ML19275A373
| ML19275A373 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 08/21/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML19275A374 | List: |
| References | |
| NUDOCS 7910040192 | |
| Download: ML19275A373 (2) | |
See also: IR 05000324/1979026
Text
7h
'
V
Q 59
pn etco
f
fo
UNITED STATES
695
g
! 'k . fr
NUCLEAR REGULATORY COMMISSION
$[ h v /) n
.
-
E
REGION 11
101 MARIETTA ST., N.W., sulTE 310o
g
,/
ATLANTA, GEoRG!A 30303
.....
AUG 211979
,
In Reply Refer To:
RII:LM
50-325/79-27
50-324/79-26
Carolina Power and Light Company
ATTN:
Mr. J. A. Jones
Executive Vice President and
Chief Operating Officer
411 Fayetteville Street
Raleigh, N. C.
27602
Gentlemen:
This refers to the inspection conducted by L. Modenos of this office on July 26-27,
1979, of activities authorized by NRC Operating License Nos. DPR-71 and DPR-62
for the Brunswick Steam Electric Plant Unit I and 2 facilities, and to the
discussion of our findings held with A. C. Tollison at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement cf the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this. regard within
tia q,ecified period, the report will be placed in the Public Document Room.
9
e
s
I"*
b
t095 n}o
7910040/ Q P
.
AUG 21 B79
.
Carolina Power and Light
-2-
Company
.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
[
C. E. Murphy, Chief
Reactor Construction and Engineering
Support Branch
Enclosure:
Inspection Report Nos. 50-325/79-27
and 50-324/79-26
cc w/ enc 1:
A. C. Tollison, Jr.
Plant Manager
Box 458
Southport, N. C.
28461
-
9
4095
359
.