Text
.
.
,
o
UNITED STATES
8
NUCLEAR REGULATORY COMMISSION
o
g
.r
REGION il
o
tot MARIETTA sT,, N.W.. SulTE 310o
k
ATLANTA, GEORGIA 3o3o3
g*****"
In Reply Refer To:
RII:WPK
SEp 0 61979
50-413/79-17
50-414/79-17
.
Duke Power Company
Atta:
L. C. Dail, Vice President
Design Engineering
Post Office Box 33189
Charlotte, North Carolina 28242
Gentlemen:
This refers to the inspection conducted by W. P. Kleinsorge of this
office on August 21-24, 1979 of activities authorized by NRC Construction
Permit Nos. CPPR-116 and CPPR-117 for the Catawba facility, and to the
discussion of our findings held with R. L. Dick at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
During the inspection it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. This item
and references to pertinent requirements are listed in the Notice of
Violation enclosed herewith as Appendix A.
Corrective actions to prevent
recurrence were completed prior to the conclusion of this inspection;
therefore, a reply is not requested.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a writtec
application within 20 days to this office to wPhhold such information
from public disclosure. Any such application must include a full statement
of the reasons on the basis of which it is claimed that the information
is proprietary, and should be prepared so that proprietary information
identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified
period, the report will be placed in the Public Document Room.
~
1185 009
7910180
'
.
SEP 0 61979
.
Duke Power Company
-2-
. .
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
,
C. E. Murphy, Ch'
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-413/79-17
and 50-414/79-17