1979 of activities authorized by NRC Construction

Permit Nos. CPPR-116 and CPPR-117 for the Catawba facility, and to the

discussion of our findings held with R. L. Dick at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

During the inspection it was found that certain activities under your

license appear to be in noncompliance with NRC requirements. This item

and references to pertinent requirements are listed in the Notice of

Violation enclosed herewith as Appendix A.

Corrective actions to prevent

recurrence were completed prior to the conclusion of this inspection;

therefore, a reply is not requested.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractor)

believe to be proprietary, it is necessary that you make a writtec

application within 20 days to this office to wPhhold such information

from public disclosure. Any such application must include a full statement

of the reasons on the basis of which it is claimed that the information

is proprietary, and should be prepared so that proprietary information

identified in the application is contained in a separate part of the

document.

If we do not hear from you in this regard within the specified

period, the report will be placed in the Public Document Room.

~

1185 009

7910180

'

.

SEP 0 61979

.

Duke Power Company

-2-

. .

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

,

C. E. Murphy, Ch'

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-413/79-17

and 50-414/79-17

cc w/ enclosures:

D. G. Beam, Project Manager

Post Office Box 223

Clover, South Carolina 29710

1185 010