UNITED STATES
7
8
NUCLEAR REGULATORY COMMISSION
~
, , ,
,,
{q,g * v f. E
~
.
REGION 11
i
101 MAR KTT A ST , NW., sulTE 3100
,/
ATI.ANTA GEoRCIA 3o3o3
....
In Reply Refer To:
JUL 0 51979
'
~
RII:JRH
50-424/79-11
50-425/79-11
..
Georgia Power Company
Attn:
J. H. Hiller,*Jr.
Executive Vice Yresident
270 Peachtree Street
Atlanta, Georgia 30303
Gentlemen:
This refers to the inspection conducted by J. R. Harris of this office
on June 12-14, 1979 of activities authorized by NRC Construction Permit
Nos. CPPR-108 and CPPR-109 for the Vogtle Nuclear Plant facility, Units I
and 2, and to the discussion of our findings held with K. M. Gillespie
at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
We have examined actions you have taken with regard to previously
identified inspection findings. These are discussed in the enclosed
inspection report.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. These
items and references to pertinent requirements are listed in the Notice
of Violation enclosed herewith as Appendix A.
This notice is sent to
you pursuant to the provisions of Section 2.201 of the NRC's " Rules of
Practice", Part 2, Title 10, code of Federal Regulations. Section 2.201
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by you, and the results achieved;
(2) corrective steps which will be t.aken to avoid further noncompliance;
and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public Document
Room. If this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written
79082707 % 1
.
.
JUL 0 51979
. Georgia Power Company
-2-
application within 20 days to this office to withhold such information
from public disclosure. Any such application must include a full statement
of the reasons on the basis of which it is claimed that the information
is proprietary, and should be prepared so that proprietary information
identified in the application is contained in a separate part of the
document.
If we'do not hear from you in this regard within the specified
period, the report will be placed in the Publi- Scument Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
'
C. E. Murphy, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appe?. dix A, Notice of Violation
2.
Inspection Report ilos. 50-424/79-11
and 50-425/79-11
cc w/ enclosures:
K. M. Gillespie
Construction Project Manager
Post Office Box 282
Waynesboro, Georgia 30830
E. D. Grover
QA Site Supervisor
Post Office Box 282
Waynesboro, Georgia 30830